L-PI-11-085, Initial License Examination Reference Materials Transmission Letter

From kanterella
Jump to navigation Jump to search
Initial License Examination Reference Materials Transmission Letter
ML12214A588
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/09/2011
From: Schimmel M
Northern States Power Co, Xcel Energy
To:
Region 3 Administrator
References
L-PI-11-085, NUREG-1021
Download: ML12214A588 (2)


Text

ENCLOSURE CONTAINS COMPANY CONFIDENTIAL INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10CFR 2.390.

tl Xcel Energy SEP 0 9 2011 L-PI-11-085 NUREG-1021 Regional Administrator, Region III U S Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Prairie Island Nuclear Generating Plant (PINGP) Initial Operator Licensing Examination Reference Materials

Reference:

1. Nuclear Regulatory Commission (NRC) letter to Mr. Mark A. Schimmel, "Prairie Island Nuclear Generating Plant, Units 1 and 2, Confirmation of Initial License Examination," dated August 16, 2011, Accession Number ML11229A778.

In response to Reference 1, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), submits the reference materials (Enclosu're 1) for the initial operator licensing examinations to be administered at PINGP the weeks of May 14 and 21, 2012. This information is provided in accordance with guideline ES-201, Attachment 3.

The enclosure contains company confidential information. Pursuant to 10 CFR 2.390, NSPM requests the enclosure be withheld from public disclosure.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

4J£.,~'

Mark A. Schimmel Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East

  • Welch, Minnesota 55089-9642 Telephone: 651.388.1121 SEP 1 2 2011

Regional Administrator, Region III Page 2 Enclosure cc: Dell McNeil, US NRC Region III, with enclosure Hironori Peterson, US NRC Region III, without enclosure