L-98-103, Forwards ISI-PSL-1-97, Form OAR-1 Owners Activity Rept, for Slp Unit 1 Second Interval,Third Period,Per ASME Section Xi.Prepared & Certified Upon Completion of Each Refueling Outage Following End of Each Insp Period
| ML17229A684 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/14/1998 |
| From: | Stall J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17229A685 | List: |
| References | |
| L-98-103, NUDOCS 9804210012 | |
| Download: ML17229A684 (4) | |
Text
CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS) eXCCESSION NBR:9804210012 DOC.DATE: 98/04/14 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
&. Light Co.
AUT'$.NA'YcE AUTHOR AFFILIATION STALL,J.A.
Florida Power E Light Co.
RECIP.NAME
'RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000335
SUBJECT:
Forwards ISI-PSL-1-97, "Form OAR-1 Owners Activity Rept,"
for SLP Unit 1 second interval, third period,per ASME Section XI.Prepared
& certified upon completion of each refueling outage following end of each insp period.
DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR 1
ENCLi SIZE:
1 + g TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code
- GL-89-04 NOTES:
E RECIPIENT ID CODE/NAME PD2-3 LA GLEAVES,W INTERNAL: ACRILE CENTER RES/DET/EIB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-3 PD AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS3 RES/DET/EMMEB NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
0 1
1 1
1 D
0 N
NOTE TO ALL "RIDSU RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 13
1I
Florida Power 5 Light Company, 6351 S. Ocean Drive, Jensen Beach, FL 34957 April 14, 1998 L-98-103 10 CFR 50.55a 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Unit 1 Docket No. 50-335 In-Service-Inspection Program Second Interval Third Period Owner's Activit Re ort Enclosed is the St. Lucie Unit 1 second interval, third period, ASME Section XIForm OAR-1, Owner's ActivityReport. The second interval and third period ended on February 11, 1998.
The Form OAR-1, Owner's ActivityReport, implements Code Case N-532. This code case, approved by the NRC for St. Lucie Units 1 and 2 on November 6, 1995, provides, an alternative to the reporting requirements of ASME Section XI, Articles IWA-6220(c) and (d), and IWA-6230. The OAR-1 report is prepared and certified upon completion of each refueling outage and submitted following the end of each inspection period.
This is the first Form OAR-1 report using the Code Case N-532 alternative and is for. the last refueling outage (SL1-15) in the third period of the second interval.
Should there be any questions, please contact us.
Very truly yours, z </2 J. A. Stall Vice President St. Lucie Plant JAS:GRM Enclosure cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 98042i00i2 9804i4 PDR ADQCK 05000335 8
0