L-93-232, Responds to 930728 RAI Response to GL 92-01 Rev 1, Reactor Vessel Structural Integrity Per 10CFR50.54(f)

From kanterella
(Redirected from L-93-232)
Jump to navigation Jump to search
Responds to 930728 RAI Response to GL 92-01 Rev 1, Reactor Vessel Structural Integrity Per 10CFR50.54(f)
ML17228A292
Person / Time
Site: Saint Lucie  
Issue date: 09/10/1993
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-01, GL-92-1, L-93-232, NUDOCS 9309160016
Download: ML17228A292 (4)


Text

ACCELERATEKDOCUIVIENTDIS'I'RIME'I'IONSYSTEM REGULAT~ 'INFORMATION DISTRIBUTION~STEM (RIDS)

ACCESSION NBR:9)09160016 DOC.DATE: 93/09/10 NOTARIZED:

NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power a Light Co.

AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to 930728 RAI response to GL 92-01 Rev 1, "Reactor Vessel Structural Integrity per 10CFR50.54(f)."

DISTRIBUTION CODE:

ZOOID COPIES RECEIVED:LTR g ENCL +

SIZE:

TITLE: OR Submittal: General Distribution DOCKET 05000335 05000389 p

NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J

'NTERNAL:

ACRS NRR/DORS/OTSB NRR/DRPW NRR/DSSA/SRXB OC/LFDCB ETAGE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS3 NSIC COPIES LTTR ENCL 1

D p

NOTE TO ALL"RIDS" RECIPIEN'I'S:

PLEASE PIELP US TO REDUCE WASTE! CONTACT TlIE DOCUMEN'I'ON'I'ROI. DESK, ROOM Pl-37 (EXT. 504-20(iS) TO ELIMINATEYOUR NA."lE FROM DIS'I'lklIIU'IION LISTS FOR DOCUMEN'I'S YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL p

/

F'l I

'I 1

t,

,I

~

~

P.O. Bex 128, Ft. Pierce, FL 34954-0128 September 10, 1993 L-93-232 10 CFR 50.4 U.

S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.

C.

20555 RE:

St. Lucie Units 1 and 2

Docket No. 50-335 and 50-389 Generic Letter 92-01, Revision 1

Re uest for Additional Information Schedule On July 28,

1993, the NRC issued a

request for additional Information (RAI) on the Florida Power and Light Company (FPL) response to Generic Letter 92-01, Revision 1,

"Reactor Vessel Structural Integrity, 10 CFR 50.54(f)."

The RAI requested a

response or a'schedule within 60 days of the letter date.

FPL has reviewed the RAI and determined that a full response will not be available within the time requested.

The data requested will require a review of fabrication records by the original equipment manufacturer (Combustion Engineering) as background for part of the response.

The response to the RAI is scheduled to be submitted by November 17(

1993.

Please contact us if there are any questions about this submittal.

Very truly yours, D. A.

Vice St.

L ger esident ie Plant DAS/GRM/kw cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant DAS/PSL 8984-93

'rr309160016

'730910 PDR ADDCK 05000335,

) ~00/36'

...,,.P.DR, an FPL Group company

,o%

P