Application for Amends to Licenses DPR-13 & DPR-41 to Revise Plant TS 2.1.1 Safety limit-reactor core,2.2 Limiting Safety Sys settings-reactor Trip Sys Instrumentation Setpoints & 3/4.2.5 Power Distribution limits-DMB Parameters
ML17352B146
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/05/1995
From: Plunkett T
Florida Power & Light Co
To:
Shared Package
ML17352B147 List:
References
L-95-131, NUDOCS 9505120124
Download: ML17352B146 (7)


Text

PRIDRI EY Z REGULAT i."CN@5NQ899NESl~IlBSTION LSTEM (RIDS)

ACCESSION NBR:9505120124 DOC.DATE: 95/05/05 NOTARIZED: YES DOCKET ¹ FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C'5000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida RECIP.NAME RECIPI Power

& Light Co.

ENT AFFILZATZON

~~+/3'7/J NOTES:

le P

SUBJECT:

Application for amends to licenses DPR-13

& DPR-41 to revise plant TS 2.1.1 safety limit-reactor core,2.2 limiting safety R

sys settings-reactor trig sys instrumentation setpoints 3/4.2.5 power distribution limits-DMB parameters.

DISTRIBUTION CODE:

APOZD COPIES RECEIVED:LTRj ENCL SIZE:

~ 2I TITLE: Proprietary Review Distribution Pre Operating icense

& Operating R 0 i

RECIPIENT ID CODE/NAME PD2-1 LA CROTEAU,R INTERNAL'&i CENTER EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 t gp RECIPIENT ID CODE/NAME PD2-1 PD OGC/HDS3 COPIES LTTR ENCL 1

1 1

0 D

C YOTE TO ALL"RlDS" RECIPI Ei'ITS:.

PLEASE HELP US TO REDUCE 'O'ASTE! COi4TACTTHE DOCL'MEiTCOYTROL DESK, ROOM P1.37 (EXT. 504-2033 ) TO ELIMIYATEYOUR YAME FROM DISTRIBU I'IOY; LISTS FOR DOCUKIEYTS YOU DOi "I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 6

ENCL 4

~ (

8 lt I

S i

~

p

HAY OS Sgg, L-95-131 10 CFR 50.36 10 CFR 50.90 U.S..Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Proposed License Amendments Implementation of the Revised Thermal Design Procedure and Steam Generator Water Level Low-Low Set oint In accozdance with 10 CFR 50.90, Florida Power and Light Company (FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to revise the Turkey Point Units 3 and 4 Technical Specification (TS) 2.1.1, Safety Limit Reactor Core; TS 2.2, Limiting Safety System Settings Reactor Trip System Instrumentation Setpoints; TS 3/4.2.5 Power Distribution Limits DNB Parameters; TS 3/4.3,2 Engineered Safety Features Actuation System Instrumentation and the associated BASES.

The proposed revision to the Technical Specifications includes (a) the implementation of Westinghouse's NRC approved Revised Thermal Design Procedure (RTDP),

and (b) a revision to the Steam Generator Water Level Low-Low trip setpoint.

The RTDP methodology has been previously approved by the NRC in Westinghouse topical report WCAP-11397-P-A.

This methodology provides an increase in the Departure from Nucleate Boiling (DNB) margin by convoluting statistically the uncertainties on power, pressure, temperature, flow and the DNB correlation to define the Departure from Nucleate Boiling Ratio (DNBR) limit and coze thermal limits.

These uncertainties have been calculated for Turkey Point in Westinghouse topical report WCAP-13719, which is provided as an attachment to this submittal.

FPL has determined that the proposed license amendments do not involve a significant hazards consideration pursuant to 10 CFR 50.92.

A description of the amendment request is provided in Attachment 1.

The no significant hazards determination in support of the proposed

~ Technical Specification changes are provided in Attachment 2.

Attachment 3 provides the proposed revised Technical Specifications.

Attachment 4 contains a single copy of Westinghouse Proprietary

.Report, WCAP-13719, entitled "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Turkey Point Units 3

and 4" and a single copy of the Westinghouse Non-Proprietary Report, WCAP-13718.

Attachment 5 includes a Westinghouse authorization

letter, CAW-95-779, accompanying affidavit, Proprietary Information
Notice, and Copyright Notice.

Since Attachment 4 contains information proprietary to Westinghouse Electric Corporation, it is supported by an affidavit signed by Westinghouse, the owner of the information.

The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the 9505120124 950505 PDR ADQCK 05000250 P

PDR an FPL Group company

4

'I lt I

L-95-131 Page 2

considerations listed in paragraph (b)(4) of section 2.790 of the Commission's zegulations.

Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.790.

Correspondence with respect to the copyzight or proprietary aspects of the items listed above oz the supporting Westinghouse Affidavit should reference CAW-95-779 and should be addressed to N. J. Liparulo, Manager of Nuclear Safety Regulatory

& Licensing Activities, Westinghouse Electric Corporation, P.O.

Box 355, Pittsburgh, Pennsylvania 15230-0355.

In accordance with 10 CFR 50.91(b)(1),

a copy of these proposed license amendments is being forwarded to the State Designee for the State of Florida'he proposed amendments have been reviewed by the Turkey Point Plant Nuclear Safety Committee and the FPL Company Nuclear Review Board.

Should there be any questions on this request, please contact us.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant OIH Attachments CC:

S.

D. Ebneter, T. P.

Johnson, Plant W. A. Passetti, Rehabilitative Regional Administrator, Region II, USNRC Senior Resident Inspector,
USNRC, Turkey Point Florida Department of Health and Services

STATE OF FLORIDA COUNTY OF DADE

)

) ss.

)

T. F. Plunkett being first duly sworn, deposes and says:

That he is Vice President, Turkey Point Plant, of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

T. F. Plunkett Subscribed and sworn to before me this day of 1995.

Name of Notary Public (Type or Print)

GILUANMLE HERBENlcx L<YCOL>MNlOH8 "$2WQ m m.'s: n:~."-~ s, ~ass "fg!<""

sonrkd l.~;l4~ hMc LhCknntlea T.

F

~ Plunkett is personally known to me.

NOTARY PUBLIC, in and foz the County of Dade, State of Florida My Commission expires

-9G Commission No.

I I)

I l'