Text
s 4
SONIBUSTION ENGINEENING November 4,1989 LD-88-128 Docket No. STN 50-470F (Project No. 675)
Mr. Guy Vissing, Project Manager Standardization and Non-Power Reactor Project Directorate Office of Nuclear Reactor Regulation Attn:
Document Control Desk U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Response to NRC Request for Additional Information Concerning Chapter 17, CESSAR-DC QualPy Assurance
References:
(A) Letter, G. S. Vissing (NRC) to A. E. Scherer (C-E), dated February 26, 1988 (B) Letter, A. E. Scherer (C-E) to G. S. Vissing (NRC). LD-88-033, dated May 26, 1988 (C) Letter, A. E. Scherer (C-E) to J. W. Rode (NRC).
LD-88-109, dated October 3,1988
Dear Mr. Vissing:
Reference ( A) requested that Combustion Engineering provide additional information on our Topical Repor' CENPD-210-A, Revision 4, "Quality Assurance Program".
Reference (B) provided our detailed responses to six (6) of the twenty-two (22) questions and stated that the remaining sixteen (16) questions would be addressed in Revision 05 of CENPD-210 which was being prepared.
We recently have completed Revision 05 to CENPD-210 and transmitted it to NRC via Reference (C).
Enclosure (1) to this letter provides a tabla which identifies the specific location in CENPD-210, Revision 05 where each of the sixteen (16) remaining questions are addressed.
Enclosure (2) provides a copy of CENPD-210, Revision 05 with the specific locations identified.
8911160402 001104
}
PDR ADOCK 05000470 A
PNU y
Power Systems 10N Prospect H a Road C03) 6S1911 Comteten Engwrny tre Post 0"<e Boi 500 Teea 93237 W.ndsor. Connec* cut OM35 0500 i
Mr. Guy VI::ing LD-88-128 November 4,1988 Page 2 Should you have any further questions regarding this transmittal, please feel free to contact me or Mr. S. E. Ritterbusch of my staff at (203) 285-5200.
Very truly yours, COMBUSTION ENGINEERING, INC.
J'y A. F cherer Director Nuclear Licensing AES:jeb
Enclosures:
As Stated cc:
Mr. Frank Ross (DOE-Germantown) i i
s Enclosure (1) 5 to LD-88-128 Page 1 of 2 t
t l
I I
Response to NRC Request for Additional I
i information Concerning Chapter 17. CESSAR-DC Quality Assurance i
f 6
9 I
I r
v 1
I r
l
[
i i
e 4
]
s Enclosure (1) o to LD-88-128 Page 2 of 2 NRC Questions on Quality Assuranco Cross Reference to CENPD-210 Rev. 05 NRC Question CENPD-210 Rev. 05 Page(s) 260.3 5, G. Table III-1 260.5 11 260.7 2
1 260.9 3, 6, 8, 9, 10, Table Ill-1 1
260.11 7
260.12 13 l
l 260,13 3, 13, 14, 15 260.14 15
[
260,15 16 260.16 19 260.17 22, 29, 30 260.18 17, 21 i
260.19 23, 24 i
260.20 25 260.21 29, 30 260.22 30, 31 i
t i
i l
l i
s Enclosure (2) i to LD-88-128 44 Pages (Last page is #39) r Marked up Copy of CENPD-210, Revision 05, i
Showing the Location of Response to NRC Questions on Quality Assurance l