L-93-139, Documents FPL Decision to Invoke Code Case N-416, Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping. Forwards Figures 1-6

From kanterella
(Redirected from L-93-139)
Jump to navigation Jump to search
Documents FPL Decision to Invoke Code Case N-416, Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping. Forwards Figures 1-6
ML17349A884
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/17/1993
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-93-139, NUDOCS 9306030113
Download: ML17349A884 (12)


Text

ACCKI.ERATO DOCUMENT DISTRIBVTIONSYSTEM REGULAT~ INFORMATION DISTRIBUTIONSYSTEM (RIDE)

ACE.'ESSION NBR:9306030113 DOC.DATE: 93/05/17 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C

50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Documents FPL decision to invoke Code Case N-416, "Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping." Forwards figures 1-6.

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code NOTES:

DOCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA RAGHAVAN,L COPIES LTTR ENCL 1

0 2

2 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 1

1 INTERNAL: NRR/DE/EMEB OC/J EHB EXTERNAL: EG&G BROWNFB NRC PDR 01 1

1 1

0 1

1 1

1 1

1 NUDOCS-ABSTRACT OGC/HDS3 RES/DSIR/EIB EG&G RANSOME F C NSIC 1

1 1

0 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 11

P.O. Box 029100, Miami, FL, 33102-9100 ltd 17 1%3 L-93-139 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Inservice Ins ection Pro ram This letter documents Florida Power and Light Co.'s (FPL) decision to invoke Code Case N-416, "Alternative Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping," as discussed in Regulatory Guide (RG) 1.147 foz the Class 2 component steam generators up to the first isolation valve.

Attached Figures 1 through 6 define the steam generators'oundary for applicability of Code Case N-416 for Turkey Point Units 3 and 4.

There will be no deviations from the requirements of. Code Case N-416.

By FPL letter L-93-60, dated March 10,

1993, FPL informed the NRC that the Turkey Point Units 3 and 4 Insezvice Inspection Program invokes Code Case N-498, "Alternative Rules for 10 Year Hydrostatic Pressure Testing for Class 1 and 2 Systems,Section XI, Division 1," as discussed in RG 1.147.

Code Case N-498 requires a hydrostatic pressure test after replacement and repairs for Class 1 and 2 systems.

Ultrasonic inspections were conducted on the Turkey Point Unit 4 steam generators'eedwater nozzle to reducer weld joints.

The inspections identified cracks originating in the weld root and propagating into the reducer base material for all three steam generators.

FPL is currently replacing the Turkey Point Unit 4 feedwater reducers on all three steam generators.

Code Case N-416 allows deferral of the required hydrostatic pressure test for repairs or replacements to the next regularly scheduled ten-year hydrostatic test The ten-year hydrostatic pressure test for the Turkey Point Unit 3 steam generators was completed on September 24, 1992.

The ten-year hydrostatic pressure test for the Turkey Point Unit 4'steam generators was completed on April 18, 1993.

The next scheduled ten-year hydrostatic pressure test will be performed at the end of the third inspection interval for each unit.

The end of the third inspection interval for Turkey Point Unit 3 is February 21, 2004.

The end of the third inspection interval for Turkey Point Unit 4 is April 15, 2004.

9'3060305 13 930517 PDR

  • DOCK 05000250

'8 PDR on FpL Group company

1 jl N

I he

L-93-139 Page 2 of 2 In accordance with Code Case N-416, both a post-repair visual leak test at operating pressure will be performed, and a full volumetric examination, consisting of one hundred percent radiographic testing and ultrasonic testing, will be performed for the reducer replacement.

Should there be any questions concerning the above information, please contact us.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/OIH/oh attachment cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC R.

C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant

FIGURE 1

PRESSURE TEST PARAMETERS PSIG F

DES1GM 1085 600 OPERATNG 745 555 HYDROSTATIC 1356

<<>60 cv n

0 0

g I

I 0

O 0

O I

I 3-10-124 RV-3-1403 RV-3-1401 OlI I

MOV-3-1400 3-10-121 POV-3-2604 P

26 A 3-10-107 SGWL-3-022 RV-3-1400 3-10-101 3-10-148 3-10-100 3-10 147 3-10-139 RV-3 1402 3-10-143 3 10-150 3-10-156 3-10-152 3-10-154 IO I

Ill IA ~

~ IA IOi-O I

In1>>

n IY) 7A 3-20-723 SGB-3-002 SGB-3-001 3-20-134 3-20-679 3-20-139 3-20-133 SGWL-3-007 3-20-132 TURKEY POINT UNIT 3 PRESSURE TEST PROGRAM TITLE:

HYDROSTATIC TEST OF 3 "A STEAM GENERATOR DATE: 09/16/91 TEST g:

03-SG-7104-H REVISION 1

DRAWN BY:

ISI GROUP DRAWING NUMBER:

