L-PI-16-074, Follow-up to Interim Report Submitted Under 10 CFR 21.21(a)(2) Regarding New Undervoltage Relay

From kanterella
(Redirected from L-PI-16-074)
Jump to navigation Jump to search
Follow-up to Interim Report Submitted Under 10 CFR 21.21(a)(2) Regarding New Undervoltage Relay
ML16238A118
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/24/2016
From: Northard S
Northern States Power Company, Minnesota, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-16-074
Download: ML16238A118 (2)


Text

1717 Wakonade Drive Welch, MN 55089 Xcel Energy@

RESPONSIBLE BY NATUR 800.895.4999 xcelenergy. com AUG 2 4 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Followup to Interim Report Submitted under 10 CFR 21.21 (a)(2)

Reference:

L-PI-16-074 10 CFR 21

1. S. Northard, NSPM, letter to NRC Document Control Desk, "Interim Report of a Deviation or Failure to Comply," L-PI-16-036, 4/14/2016 (ADAMS Accession Number ML16106A207)

Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM") submits this followup report to the interim report (Reference 1) submitted pursuant to 10 CFR 21.21 (a)(2).

NSPM has completed its evaluation of a high contact resistance discovered during bench testing of a new undervoltage relay manufactured by ABB (Part number 27N411T0375). The relays were returned to the supplier for testing, and all testing of the relay was satisfactory. No nonconformance was identified, and the relay was not modified, nor altered, nor repaired. The condition is not reportable under Part 21.

If there is any question or if additional information is needed, please contact Dr. Glenn A. Carlson, P.E., at 651-267-1755.

Summary of Commitments This letter contains no new commitment nor revision to an existing commitment.

Scott Northard Site Vice President-Prairie Island Nuclear Generating Plant Northern States Power Company-Minnesota

Document Control Desk Page 2 cc:

Regional Administrator, Region Ill, USNRC Project Manager, Prairie Island Nuclear Generating Plant, USNRC Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC State of Minnesota