L-96-280, Informs That Summary Rept Will Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days

From kanterella
(Redirected from L-96-280)
Jump to navigation Jump to search
Informs That Summary Rept Will Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days
ML17229A113
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/28/1996
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-06, GL-96-6, L-96-280, NUDOCS 9611050065
Download: ML17229A113 (6)


Text

DOCKET I 05000335 05000389 NOTES:

CATEGORY 1 REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:9611050065 DOC.DATE: 96/10/28 NOTARIZED: YES FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

'0=389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION STALL,J.A.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs that summary rept pill submitted to NRC re GL 96-06, "Assurance of Equipment Operability

& Containment Integrity During Design-Basis Accident Conditions," within 120 days.

DISTRIBUTION CODE:

A072D COPIES RECEIVED:LTR J ENCL

(

SIZE:

TITLE: GL 96-06, "Assurance of Equip Oprblty

& Contain.Integ.

during Design A

1 T

E RECIPIENT ID CODE/NAME NRR/WETZEL,B.

WIENS,L.

INTERN

FILE NSER~O RR/DSSA/SCSB EXTERNAL: NOAC COPIES LTTR ENCL 1.

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-3 PD NRR/DE/EMEB NRR/DSSA/SPLB NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 0

D U

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

I (

t

Florida Power 5 Light Company. P.O. Box128, Fort Pierce, FL34954-0128 PIPIL.

October 28, 1996 L-96-280 10 CFR 50.4 10 CFR 50. 54 (f)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 aLRespanse This letter provides the Florida Power and Light Company (FPL) initial response to Generic Letter (GL) 96-06, Assurance ofEquipment Operability and Containment Integrity During Design-Basis Accident Conditions, for St. Lucie Units 1 and 2, The GL requested an initial written response within thirty days of September 30, 1996, indicating FPL's intentions to implement the actions requested in the GL and a schedule for completion.

Within 120 days of September 30, 1996, licensees are requested to submit a written summary report stating actions taken in response to the GL, conclusions that were reached relative to susceptibility for waterhammer and two-phase flow in the containment air cooler cooling water system and overpressurization of piping that penetrates containment, the basis for continued operability of affected systems and components as applicable, and corrective actions implemented or that are planned to be implemented. Ifsystems are found to be susceptible to the conditions that are discussed in the generic letter, identify the systems affected and describe the specific circumstances involved.

FPL plans to implement the actions requested and submit a summary report in accordance with the schedule in the GL. The requested information willbe submitted by January 28,1997.

This response is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54(f).

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/GRM Attachment

$078 cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St, Lucie Plant 96ii050065 9bi028t I

PDR ADQCK 05000335 P

PDR I

an FPL Group company

Ca

~ f yf K~p~()

I

. St. L,ucie Units I and 2 Docket No. 50-335 and 50-389 L-96-280 STATE OF FLORIDA

)

)

ss.

COUNTY OF ST. LUCIE

)

J. A. Stall being first duly sworn, deposes and says:

That he is Vice President, St. Lucie Plant, for the Nuclear Division of Florida Power &Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

J. A. Stall STATE OF FLORIDA CD UN'

~~

Sworn to and subscribed before me this 28 day of Moke, 19 ll by J. A. Stall, who is personally known to me.

Name of Notary Public - State of Florida eamwEsr

,~+ ~y,:. ~~~,ss,(g g ~gygamm.

April 18, 1S98 gyp gag ~gg

""4F<,6i (Print, type or stamp Commissioned Name of Notary Public)

I g ~

tr I

Q *'