_ Xcel Energy JAN 2 6 2016 ,- ,L-PI-16-006

  • * ...... " *' " 'RIS 2015-05 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Operator Examination Updated Data for Prairie Island Nuclear Generating Plant

Reference:

1) NSPM to NRC, "Operator Examination Updated Data for Prairie Island Nuclear Generating Plant," (L-PI-15-067) dated August 4, 2015 Northern States Power Company, a Minnesota corporation (NSPM), dlbla Xcel Energy submitted on August 4, 2015 updated operator licensing examination data on NRC Form 536 for calendar years 2017 through 2020 for Prairie Island Nuclear Generating Plant (Reference 1).

This was in response to the NRC Regulatory Issue Summary 2015-05, "Preparation and Scheduling of Operator Licensing Examinations", dated April 20, 2015. However, the class information that was submitted has been updated. A new NRC Form 536 for Prairie Island Nuclear Generating Plant operator licensing exam data is enclosed with this letter.

If you have any questions regarding this request, please contact Chad Boegeman at (651) 267-7328.

Regulatory Commitments This letter makes no new commitments or changes to any existing commitments.

Kevin Davison Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC "

Project Manager, Prairie Island Nuclear Generating Plant, USNRC, NRR J1 {

Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC -

1717 Wakonade Drive East

  • Welch, Minnesota 55089-9642 Telephone: 651.388.1121

ENCLOSURE Operator Licensing Examination Data for Prairie Island Nuclear Generating Plant, Units I and 2 1 page follows

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 10/31/2017

(,01-2015) fna Estimated burden per response to comply with this voluntary information collection request I

  • :*) ("*g.,,;*. .. ,.>=hour. This infonnation collection is used to plan budgets and resources for operator examinations. Send comments regardting burden estimate to the FOIA, Privacy, and Information

=* =, OPERALTOR LICENSING Collections Brenoh (f-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

% " EXAMVINATION DATA 20555-0001, or by internet e-mail to Infocollects.Resourcei~nrc.gov, and to the Desk Officer,

" *.,..,*'=Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office ot Management and Budget, Washington, DC 20503. Iframeans used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

F~ACILUTY NRC REGION Prairie Island Nuclear Generating Plant III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY 2019 CY 2020 CY 2021 ESTIMATED NUMBER OF LICENSEE-PREPARED1010 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED0000 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2018 CY 2019 CY 2020 CY 2021 NUMBER OF REACTOR6040 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 11 070 NUMBER OF SENIOR REACTOR1010 OPERATORS - UPGRADE0 NUMBER OF SENIOR REACTOR0000 OPERATORS - LIMITED0 PROPOSED DATES PRIMARY DATE 09/17/2018 06/08/2020 ALTERNATE DATE 09/24/2018 06/15/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 cY 2018 PROPOSED _________ ________

NUBR MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 17 0 0 11 0 CANDIDATES NIRCFORM 536 (01-2015)

_ Xcel Energy JAN 2 6 2016 ,- ,L-PI-16-006

  • * ...... " *' " 'RIS 2015-05 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets Nos. 50-282 and 50-306 Renewed Facility Operating License Nos. DPR-42 and DPR-60 Operator Examination Updated Data for Prairie Island Nuclear Generating Plant

Reference:

1) NSPM to NRC, "Operator Examination Updated Data for Prairie Island Nuclear Generating Plant," (L-PI-15-067) dated August 4, 2015 Northern States Power Company, a Minnesota corporation (NSPM), dlbla Xcel Energy submitted on August 4, 2015 updated operator licensing examination data on NRC Form 536 for calendar years 2017 through 2020 for Prairie Island Nuclear Generating Plant (Reference 1).

This was in response to the NRC Regulatory Issue Summary 2015-05, "Preparation and Scheduling of Operator Licensing Examinations", dated April 20, 2015. However, the class information that was submitted has been updated. A new NRC Form 536 for Prairie Island Nuclear Generating Plant operator licensing exam data is enclosed with this letter.

If you have any questions regarding this request, please contact Chad Boegeman at (651) 267-7328.

Regulatory Commitments This letter makes no new commitments or changes to any existing commitments.

Kevin Davison Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC "

Project Manager, Prairie Island Nuclear Generating Plant, USNRC, NRR J1 {

Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC -

1717 Wakonade Drive East

  • Welch, Minnesota 55089-9642 Telephone: 651.388.1121

ENCLOSURE Operator Licensing Examination Data for Prairie Island Nuclear Generating Plant, Units I and 2 1 page follows

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 10/31/2017

(,01-2015) fna Estimated burden per response to comply with this voluntary information collection request I

  • :*) ("*g.,,;*. .. ,.>=hour. This infonnation collection is used to plan budgets and resources for operator examinations. Send comments regardting burden estimate to the FOIA, Privacy, and Information

=* =, OPERALTOR LICENSING Collections Brenoh (f-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

% " EXAMVINATION DATA 20555-0001, or by internet e-mail to Infocollects.Resourcei~nrc.gov, and to the Desk Officer,

" *.,..,*'=Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office ot Management and Budget, Washington, DC 20503. Iframeans used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

F~ACILUTY NRC REGION Prairie Island Nuclear Generating Plant III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY 2019 CY 2020 CY 2021 ESTIMATED NUMBER OF LICENSEE-PREPARED1010 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED0000 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2018 CY 2019 CY 2020 CY 2021 NUMBER OF REACTOR6040 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 11 070 NUMBER OF SENIOR REACTOR1010 OPERATORS - UPGRADE0 NUMBER OF SENIOR REACTOR0000 OPERATORS - LIMITED0 PROPOSED DATES PRIMARY DATE 09/17/2018 06/08/2020 ALTERNATE DATE 09/24/2018 06/15/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 cY 2018 PROPOSED _________ ________

NUBR MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 17 0 0 11 0 CANDIDATES NIRCFORM 536 (01-2015)