L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2
| ML20211M977 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/30/1997 |
| From: | David Jones, Legrand R DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-97-040, L-97-40, NUDOCS 9710150211 | |
| Download: ML20211M977 (9) | |
Text
_ _ _ - -
I k
'Af 1.i.nn a o m m m e gg.,.;,o;m L 97-040
$hepingport PA 1W77 Ax4 October 8,1997 Ileaver Valley Power Station Unit 1 Docket No. 50 334, License No. DPR 66 Unit 2 - Docket No. 50-412, License No. NpF 73 Monthly Operating Renort U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit I and Unit 2 for the month of September,1997.
Respectfully,
,,ob
(;
R. L. LeGrand Division Vice President, Nuclear Operations /
Plant Manager DTJ/ sip i
g } if Enclosures cc:
NRC Regional Office 3,. m o ' ',
King of Pmssia, PA 9710150211 970930 PDR ADOCK 05000334 R
PDR lk,i! !,i i 1
t 1
NARRATIVE
SUMMARY
OF i
MONTHLY OPERATING EXPERIENCE l
UNIT 1 l
SEPTEMBER 1997 1
1 September 1 The Unit operated at a nominal value of 100% output.
through September 26
)
September 27 At 0014 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br />, the Unit commenced a planned reduction to approximately 50%
l output to perform Main Steam Safety Valve Testing. An output of 49.5% was achieved at 0616 hours0.00713 days <br />0.171 hours <br />0.00102 weeks <br />2.34388e-4 months <br />. Following successibt Main Steam Safety Valve Testing, the i
i Unit commenced to shutdown at 1819 hours0.0211 days <br />0.505 hours <br />0.00301 weeks <br />6.921295e-4 months <br /> for the planned 12th refbeling outage.
1 1
September 28 The Main Unit Generator output treakers were opened and the Unit was taken offline at 0359 hours0.00416 days <br />0.0997 hours <br />5.935847e-4 weeks <br />1.365995e-4 months <br />. Mode 2 was entered at 0438 hours0.00507 days <br />0.122 hours <br />7.242063e-4 weeks <br />1.66659e-4 months <br />. Mode 3 was entered at 0504 hours0.00583 days <br />0.14 hours <br />8.333333e-4 weeks <br />1.91772e-4 months <br />. The Unit began to cooldown for the 12th refbeling outage and entered l
Mode 4 at 1759 hours0.0204 days <br />0.489 hours <br />0.00291 weeks <br />6.692995e-4 months <br />. Mode 5 was entered at 2305 hours0.0267 days <br />0.64 hours <br />0.00381 weeks <br />8.770525e-4 months <br />.
I September 29 The Unit remained in Mode 5 for the remainder of the repon period as the 12th through refbeling outage continued.
September 30 In addition to the above, the following events which also occurred during the report period are being i
reported as required by Technical Specifications.
September 1 The Automatic Rod Position Deviation Monitor, although still fanctional, was not through considered operable per Technical Specifications.
The limiting condition for l
September 30 operation as specified in the Technical Specifications was met because the deviations l-between the indicated rod positions were verified to be within their 12 step limits by obtaining analog / digital rod positions at least once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. In addition, i
Control Rod H-2 was also considered inoperable.
The limiting condition for opastion as specified in the Technical Specifications was met by reading the detector primary voltage evri four hours.
I k
4 i
i 1
y e+
+we egwnr-r,-v--+--w y,
r-w-s-t w,,,-ve,,
r-m i-,-, c w e y w y rw, w e
+,,m,m,-w.,-ev,-w-wer w--
---w-----sre v en e--
vem,,
. - ~ _ - _ -
2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-334 UNIT BVPS Unit 1 DATE October 6,1997 j
COMPLETED BY David T. Jones j
TELEPHONE (412) 393-4962 4
MONTH September 1997 DAY AVERAGE DAILY POWER LEVfL DAY AVERAGE DAILY POW"R LEVEL (MWe Na)
(MWe Na)
I 806 17 813
)
2 803 18 817 i
3 818 19 816 4
821 20 818 i
5 817 21 830 6
811 22 826 j
7 810 23 825 8
812 24 827 9
811 25 822 l
10 809 26 815 j
11 811 27 385 12 814 28 24 13 811 29 0
14 811 30 0
15 311 31 a
16 815 i
j
. INSTRUCTIONS On this form, list the aversy daily unit power level MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
y
---n-r r-----re--y 3
m=
l OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE:
10/07/97 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393 4962 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1
- Notes
- 2. REPORTING PERIOD: SEPTEMBER 1997
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPIATE RATING (Gross MWe) :
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe) :
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810 8.
IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ant (Not MWe) :
None
- 10. REASON 9 FOR RESTRICTIONS, IF ANY:
N/A 1
d THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 6551.0 107751.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
653.1 5014.3 125662.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8 4
- 14. HOURS GENERATOR WAS ON LINE:
652.0 4986.9 123473.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1683909.0 12996062.0 300269804.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
549584.0 4281604.0 97149196.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
517054.0 4013434.0 90875003.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 90.6 76.1 67.5
- 20. UNIT AVAILABILITY FACTOR:(PFRCENT) 90.6 76.1 67.5 21 'fNIT CAPACITY FACTOR (MDC): PCT 88.7 75.6 62.0
- 12. JNIT CAPACITY FACTOR (DER) : PCT 86.0 73.4 60.2
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 23.1 15.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
THE UNIT WAS SHtJrDOWN ON 9/28/97 FOR IT'S 12TH REFUELING OUTAGE WHICH IS SCHEDUTMn TO LAS*. FOR 45 DAYS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
11/11/97 P'
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIM. CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 1
t I
o UNIT SHUTDOWNS AND POWER REDUCrlONS (220%)
Dodet No. 50-334 Unit Name BVPS Unit #1 Date Ooober 6.1997 C
- " By David T. Jones j
REPORTMONI11 Re " -- 1997 TW (412)393-4%2
{
i No.
Dese Typel Durataos R*=ma=?
Merhad of I-Syseens C
Cause & Conective Action to Psevem l
(Hours)
Shutting Event Repost #
Coded Code 5 Recurremoe j
Down i
Reacsor3 l
14 970927 S
6 B
5 N/A CC VALVEX Reduced susput to W SO% as i
Perfann piammed Main Seen Sedery
[
ValveTcstang.
[
i
[
15 970928 S
68.0 C
1 N/A RC FUELXX Time Unit sh=adawn for it's p'===ad 12th i
Itfudtag W.
f 1
h.
d i
I I
2 3
4 i
L F-Famend Remmet Madud-Eduket F-Immesassse far Pp arDana Esary S&he6sind AF.
Fasimse(FW)
I-Mammal senses $sr!- Ewas Rayset(LER) File j
B h er Test 2-Mesment Saame (NUltB00461)
C-Raduaisug 3-Amassumaic Samum e.
,R= arms-.
4 coma a e.-Fm==s w-mi EOpusmear Treming A liomune Emana 3-Rh 3
[
F-Adsumsmarunswe 90deur FW H-Samme Source GO arshemmiErvar(Empine)
P HOsw(Emplemm) t
NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE UNIT 2 SEPTEMBER 1997 September 1 The Unit operated at a nominal value of 100% output for the entire report period, through September 30
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-412 UNIT BVPS Unit 2 DATE, Getober 6,1997 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 MONTH September 1997 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1 815 17 820 2
809 18 826 3
832 19 823 4
836 20 822 5
831 21 836 6
825 22 833 7
822 23 833 8
823 24 837 9
822 25 832 10 821 26 832 11 824 27 831 12 826 28 826 13 825 29 826 14 825 30 827 15 824 31 i
16 822 INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
m_
i a
f OPERATING DATA REPORT DOCKET NO.:
50 412 i
REPORT DATE:
10/07/97 j
COMPLETED BY DAVID T. JONES j
TELEPHONE:
(412) 393 4962 i
I OPERATING STATUS i
e ***********e e
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2
- Notes
- 2. REPORTING PERIOD: SEPTEMBER 1997 i
- 3. LICENSED THERMAL POWER (MWC):
2652 I
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Not MWe):
836 4
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe) :
870 l
- 7. MAX. DEPENDABLE CAPACITY (Not MWe):
820 j
8.
IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
I J
l
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A 1
i THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN RFPORTING PERIOD:
720.0 6551.0 86534.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
723.0 5780.1 73501.1
- 13. REACTOR RESERVE SNUTDOWN HOURS:
0.0 0.0 0.0 3
- 14. HOURS GENERATOR WAS ON LINE:
720.0 5742.3 73007.0 1
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
{
- 16. GROSS THERMAL ENERGY GEN. (MWH) :
1901419.0 14812747.0 182024590.0
- 17. GROSS ELECT. ENERGY GEN. (MWH) :
626422.0 4887909.0 59384332.0
- 18. NET ELECTRICAL ENERGY GE.4 (MWH):
594945.0 4625042.0 56113638.0 i
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 87.7 84.4 i
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 87.7 84.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 98.8 84.5 77.6
- 23. UNIT FORCED OUTAGE RATE: (PERLC';*)
0.0 12.3 5.1 L
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
4 3
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIOh):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A j
COlHERCIAL OPERATION N/A N/A
-,-,n,.
1 i
1 UNIT SHUTDOWNS AND POWER REDUCDONS (220%)
Dedet E 30-412 Unit Name BVPS Unut #2 Date Ocsober 6,1997 Ceepicted By Devd T. Jones REPORTMONTH
" h -1997 Teicphone (412)393-4962 No.
Date Typel Durataos Raama=7 Meehad of I w n,e Syseem C
-r Cause & Correctrve Acsses to Prewet (Hours)
Shutting Event Report #
Cadc4 Padri Recurrence Down Reactor 3 NONE 1
2 3
4 F-Ferad D-Magnet th F-Emeneum ist PtepumammetDean Esary M.
- Failure (Egiman)
I-Mamment sheses 5mr1 - Even Reyest(LIR) File h-er Tema 244mmmel Samus (ht1EOs161) casimales W samme De.
,Rosemman 4.Cs m't frama Preveses Mash Eopermer Trasnies A Guese Emmse 5-Redammen S
Fh 90emar rm s.3
,3 GOperassemel Emr(Explain) stoser(Emplem) i
--