L-95-089, Special Rept:On 950517,Standby Feedwater Pump B Removed from Svc & Returned to Operable Status 950710.Caused by Prime Mover for B Standby Feedwater Pump Being Changed from Electric Motor to Diesel Driver Per Amend 164/158
| ML20094D975 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/21/1995 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| L-95-089, L-95-89, NUDOCS 9511060324 | |
| Download: ML20094D975 (3) | |
Text
- - _ _ -
G N
APR 2 ] 144; L-95-089 10 CFR 550.36 Stewart D.
Ebneter Regional Administrator, Rgien II
(
U.
S. Nuclear Regulatory Commission 101 Marietta St.,
N.W.,
Luite 2900 Atlanta, GA 30323 Mr. Stewart D.
Ebneter:
Re:
Turkey Point Units 3 & 4 Docket Nos. 50-250, 50-251 Special Report - Standby Feedwater Pump B Out of Service To Chance Pumo from Motor-driven to Diesel-driven The B Standby Steam Generator Feedwater pump is expected to be removed from service on May 17, 1995.
The expected return to service date is July 10, 1995.
In accordance with Technical Specifications 3.7.1.6 and 6.9.2, the attached Special Report provides details of the expected inoperability.
Should there be any questions on this information please contact us.
Very truly yours, f!ff T.
F.
Plunkett Vice President 1
Turkey Poi'nt Plant CLM l
Attachment l
1
(
cc:
USNRC, Document Control Desk, Washington D.C.
T.
P. Johnson, Senior Resident Inspector, USNRC, Turkey l
Point Plant 9511060324 950421 I
PDR ADOCK 05000250 P
ppg
/
'I i
an FPL Group company
l L-95-089 Attachment Dage 1 SPECIAL REPORT B STANDBY FEEDWATER PUMP INOPERABLE FOR GREATER THAN 30 DAYS PURPOSE:
Technical Specification 3.7.1. 6 Action a.
requires the submission of a special report to the NRC if a standby i
feedwater pump is inoperable for greater than 30 days.
Technical Specification 3.7.1.6 Action d.
requires the report to describe the cause of the inoperability, the actions taken and the schedule for restoration.
BACKGROUND:
furkey Point Nuclear has two non-safety grade standby feedwater pumps installed to supply feedwate.- to either the Unit 3 or Unit 4 steam generators, if needed.
CAUSE AND ACTIONS TAKEN:
As part of the implementation of Amennment 164/158 to the Technical Specifications, the prime mover for the B standby feedwater pump is l
being changed from an electric motor to a dedicated diesel driver.
This modification was discussed in our letter (L-93-200) to you, dated September 3, 1993, and approved by the issuance of Amendment 164/158 via your letter dated May 20, 1994.
SCHEDULE FOR RESTORATION:
The B standby feedwater pump will be shipped to the ven,ior for installation of the dedicated diesel driver.
As shown on the schedule included with this special report, the B standby feedwater pump is expected to be removed from service on May 17,
- 1995, shipped to the vendor on May 22/23, 1995, returned and installed by June 20, 1995, with post-modification testing complete, and the pump restored to available status, by July 10, 1995.
A letter will be submitted confirming that the pump has been returned to service.
I
(
l
7 "1f981 "T
- m ""
"*'**"?""*
- * +
" JAR
<I"":"A
- MAY-
.1-JUF t<
1 Mik. -1
- AUG > - I --
t SEP + - I ~. > OCT I
Activity"
- ? Acilvity+<
Orig c Ettty1 i Ettly c "r
m J
10 y tDescription..-
Dur
- Blatt a
- finishl DM$Egtg thjuUy,JWt)U 10.17 24.317 r.i4 2128 A.11.15 25 2 - A.15 3D P MAT 01 PROCUREIRECENE 45 08 MAR 95* 09MAY95 iPROCURE i RECEIVE MAIERIAL P SUP01 CONSTRUCTION MOBill2E 2 15MAY95*
16MAY95 DCONSTRUCTION MOEILIZE P SUP02 SIGN ON *B* SSGFP 1 17MAY95 17MAY95
- SIGN ON "B"SSGFP CLEARANCE P ELE 0001 DETERM *B*SSGFP MTR.
1 18MAY95 18MAY95 CDETERM "B"SSGFPMTR.
TH fECOOO1 DISCONNECT *B*SSGFP 1 18MAY95 18MAY95 0 DISCONNECT "B'SSGFP.SUC1DISCH., PIPING P ELE 0002 REMOVE,*B" SSGFP MOTOR 1 19MAY95 19MAY95 CREMOVE."B" SSGFP MOTOR TO STORES FELE0003 PARTIAL PULL BACK. EXIST.
2 20MAY95 22MAY95 OPARTIAL PULL DACK, EXIST. SSGFP CABLES l
P MEC0002 REMOVE,*B' SSGFP &. SKID 1 20MAY95 20MAY95 BREMOVE."B" SSGFP &, SKID P CN0002 CIRCUM-EXCAVATE EXIST.
