Xcel~ ergyo414 Nicollet Mall - MP4 Minneapolis, MN 55401 August 4, 2015 L-PI-1 5-067 RIS 2015-05 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Dockets 50-2 82, 50-306 Renewed License Nos. DPR-42 and DPR-60 Operator Examination Updated Data for Prairie Island Nuclear Generatinqi Plant

Reference:

1) NSPM to. NRC, "Operator Examination Data," (L-XE-15-012) dated May 15, 2015 Northern States Power Company, a Minnesota corporation (NSPM), d/bla XceI Energy submitted on May 15, 2015, the operator licensing examination data on NRC Form 536 for calendar years 2017 through 2020 for Prairie Island Nuclear Generating Plant (Reference 1). This was in response to the NRC Regulatory Issue Summary 2015-05, "Preparation and Scheduling of Operator Licensing Examinations", dated April 20, 2015.

However, the class information that was originally submitted on May 15, 2015 has been updated. A new NRC Form 536 for Prairie Island Nuclear Generating Plant operator licensing exam data is enclosed with this letter.

If you have any questions regarding this request, please contact Chad Boegeman at (651) 267-7328 or Tim Borgen at (651) 267-7211.

Recqulatory Commitments This letter makes no new commitments or changes to any existing commitments.

Director, Site Operations Northern States Power Company - Minnesota Enclosure 'fA~ ZJ t cc: Administrator, Region III, USNRC A *-._

Project Manager, Prairie Island Nuclear Generating Plant, USNRC, NRR i -

Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC

ENCLOSURE Operator Licensing Examination Data for Prairie Island Nuclear Generating Plant, Units 1 and 2 1 page follows

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 10/31/2017 (01-2015) *' Estimated burden per response to comply withthis voluntary intormation collection request: 1

+ o*, hour. This information collection is used to plan budgets and resources for operator

"* * ' g examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information

  • P R T R I E S N Collections Branch (T1-5F53), U.S. Nuclear Regulatory Commission, Washington, DC

~0 EXAMINATION DATA 20555-0001 or by internet e-mail to lntocollects.Resoucenrc*gon and to the Dek Offcr,

  • .. *.',, ~~~Off ce ofIfrainadRegulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Prairie Island Nuclear Generating Plant III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY 2019 CY 2020 CY 2021 ESTIMATED NUMBER OF LICENSEE-PREPARED l 1 0l EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAM INATION S B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2018 CY 20] 9 CY 2020 CY 2021 NUMBER OF REACTOR4404 OPERATORS4404 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7 7 0 7 NUMBER OF SENIOR REACTOR1 01 OPERATORS - UPGRADE]10I NUMBER OF SENIOR REACTOR0000 OPERATORS - LIMITED0000 PROPOSED DATES PRIMARY DATE 03/19/2018 12/09/2019 09/13/2021 ALTERNATE DATE 03/26/2018 12/16/2019 09/20/2021 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2018 PROPOSED ____________ ___

NUBR MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 12 0 0 12 0 0 0 CANDIDATES NRC FORM 536 (01-2015)