L-93-241, Application for Amend to Licenses DPR-31 & DPR-41 Revising Surveillance Requirement 4.6.1.2a & Associated Bases to Conform w/NUREG-1431,Standard Ts,Westinghouse Plants,Rev 0

From kanterella
(Redirected from L-93-241)
Jump to navigation Jump to search
Application for Amend to Licenses DPR-31 & DPR-41 Revising Surveillance Requirement 4.6.1.2a & Associated Bases to Conform w/NUREG-1431,Standard Ts,Westinghouse Plants,Rev 0
ML17352A262
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/04/1993
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17352A263 List:
References
RTR-NUREG-1431 L-93-241, NUDOCS 9310120267
Download: ML17352A262 (16)


Text

,ACCELERATED OCUMENT D1STRIBU>!ON SYSTEM

.REGULATGI -

1NFORMATION DISTRIBUTION STEM (RIDS)

ACCESSI.ON NBR:9310120267 DOC.DATE: 93/10/04 NOTARIZED: YES DOCKET I FACEL 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C

05000251 R

AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power

& Light Co.

I RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

I'UBJECT:

Application for amend to licenses DPR-31

& DPR-41 revising surveillance requirement 4.6.1.2a a associated bases to S

conform w/NUREG 1431,Standard TS,Westinghouse Plants,Rev 0.

DISTRIBUTION CODE:

ROOID COPIES RECEIVED:LTR fENCL ~

SIZE:

C7&

/

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA RAGHAVAN,L COPIES LTTR ENCL 1

1 2

2 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 1

1 D

INTERNAL: NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SRXB OC CB EG F~I'L-Ol EXTERNAL: NRC PDR 1

1 1

1 1

1 1

0 1

1 1

1 NRR/DORS/OTSB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 NSIC 1

1 1

1 1

1 1

0 1

1 D

NOTE:h'Q ALL"RIDS" RECII'IENTS:

PLEASE Ill:LP VS TO REDUCE WASTE! CONTACT TIIE DOCUMEN'I'ONTROLDESV, ROOM I'1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBU'I'ION LISTS FOR DOCUMENTS YOU DON'T NEED!

3 D

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL 13

CCT 0 41993 L-93-241 10 CFR 50.90 10 CFR 50 Appendix J U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Proposed License Amendment Containment Leaka e

Surveillance Re uirements In accordance with 10 CFR 50.90, Florida Power and Light Company (FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to revise the Surveillance Requirement 4.6.1.2a and the associated Bases to conform with NUREG 1431, Standard Technical Specifications, Westinghouse

Plants, Revision 0, dated September 1992.

This proposed license amendment involves an administrative change to the surveillance frequency for the performance of Type A Tests which determine the Overall Containment Leakage Rate.

FPL has determined that the proposed license amendment does not involve a significant hazards consideration pursuant to 10 CFR 50.92.

A description of the amendment request is provided in Attachment 1.

The no significant hazards consideration in support of the proposed Technical Specification change is provided in Attachment 2.

Attachment 3 provides the proposed revised Technical Specification change.

In accordance with 10 CFR 50.91 (b)(1),

a copy of this proposed license amendment is being forwarded to the State Designee for the State of Florida.

The proposed amendment has been reviewed by the Turkey Point Plant Nuclear Safety Committee and the FPL Nuclear Review Board.

93i0120267'3i004, PDR ADOCK 05000250 P

"PGR an FpL Group companY

A J

L-93-241 Page 2

FPL requests that this proposed license amendment be reviewed and issued by the end of June,

1994, so that this request will be in effect for the next Turkey Point Unit 4 outage which is scheduled to be performed in the Fall of 1994.

FPL intends to request an exemption from certain requirements of 10 CFR 50 Appendix J for the Type A Test interval that would allow FPL to perform the Type A Test every third refueling outage.

A Type A test is currently scheduled for the Fall 1994 refueling outage.

Should there be any questions concerning this request, please contact us.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFPNRGNOIH Attachments cc:

S.

D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector,

USNRC, Turkey Point Plant W. A. Passetti, Florida Department of Health and Rehabilitative Services

r I'

STATE OF FLORIDA COUNTY OF DADE

)

)

) ss.

