L-95-019, Forwards Rev 12 to Security Plan Section 7.Encl Withheld

From kanterella
Jump to navigation Jump to search
Forwards Rev 12 to Security Plan Section 7.Encl Withheld
ML20087F228
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/11/1995
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-95-0193, PBL-95-193, NUDOCS 9508150193
Download: ML20087F228 (1)


Text

,

e Wisconsin Electnc

,(

POWER COMPANY

. Point Boocn Nuctear Ptant 6610 NucWs Rd.. T wo Rrvert VA 54241 (414) 755-2321

.PBL-95-0193 August 11, 1995-U. S. Nuclear Regulatory Commission Document Control Desk Mail Station F1 13/

Washington, D.C.

20555 DOCKETS 50-266 AND 50-301 SECURITY PLAN SECTION 7. REVISIOILJl POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Gentlemen:

Enclosed please find the revision to the Security Plan for Point Beach. The changes are being submitted in accordance with the provisions outlined in Title 10 Code of Federal Regulations, Section 50.54 (P).

If there are any questions about this revision, please feel free to contact me at (414) 755-2321.

Sincerely, S

y j

fe'#

MG. J. Maxfield Manager-PBNP The subiect matter of the enclosure to this letter is SAFEGUARDS INFORMATION and is considered to be exemot from disclosure in accordance with 10 CFR Parts 2.

50, 70, and 73.

When secarated, this oace is not SAFEGUARDS INFORMATION.

cah cc File:

SI2.2 9

'h~3* I,{

SAFEGUARDS INFORMATION Q

t 950815o193 95ogg1 PDR-ADOCK 05000266-F PDR 4 subsathir ofitinwism Exter l'orivrauer