7104

FIGURE 2 MOV 3 1401 PRESSVRE TEST PARAMETERS PSIG F

0ESICM 1085 600 745 555 OPERATlNC HYOROSTATIC 1356

<<>60 P 248 6

I I

I n

v>

3-1 0-207 SCWL-3-028 RV-3-1408 RV-3-1406 RV-3-1405 Oi CV IO IVl 3-10-221 POV-3-2605 3-10-201 248 RV-3-1407 3-10-200 247 3-10-243 3-10-256 3-10-250 3-10-252 3-10-701 3-10 254 3-20-728 SCB-3-004 IO I

3-20-234 3-20-683 3-20-239 SCWL-3 025 3-20-232 3-20-233 TURKEY POINT UNIT 3 PRESSURE TEST PROGRAM TITLE:

HYDROSTATIC TEST OF 3 'B STEAM GENERATOR DATE: 07/23/92 TEST IT:

03-SG-7105-H REVISION 1

DRAWN BY:

ISI GROUP DRAWING NUMBERI 7105

FlGURE 3 MOV-3-1402 PRESSURE TEST PARAMETERS DESIGN 1085 600 OPERATING 745 555 H'IOROSTATI0 1356

~>60 P

24C I0 I

0 0

I 3-10-307 SGWL-3-046 I0 Ivl RV-3-1413 RV-3-1411 RV-3-1410 0

I0 IV) 3-10-321 POV-3-2606 3-10-301 348 RV-3-1412 3-10-300 347 3-10-343 3-10-350 3-10-356 3-10-352 3

10 354 I el'ln 0

I I

v7 TC P-2 3-20-733 SGB-3-006 GB-3-005 3-20-334 3-20-687 3-20-339 SGWL-3-042 3-20-332 TURKEY POINT UNIT 3 PRESSURE TEST PROGRAM TITLE:

HYDROSTATIC TEST OF 3 "C" STEAM GENERATOR DATE: 09/16/91 TEST III:

03-SG-7106-H REVISION 1

DRAWN BY:

ISI GROUP DRAWING NUMBER:

7106

FIGURE 4 MOV-4-1400 PRESSORE TEST PARAMETERS PSIG F

DESIGN 1085 600 OPERATING 745 555 HYDROSTATIC 1356 m>60 CVO IO I

Vl0 I

I O

I O

I I

OO I

I't RV-4-1403 RV-4-1401 Ok IO I

10-4-121 POV-4-2604 P 26A 4-10-101 4-10-148 SGWL-4-022 4-10-107 RV-4-1400 RV-4-1402 4-10-100 4-10-147 4-10-143 4 10-150 4-10-156 4-10-152 4-10 154 7A P-2 4-20-723 SG8-4-002 IO I

IA cA y) lA O r I

I O

~o-I 4-20-134 4- 0-679 4-20-139 4-20-132 4-20-133 SGWL-4-007 TURKEY POINT UNIT 4 PRESSURE TEST PROGRAM TITLE:

HYDROSTATIC TEST OF 4 "A" STEAM GENERATOR DATE: 09/16/91 TEST g:

04-SG-7110-H REVISION 1

DRAWN BY:

ISI GROUP DRAWING NUMBER:

7110

FIGURE 5 MOV-4-1401 PRESSURE TEST PARAMETERS PSIG F

DESIGN 1085 600 OPERATING 745 555 HYDROSTATIC 1356

<<>60 N

W

~

IA 0N 0N I

I I

I 0

0 I

I I

I Io I

RV-4 1408 RV 4-1406 0

N I0 I

4-10-221 P

2ISB 4-10-201 248 4-10-207 SGWL-4-028 RV-4-1405 POV-4-2605 RV-4-1407 4-10-200 247 4-10-243 4 10-256 4-10-250 4-10-252 4-10-254 I NICI 0

I N 0

I I

o V

I I

4-20-728 SG8-4-004 GB-4-003 4-20-234 4-20-239 SGWL-4-025 4-20-232 4-20-233 TURKEY POINT UNIT 4 PRESSURE TEST PROGRAM TITLE:

HYDROSTATIC TEST OF 4 "B" STEAM GENERATOR DATE: 09/16/91 TEST 8:

04-SG-7111-H REVISION DRAWN BY:

DRAWING NUMBER:

1 ISI GROUP 7111

4

~

~

FlGURE 6

MOV-4-1402 PRESSURE TEST PARAMETERS PSIG DESIGN 1085 600 C4o I

I I

o o

I I

'll II' o

RV-4-1413 RV-4-1411 4-10-321 OPERATING 745 555 HYDROSTATIC 1356

>60 P-24C 4-10-301 348 4-10-307 SGYh.-4-046 RV-4-1410 POV-4-2606 RV-4-1412 4-10-300 347 4-10-343 4-10-350 4-10-356 4-10-352 4-10-354 n

Io I

v) o I

I o

I P-7C 4-20-733 SGB-4-006 GB-4-005 4-20-687 4-20-339 4-20-333 SGWL-4-042 4-20-332 TURKEY POINT UNIT 4 PRESSURE TEST PROGRAM TITLE:

HYDROSTATIC TEST OF 4 "C" STEAM GENERATOR DATE: 09/16/91 TEST g:

04-SG-7112-H REVlSION DRAWN BY:

DRAWING NUMBER:

1 ISI GROUP 7112

P