L-98-156, Forwards Rev 16 Replacement Pages to Bvps,Unit 1 Ufsar.Rev Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Ending 980122

From kanterella
(Redirected from L-98-156)
Jump to navigation Jump to search
Forwards Rev 16 Replacement Pages to Bvps,Unit 1 Ufsar.Rev Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Ending 980122
ML20236W262
Person / Time
Site: Beaver Valley
Issue date: 07/17/1998
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20236W265 List:
References
L-98-156, NUDOCS 9808050180
Download: ML20236W262 (3)


Text

j '

A N

I l

Beaver Valley Power Station Shippingport, PA 15077-0004 l

I I

SUSHIL C. JAIN (412) 393-5512 Senior Vece President July 17, 1998 Fax (724) 643-8069 Nuclear Power Division

{.gg,}36 U. S. Nuclear Regulatory Commission l

Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. I Docket No. 50-334, License No. DPR-66 Updated Final Safety Analysis Report Revision 16, January 1998 This letter forwards a signed original and ten (10) copies of Revision 16 replacement pages for the Beaver Valley Power Station, Unit No.1 Updated Final Safety Analysis Report (UFSAR). The submittal reflects changei to the facility and procedures as described in the UFSAR that were completed during the annual reporting period ending January 22, 1998. Changes completed after the reporting period may also be included.

To the best of our judgment and belief, this revision accurately presents changes made since the previous submittal which are necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements. This revision includes:

(

Changes identified in the annual " Report of Facility Changes, Tests and e

Experiments." This report is being submitted separately under the provisions of 10 CFR 50.59.

Changes resulting from technical specification amendments.

l Changes to the quality assurance program which were made under the l

e provisions of 10 CFR 50.54.

l l

Changes reflecting a more current organization.

j Editorial changes intended to correct or clarify the text and figures of e

OELIVERING the UFSAR.

l Q U AllT V iNERGV 9909050190 990717 Q

~

goa

'"E s@

^"c" A

J

Beaver Valley P wer Station, Unit No. I Updated Final Safety Analysis Report Revision 16, January 1998 Page 2 If you have any questions concerning the attached, please contact Mr. S. H. Hobbs, Director, Safety & Licensing, at (412) 393-5203.

Sincerely, MM Sushil C. Jain c:

Mr. D. M. Kem, Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator Mi. D. S. Brinkman, Sr. Project Manager i

1 l

l l

t

4 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF BEAVER

)

Subject:

Beaver Valley Power Station, Unit No.1 BV-1 Docket No. 50-334, License No. DPR-66 Updated Final Safety Analysis Report Before me, the undersigned notary public, in and for the County and 3

Commonwealth aforesaid, this day personally appeared Sushil C. Jain, to me known, who being duly sworn according to law, deposes and says that he is Senior Vice President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, he is duly authorized to execute and fde de foregoing submittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, information and belief.

Sushil C. Jain Subscribed and sworn to before me on this/Wdiay of.- L.[6 j/kk abruad8umf

~

N6t' ry Public a

Tracey A.

a e,

otary Public u,E=s%n"C";"4*fith S

Member, Pennsylvans Association ot Notanes

_