T. F. Plunkett being first duly sworn, deposes and says:

That he is Vice President Turke Point Nuclear, of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

T. F. Plunkett Subscribed and sworn to before me this

~day of

~873282/8, 1993.

Name of tary Public (T

e or rint)

NOTARY PUBLIC, in and fo the County of

Dade, State of Florida My Commission expire Commission No.

gHERYLA. KELLY teCCuNSSNN>~~

'M:

Soptemb0r 27.

F. Plunkett is personally known to me.

~I ff

,", r

Ã

ATTACHMENT 1 SAFETY ANALYSlS

SAFETY ANALYSIS Description of Proposed License Amendment Florida Power and Light Company (FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to revise Surveillance Requirement 4.6.1.2a, to conform with NUREG

1431, Standard Technical Specifications, Westinghouse
Plants, Revision 0, dated September, 1992.

NUREG 1431, as approved by the NRC, provides the basis for this submittal.

This Technical Specification change request involves an administrative change to the surveillance requirement for the performance of Type A Tests which determine the Overall Integrated Containment Leakage Rate.

The current surveillance frequency found in Turkey Point Technical Specifications is based on the schedule set forth in 10 CFR 50 Appendix J.

Specifically, Turkey Point Technical Specification 4.6.1.2a requires that "Three Type A tests (Overall Integrated Containment Leakage Rate) shall be conducted at 40

+

10 month intervals during shutdown at a pressure not less than Pa, 49.9 psig, during each 10-year service period.

The third test of each set shall be conducted during the shutdown for the 10-year plant inservice inspection."

This test frequency does not provide =for longer fuel cycle lengths and longer refueling outages in which major plant modifications are implemented.

The wording of the surveillance frequency found in the Standard Technical Specifications for Westinghouse Plants (NUREG 1431) provides flexibilityin the test frequency.

The Standard Technical Specifications allow for changes in test frequencies by means of an NRC approved exemption request to 10 CFR 50 Appendix J.

This Technical Specification amendment will prevent unnecessary Technical Specification change requests from being processed when the fuel cycle does not match the 40

+ 10 month frequency as presently required in the Turkey Point Technical Specifications.

Proposed Technical Specification Change FPL proposes to change the following Technical Specifications in support of the proposed amendment:

Surveillance Re uirement 4.6.1.2a Revise the surveillance requirement to read, "Type A test shall be performed in accordance with 10 CFR 50 Appendix J, as modified by approved exemptions."

Justification:

The proposed change is administrative in nature in that the proposed change will adopt the guidance Page 1 of 2

provided in NUREG 1431, Standard Technical Specifications, Westinghouse

Plants, dated September 1992, for the performance of Type A tests in accordance with 10 CFR 50 Appendix J, as modified by approved exemptions.

Any exemptions to the requirements of 10 CFR 50 Appendix J require prior NRC approval.

This guidance and wording was approved and issued by the NRC Office of Nuclear Reactor Regulation.

NUREG 1431 was developed based on the criteria in the interim Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactorsg dated February 6,

1987.

The proposed Technical Specification change does not involve any change to the configuration or method of operation of any plant equipment that is used to mitigate the consequences of an accident, nor do they affect any assumptions or conditions in any of the accident analysis.

Bases Section 3 4.6 Revise the Bases section to include approved exemptions to Appendix J by adding the words "as modified by approved exemptions."

Justification:

The Bases section provides information on how the surveillance interval was developed.

The addition of "as modified by approved exemptions" to 10 CFR 50 Appendix J is administrative in nature and provides consistency with the Surveillance Requirement 4.6.1.2a.

Page 2 of 2

ATTACHMENT 2 Determination of No significant Hazards Considerations

DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION Description of Proposed License Amendment Florida Power and Light Company (FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 be amended to revise Surveillance Requirement 4.6.1.2a, to conform with NUREG

1431, Standard Technical Specifications, Westinghouse
Plants, Revision 0, dated September, 1992.

NUREG 1431, as approved by the NRC, provides the basis for this submittal.

This Technical Specification change request involves an administrative change to the surveillance requirement for the performance of Type A Tests which determine the Overall Integrated Containment Leakage Rate.

The current surveillance frequency found in Turkey Point Technical Specifications is based on the schedule set forth in 10 CFR 50 Appendix J.

