L-95-282, Provides Initial Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves
| ML17228B297 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 10/11/1995 |
| From: | Sager D FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-95-07, GL-95-7, L-95-282, NUDOCS 9510240268 | |
| Download: ML17228B297 (6) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9510240268 DOC. DATE: 95/10/11 NOTARIZED: YES FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides initial response to GL 95-07, "Pressure Locking
& Thermal Binding Of Safety-Related Power-Operated Gate Valves."
DOCKET g.
~ 05000335 P
05000389 O
i DXSTRIBUTION CODE:
A056D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Generic Ltr 95-07 Pressure Locking
& T ermal Banding of Safety Rela I NOTES:
RECXPIENT ID CODE/NAME NRR/DRPE/PDl-1 NORRIS,J INTERNA -'E CENTER 1
EXTERNAL: NOAC NUDOCS ABSTRACT COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/EMEB/B NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 D
N a
NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE 'WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5D8 (415-2083)
TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 8
ENCL 8
P.O. Box 128, Ft. Pierce, FL 34954-0128 PIPll October 11, 1995 L-95-282 10 CFR 50.4 10 CFR 50.54(f)
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.
C.
20555 RE:
St. Lucie Units 1 and 2
Docket No. 50-335 and 50-389 Generic Letter 95-07 Initial Res onse The letter provides the Florida Power and Light Company (FPL) initial response to Generic Letter (GL) 95-07 "Pressure Locking and Thermal Binding of Safety Related Power Operated Gate Valves" for St.
Lucie Units 1
and 2.
The GL requested a written response within sixty days of August 17, 1995, indicating FPL's intentions to implement the actions requested in the GL and a schedule for completion.
FPL plans to implement the actions proposed in the GL.
The information requested will be provided on or before February 13, 1996.
Should our evaluations determine that modifications are required that cannot be completed by this date, FPL will provide a schedule along with the necessary justification in the
- February, 1996 submittal.
This response is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of
- 1954, as
- amended, and 10 CFR 50.54(f).
Please contact us if there are any questions about this submittal.
Very truly yours, D. A.
ger Vice r sident St.
L ie Plant DAS/GRM Attachments cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
~ 4~r OP an FPL Group company q5102g0268 951011 PDR ADOCK 05000335 P
PDR.
-. -sJ-0 i4 I,
C
9 ~
St. Lucid Units 1 and 2
Docket No. 50-335 and 50-389 Generic Letter 95-07 Initial Res onse STATE OF FLORIDA
)
COUNTY OF ST.
LUCIE
)
ss D. A. Sager being first duly sworn, deposes and says:
That he is Vice President, St. Lucie Plant for the Nuclear Division of Florida Power
& Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
ger STATE OF FLORIDA COUNTY OF S7
. LUCLM The foregoing instrument was acknowledged before me this ~/
day of QC5) ~
19 by D. A. Sager, who is personally known to me and who did take an oath.
A~A( WEs
(
Name of Notary Public My Commission expires 4
/8 fZ Commission No. MB 9 Z ellelee KARENWar ies MY(IMM($S(0(( f(g35gg@ gp(RES A(e (8. (Sss
'i8, ~Nl~'KEOTHRU TROY Fgg g@gygp pg
V
~
I p