LD-87-068, Forwards Proposed Amend to CESSAR FSAR Describing Sys 80 Plus Design.Mods Comply W/Standardization & Severe Accident Policy Statements & Results in Upgrading of Final Design Approval FDA-2.Clarification of NRC Fees Requested

From kanterella
(Redirected from LD-87-068)
Jump to navigation Jump to search
Forwards Proposed Amend to CESSAR FSAR Describing Sys 80 Plus Design.Mods Comply W/Standardization & Severe Accident Policy Statements & Results in Upgrading of Final Design Approval FDA-2.Clarification of NRC Fees Requested
ML20236W011
Person / Time
Site: 05000470
Issue date: 11/30/1987
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Miraglia F
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
Shared Package
ML20236W013 List:
References
LD-87-068, LD-87-68, NUDOCS 8712070222
Download: ML20236W011 (2)


Text

,

7 p -, i SOMNIISTION E5ISINEERINS November 30, 1987 LD-87-068 I

Docket: STN 50-470F l

Mr. Frank J. Miraglia Associate Director for Projects j office of Nuclear Reactor Regulation ,

Attn: Document Control Desk j U.S. Nuclear Regulatory Commission  !

Washington, DC 20555 ,

Subject:

Combustion Engineering Standard Safety Analysis Report

References:

(A) Letter, LD-87-050, A. E. Scherer (C-E) to F. J. Miraglia (NRC), dated September 18, 1987 4

(B) Letter, L. S. Rubenstein (NRC) to .

A. E. Scherer, (C-E) dated October 13, 1987 l l

Dear Mr. Miraglia:

As you 'are aware, Combustion Engineering has undertaken a series of  !

modifications to the Combustion Engineering Standard Safetg Analysis l Report - FSAR (CESSAR-F) which described our System 80 design.

These modifications are in compliance with the Standardization and Severe Accident Policy Statements and are intended to result in the upgrading of i our current Final Design Approval (FDA-2) to a Design Certification. The enhanced and expanded design will be called System 80+M. Since the goal of our program is to upgrade our current FDA-2 to a Design Certification, we will refer to the revised CESSAR-F as CESSAR-DC.

Our recommendation on the docketing process and your response have been described in the reference letters. Pending final resolution of these concerns, the enclosure to this letter provides you with the planned revisions to Chapters 10 and 17 of CESSAR. The revisions are identified by bars in the right-hand column which are numbered as Amendment 12.

In addition, we continue to request some clarification of the category and limit of the fees to which we will be liable. If we could continue to 8712070222 871130 0 ADDCK 0500 g g) o gDR Power Systems 1000 Prospect Hdi Road (203) 688-1911 i Combustion Engineering, Inc. Post Office Box 500 Telex: 99297 l Windsor, Connecticut 06095-0500 I 1

- - - - - 1

'- M8. Frank Miraglia LD-87-068

' November 30, 1987' Page 2 reserve our rights in this matter, however, it should be possible to resolve the issue in parallel with our formal submittals and thus allow the technical review to proceed unencumbered.

If you have any questions, please feel free to call me or Dr. Michael D.

Green of my staff at (203) 285-5204.

Very truly yours, COMBUSTION ENGINEERING, INC.

"2 &

Director Nuclear Licensing AES:ss

Enclosure:

As Stated i

l l

1 I

- _ _ - _ - - - _ _ _ _ _ _ - - - _ _ _ _ _ _ _ . __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___- __-___ _____