Specifically, Turkey Point Technical Specification 4.6.1.2a requires that "Three Type A tests (Overall Integrated Containment Leakage Rate) shall be conducted at 40

+

10 month intervals during shutdown at a pressure not less than Pa, 49.9 psig, during each 10-year service period.

The third test of each set shall be conducted during the shutdown for the 10-year plant inservice inspection."

This test frequency does not provide for longer fuel cycle lengths and longer refueling outages in which major plant modifications are implemented.

The wording of the surveillance frequency found in the Standard Technical Specifications for Westinghouse Plants (NUREG 1431) provides flexibilityin the test frequency.

The Standard Technical Specifications allow for changes in test frequencies by means of an NRC approved exemption request to 10 CFR 50 Appendix J.

This Technical Specification amendment will prevent unnecessary Technical Specification change requests from being processed when the fuel cycle does not match the 40

+ 10 month frequency as presently required in the Turkey Point Technical Specifications.

Introduction The Nuclear Regulatory Commission has approved standards for determining whether a significant hazards consideration exists (10 CFR 50.92 (c)).

A proposed amendment to an operating license for a facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create a

possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a reduction in a margin of safety.

Page 1 of 3

Discussion (1)

Operation of the facility in accordance with the proposed amendments would not involve a significant increase in the probability or consequences of an accident previously evaluated.

The proposed license change is administrative in nature in that the proposed change will adopt the guidance and wording provided in NUREG 1431, Standard Technical Specifications, Westinghouse

Plants, dated Septemberg 1992I for the performance of Type A tests in accordance with 10 CFR 50 Appendix J.

This guidance was approved and issued by the NRC Office of Nuclear Reactor Regulation.

NUREG 1431 was developed based on the criteria in the interim Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated February 6,

1987.

Specifically, the proposed change removes the schedular requirements of 40

+ 10 months for the performance interval for Type A test from the surveillance requirement and would require the test interval to be in accordance with 10 CFR 50 Appendix J and any approved exemptions.

The proposed Technical Specification change does not involve any change to the configuration or method of operation of any plant equipment that is used to mitigate the consequences of an

accident, nor do they affect any assumptions or conditions in any of the accident analysis.

Therefore, the probability or consequences of an accident previously evaluated are not affected.

(2)

Operation of the facility in accordance with the proposed amendments would not create the possibility of a new or different kind of accident from any accident previously evaluated.

The proposed license change is administrative in nature in that the proposed change will adopt the guidance and wording provided in NUREG 1431, Standard Technical Specifications, Westinghouse

Plants, dated September, 1992, for the performance of Type A tests in accordance with 10 CFR 50 Appendix J.

This guidance and wording was approved and issued by the NRC Office of Nuclear Reactor Regulation.

NUREG 1431 was developed based on the criteria in the interim Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated February 6,

1987.

Specifically, the proposed change removes the schedular requirements of 40

+ 10 months for the performance interval for Type A test from the surveillance requirement and would require the test interval to be in accordance with 10 CFR 50 Appendix J and any approved exemptions.

The proposed Technical Specification change Page 2 of 3

does not involve any change to the configuration or method of operation of any plant equipment that is used to mitigate the consequences of an accident.

Therefore, the possibility of a new or different kind of an accident previously evaluated would not be created.

(3)

Operation of the facility in accordance with the proposed amendments would not involve a significant reduction in a margin of safety.

The proposed license change is administrative in nature in that the proposed change will adopt the guidance and wording provided in NUREG 1431, Standard Technical Specifications, Westinghouse

Plants, dated Septemberg 1992I for the performance of Type A tests in accordance with 10 CFR 50 Appendix J.

This guidance and wording was approved and issued by the NRC Office of Nuclear Reactor Regulation.

NUREG 1431 was developed based on the criteria in the interim Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated February 6,

1987.

Specifically, the proposed change removes the schedular requirements of 40

+ 10 months for the performance interval for Type A test from the surveillance requirement and would require the test interval to be in accordance with 10 CFR 50 Appendix J and any approved exemptions.

Therefore, a significant reduction in a margin of safety would not be involved.

Summary Based on the above discussion, FPL has determined that the proposed amendment request does not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create a possibility of a new or different kind of accident from any previously evaluated; or (3) involve a reduction in a margin of safety; and therefore, the proposed change does not involve a significant hazards consideration as defined in 10 CFR 50.92.