L-99-212, Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999

From kanterella
(Redirected from L-99-212)
Jump to navigation Jump to search
Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999
ML17241A472
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/24/1999
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17241A473 List:
References
L-99-212, NUDOCS 9910060164
Download: ML17241A472 (2)


Text

CATEGORY. 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RXDS)

ACCESSION NBR:9910060164 DOC.DATE: 99/09/24 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

TRUTH.NAME AUTHOR AFFILIATION STALL,J.A.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFXLIATION Records Management Branch (Document Control Desk)

DOCKET 05000335

SUBJECT:

Forwards rev 1 to Plant Change/Mod (PCM) 99016 to "St Lucie Unit 1,Cycle 16 COLR," IAW TS 6.9.1.11.d.Refueling overhaul activities are currently in progress

& reactor operations for cycle 16 are scheduled toicommence in Oct 1999.

DTSTRTBUTTON CODE:

A001D COPTER RECETVED:LTR 1

ENCL i

STRE: /+ I TITLE: OR Submittal:

General Distribution NOTES:

E RECIPIENT ID CODE/NAME CLAYTON,B SC COPIES LTTR ENCL 1

1 1

1 RECIPIENT ID CODE/NAME GLEAVES,W COPIES LTTR ENCL 1

1 0

INTERNAL: ACRS NRR/DSSA/SPLB NUDOCS-ABSTRACT 1

1 1

1 1

1 FILE CENTER 01 1

1 NRR/DSSA/SRXB~

1 1

OGC/RP 1

0 EXTERNAL: NOAC 1

1 NRC PDR 1

1 D

'E NOTE. TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OE COPIES REQUIRED:

LTTR 11 ENCL 10

Florida Power &Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 September 24, 1999 L-99-212 10 CFR 50.36 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re:

St. Lucie Unit 1 Docket No. 50-335 C cle16Core0 eratin Limits Re ort Pursuant to Florida Power & Light Company (FPL) Facility Operating License DPR-67 for St.

Lucie Unit 1, the Core Operating Limits Report (COLR) for operating cycle 16 is submitted herewith.

Technical Specification 6.9.1.11.d requires the COLR to be provided to the NRC upon issuance for each reload cycle.

Refueling overhaul activities are currently in progress and reactor operations for cycle 16 are scheduled to commence in October 1999.

Accordingly, the enclosure with this letter is a copy of the ST. LUCIE UNIT 1, CYCLE 16 CORE OPERATING LIMITSREPORT, Revision 1.

The header shown on each page of the COLR identifies the attachment number and revision level of the issuing

document, i.e.,

reload Plant Change/Modification (PCM) No. 99016.

Compared to the previous operating cycle, the COLR limit for the maximum negative moderator temperature coefficient has been increased under the provisions of 10 CFR 50.59, and the list of approved analytical methods has been revised.

Please contact us ifthere are any questions about this submittal.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/RLD Enclosure

. gj'1/3 cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant if 99'iQObQXb4 'ir90924 PDR ADOCK 05000335 p

PDR J

an FPL Group company