1 22MAY95 22MAY95 0 CIRCUM-EXCAVATE EXIST, PUMP FOUND.
P SUPO3 SHIP *B". PUMP TO VENDOR 2 22MAY95 23MA(95 OSHIP "B', PUMP TOVENDOR P CIV0003 DEMOLITION OF EXIST.
3 23MAY95 25MAY95 ODEMOLITION OF EXIST. PUMP FOUND.
n/ENDOR MOUNT PUMP ON DSL SKID P VEN0001 VENDOR MOUNT PUMP ON 14 24MAY95 08JUN95 P CN0004 EXCAVATE NEW FOUND.&
3 26MAY95 29MAY95 OEXCAVATE NEWFOUND,& MEC i ELE, U. GND. PIPING P CIV0005 FAB f PLACE SSGFP FOUND.
4 30MAY95 02JUN95 CIFAB f Pt ACE ESGFP FOUND. FORMS P ELE 0004 REMOVE EXISTING 2 30MAY95 31MAY95 OREMOVE EXISRNG DUCTBANK PitEC0003 INSTALL RELIEF VLV DRAIN 2 30MAY95 31MAY95 OINSTALL RELif:F VLV DRAIN LINE t
i P ELE 0005 INSTALL NEW ELEC.
2'01JUN95 02JUN95~
OlNSTALL NEYtELEC.DUCTBANK I
P MEC0004 FABRICAT E LG. BR. PIPING &
6 01JUN95 07aVN95 CDFABRICATI: LG. BR. PIPING & SUPPTS.
I P CN0006 PLACE REBAR / ANCHORS 1 3 03JUN95 06JUN95 CPLACE REEARIANCHORS1 SLEEVES
- ELE 0006 INSTALL COND. POLISHER 1 03JUN95 03JUN95 clNSTALL ColiD. POLISHER RACEWAY ISUPPTS.
FCIV0007 PLACE i FINISH.FOUN.
1 07JUN95 07JUN95 CPLACEI FINISH,FOUN. CONCRETE P CIV0008 STRIP FORMS I CURE 2 '08JUN95 09JUN95 OSTRfP FORMSICURE F5UPO4 RECEIVE DSL SSGFP FROM 2 09JUN95 10)UN95 CRECENE DSL SSGFP FROM VENDOR EELE0007 PULL CABLES 4 10JUN95 14JUN95 C] PULL C ABLES P FE03 FLD ENG. SUBMIT CIVIL 2' iOJUN95 12JUN95 OFLD. ENG. SUBMIT CIVIL ITOP P ELE 0008 CONTROL ROOM MODS 4 15JUN95 19JUN95 C3 CONTROL ROOM MODS,(4CO2).
P MEC0005 55fi4EW DSL *B* SSGFP 2' 19JUN95 20JUN95 USET MEW DSL "B" SSGFP SKID P ' ELE 0009 5I0iftli4GIAODS.(4AC10) 2 20JUN95-21JUN95 CWlR1NG MODS,(4AC10),(4B43 LC).
E EiEC0006 INST 5LL SUCT. &.DISCH.
4 21JUN95 24JUN95 C)lN0 TALL SUCT. &,DISCH. PIPING P [LE55I6' FINAL ELEC. TIE-INS 1 22JUN95 22JUN95 CFINAL ELEC. TIE. INS
~
F5LE0011 f 5RTi!NATlONS / MODS 2' 23JUN95 24JUN95 OTERMINATIONS I MODS. DIESEL CABINET P ELE 0012 REMOVE ABANDONED H V.
4 26JUN95 29JUN95 CREMOVE ABANDONED H.V. CABLE E5LE0013 ELECT. TESTING 2' 26JUN95 27JUN95 CELECT. TESTING P MEC0007 INSTALL / MODIFY. MECH 2 26JUN95 26JUN95 al STALLI MODIFY MECH.SUPPTS.
MM 00001 M/M PERFORM FINAL PUMP 2 27JUN95 28JUN95 CMIM PERFORM FINAL PUMP ALIGN P FE01 FLD ENG. SUBMIT ELEC.
2 28JUN95 29JUN95 0 LD. ENG. SUBMIT ELEC. lTOP.
effec 0008 E5CHANICAL TESTING 2 29JUN95 29JUN95 0 AECHANICALTESTING FSUP66 IdL5ASE SSGFP 1 30JUN95 S}UN95 (RELEASE SSGFP CLEARANCE TE TE01 functionaltesteg (tech dept )
3 03JUL95 d5JUL95 Ofunctional testing (tech. dept)
P FE02 FLD ENG SUBMIT MECH 2 06JUL95 06JUL95 0FLD. ENG. S UBMIT MECH. lTOP.
P SUPOS CONSTRUCTION 2 07JUL95 10JUL95 C) CONSTRUCTION DEMOBILIZE i
m e.
FPL nm ma n m.,
DIESEL DRIVER FOR SSGFP PROJ. LEAD.E. H ASSEL (X6913)
.