L-93-318, Forwards COLR for Turkey Point Units 3 & 4

From kanterella
(Redirected from L-93-318)
Jump to navigation Jump to search
Forwards COLR for Turkey Point Units 3 & 4
ML17352A360
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/28/1993
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17352A361 List:
References
L-93-318, NUDOCS 9401100013
Download: ML17352A360 (3)


Text

" ACCELERATED,.

tSTBZBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9401100013 DOC.DATE: 93/12/28 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power 6 Light Co,.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards COLR for TPS units 3

6 4.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR 'NCL i

SIZE:

TITLE: OR Submittal:

General Distribution NOTES:

DOCKET 05000250 05000251 R

D RECIPIENT ID CODE/NAME PD2-2 LA RAGHAVAN,L INTERNAL: NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DORS/OTS B NRR/DRPW NRR/DSSA/SRXB REG FILE 01 NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 1

1 D

D R

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 16 ENCL 14 A

D D

S

0 0

~,

~

P

tjEC R8 1993 L-93-318 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket No. 50-250 and 50-251 Core 0 eratin Limits Re ozt By letter dated November 12,

1993, the NRC issued Amendments 156/150.

to Facility Operating License No.

DPR-31 and DPR-41 for Turkey Point Units 3 and 4, respectively.

The amendments consisted of changes to the Technical Specifications to implement a Relaxed Axial Offset (RAOC) methodology foz axial flux difference control and to relocate cycle-specific parameter limits from the Technical 'Specifications to a Core Operating Limits Report (COLR). In accordance with Technical Specification 6.9.1.7, the enclosed Core Operating Limits Report is provided foz Florida Power and Light Company Turkey Point Units 3 and 4.

These curves are applicable for the current operating cycles of Unit 3 Cycle 13 and Unit 4 Cycle 14.

If you have any questions, please contact us.

Very truly yours, g~j T. F. Plunkett Vice President Turkey Point Nuclear TFP/RJT/Kt Attachment cc:

S.

D. Ebneter, Regional Administrator, Region II, USNRC T. P.

Johnson, Sr. Resident Inspector, USNRC, Turkey Point h

O5OC,~

9401100013 931ZZS PDR ADOCK 05000Z50 P

PDR an FPL Group company pl

'