L-95-123, Forwards Rev 0 to PSL-100-AOA-95-1, St Lucie Unit 1 Second ISI Interval Request for Authorization of Alternative Exam

From kanterella
(Redirected from L-95-123)
Jump to navigation Jump to search
Forwards Rev 0 to PSL-100-AOA-95-1, St Lucie Unit 1 Second ISI Interval Request for Authorization of Alternative Exam
ML17228B115
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/27/1995
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228B116 List:
References
L-95-123, NUDOCS 9505030201
Download: ML17228B115 (3)


Text

iu )l> E.

I PRIQRITY ACCELERATED RIDS PROCESSIX REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET 05000335 NOTES:

'CCESSION NBR:9505030201 DOC.DATE: 95/04/27 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION e

P Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 0 to PSL-100-AOA-95-1, "St Lucie Unit 1 Second ISI Interval Request for Authorization of Alternative Exam."

I DISTRIBUTION CODE:

A047D COPIES RECEIVED: LTR Q ENCL g SIZE: I'HE TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 0

RECIPIENT ID CODE/NAME PD2-1 LA NORRIS,J INTERNAL:

CEPS NRR/DE/EMEB OGC/HDS3 EXTERNAL LITCO BROWN N B NOAC COPIES LTTR ENCL 1

1 1

1 6

6 1

1 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCO RANSOME N C NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 D

U N

NOTE To ALL"RIDS" RECIPIENTS:

I LEASE HELP Us To REDUCE wASTE! CONTACrTIIE DOCUMENTco~-rROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELlihII.'MTEYOUR."CAMEFROil DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 19

Flnrida Power & Light Company, P.O. Box 12$, Fort Pierce, FL 34954-012$

April 27, 1995 L-95-123 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.

C.

20555 RE:

St. Lucie Unit 1 Docket No. 50-335 In-Service-Inspection Plan Second Ten-Year Interval Request for Authorization of Alternative Examination of Reactor Vessel Welds Pursuant to 10 CFR 50.55a(g)(6)(ii)(A)(5), Florida Power and Light Company (FPL) requests approval of alternative examination requirements for the augmented reactor vessel weld inspection required by 10CFR55a(g)(6)(ii)(A).

FPL has determined that the proposed alternatives would provide an acceptable level of quality and safety.

The request for authorization of alternative examination requirements including the justification is attached.

NRC review is requested by January 15, 1996, to support planning for the next St. Lucie Unit 1 refueling outage which is currently scheduled to begin April 8, 1996.

Please contact us if there are any questions about this submittal.

Very truly yours, D. A.

Vice r St.

L ger sident e Plant DAS/GRM cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant

(

9505030201 950427 PDR ADOCK 05000335 9

'DR J

an FPL Group company