L-93-058, Forwards Response to NRC 931110 RAI Re Decommissioning Funding Plan Submitted on 930528
| ML20058L990 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 12/10/1993 |
| From: | Conant J ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC. |
| To: | Soong S NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| ML-93-058, ML-93-58, TAC-L21637, NUDOCS 9312200097 | |
| Download: ML20058L990 (8) | |
Text
-.
ABB i
ASEA BROWN BOVERf
)
December 10,1993 l
ML-93-058 1
Docket No. 70-36 License No. SNM-33
'lq v
Dr. Sean Soong, Project Manager Licensing Section 2, Licensing Branch
{
Division of Fuel Cycle Safety and Safeguards -
j U.S. Nuclear Regulatory Commission Attention: Document Control Desk y
Washington, D.C. 20555 ~
[
Subject:
Response to Questions on Decommissioning Funding Plan (TAC No. L21637).
j
Reference:
Letter, S. Soong (NRC) to J. A. Rode (C-E) dated November 10,1993
.l
Dear Dr. Soong:
The referenced letter requests additiocal information concerning our Hematite
[
Decommissioning Funding Plan submitted on May 28,1993.. The enclosure.with this letter' l
provides the requested information. Six (6) copies are provided herewitti for your use.
l If there are any questions or comments regarding this material, please feel free ~ to contact me or Mr. Reid Wolf of my staff at 203-285-9679.-
j Very truly yours,.
. C' OMBUSTION ENGINEERING,2INC.
]
l.
H l
.}
, = =..
John F. Conant
?!
Manager
.l Nuclear Materials Licensing i
f JFC:ct 1
Enclosure:
As Stated j
cc:
Mr. J. Noggle (NRC-Region I) f/7 d'i-i L
15SC')f6BB Combustion Engineering Nuclear Power.
Combuston EnDineenng, Inc.
1000 Prospect Hill Road Telephone (203) 688-1911 Post Offee Box 500 Fax (203) 285 9512 9312200097 931210 hy, was r. connectcA 060954500 Mx 99297 COMBEN WSOR '
l PDR ADOCK 07000036-Q,.
-PDR iL
. a.: -
1 i
. I t
i a
4 j
Enclosure to -
l ML-93-058 i
i l
4 1
a i
i h
.I 3
i i
1
,o
)
1 i
l 1
I i
ENCLOSURE 4
i RESPONSE TO COMMENTS 1
4 e
i l
1 i
1 i
i f
i i
I J
\\
1 DECEMBER,1993 -
i
.i 4
.w
, - + - - - _ -.
-,,,s
. -. ~-
w.e 1
.,v--
-r----+--w.v.v
J RESPONSE TO NRC QUESTIONS ON THE DECOMMISSIONING FUNDING PLAN frac NO.- L21637)
(1)
Submit additional detail to support the cost estimate (Regulatory Guide'3.66,
}
Appet:dit F).
1
Response
1 The cost estimating tables included in support of the decommissioning cost estimates were the summary of approximately 36 other tables (currently available for' review at
-l our Windsor offices) that were utilized to collate the data physically gathered at the nuclear fuel manufacturing facilities. This ~ gathering process consisted of taking measurements of the walls, floors, ceilings, and equipment. comprising the physical plant of the manufacturing facility, calculating' the volumes and/or surface areas off i
these features, and entering the resultant data into spreadsheets for subsequent j
analyses. These analyses were used to predict the volumes of radioactive waste that.
~
can be reasonably expected from decommissioning operations.
r i
s The radioactive waste stream predicted by the' above referenced analyses was then _
analyzed as follows: It was assumed that some of the radioactive waste generated i
during decommissioning would be volume reduced by cutting, or otherwise breaking
{
it into smaller pieces prior to shipping it to an approved waste' processor. This process was assumed to reduce the radioactive waste volume by a factor of thirty.-
percent (30%). It was further assumed that the processor would effect significant i
additional volume reduction prior to sending the remaining radioactive waste for -
burial at an approved disposal site. The reduction in volume achievable through this i
process was assumed to be approximately seventy percent (70%). The capability to j,
realize the reductiori factors used in this scenario has been previously demonstrated, both at the manufacturing facility and the waste' processing facility..*Ihe costs shown on the estimating tables were projected from the results of these analyses.
(2)
Submit evidence that the panies signing the surety bond,' rider, and standby trust agreementfor the licensee are authorized to represent the company (Regulatory Guide,'pages 3-14 and 3-17).
~
}
Response provides an original, signed certification that the persons signing the.
)
surety bond, rider, and standby trust agreement were authorized to represent L Combustion Engineering.
i l
~;
r (3)
Revise Schedule A of the standby trust agreement to include the cenification amount.
5 (Regulatory Guide,"page 4-26).
Response
Since the cost of decommissioning is stated in the Decommissioning Funding Plan, it
.l is suggested that the standby trust agreement not be revised at this time. At the' time of activation of this standby trust agreement, Combustion Eng' eering will give a m
current cost estimate for decommissioning to the trustee under this agreement.
I l
f I
i i
I l
i 1
I d
I i
i ATTACHMENT 1 Certification of Person: Signing 1
i i
i i
I l
i 1
l i
1 e
COMBUSTION ENGINEERING, INC.
i CERTIFICATE i
I, Robert S.
Bell, Jr.,
Assistant Secretary of Combustion Engineering, _Inc.
(the " Company") do hereby certify as follows:
1.
A certain Standby Trust Agreement with respect to the l
Decommissioning of Nuclear Regulatory Commission License No.
t SNM-33 and associated Payment Surety Bond dated May 24, l
1990, were signed on behalf of the company by Richard:M.
l Burt, pursuant to authority delegated by a resolution of the Board of Directors of the Company on March 29, 1990 (Attachment A).
i 2.
A certain rider dated May 3, 1993, to the aforesaid f
Payment Surety Bond for the Decommissioning of NRC License f
No. SNM-33 was signed on behalf of the Company by Richard S.
Siudek, pursuant to authority delegated by a Memorandum of Designation - Nuclear Power Business dated August 3, 1989-(excerpted as Attachment B) which was-issued pursuant to a i
resolution of the Board of Directors on November 16, 1988.
IN WITNESS WHEREOF, I have hereunto set my hand,
}
this tenth day of December, 1993 and affixed the corporate seal f
of the Company.
/
/
t t
i i
i I
~
~
ATT21CU1*1f5 CerH L Je
,7;,o; 93 2
e i
i j
j 7
COMBUSTION ENGINEERING, INC.
l
)
Consem of Directors e
)
i We, the undersigned, being all the " Directors of Combustion l Engineering, Inc., a i
Delaware corporation (the " Company"), do hereby, pursu~ ant tQ Sectio ~n'141(f) of!the. General Corporation Law of Delaware, consent.to,'the followin.g action:
~
} 'O 1
<v
. s..
- u..
RESOLVED, that; the $csolutio'ns adopted.:by ' th'. Board
- of-Directors on c
-aanuary 24, 1990, in connection with'generalysigni,ng au'thoriiy.be, and hereby are,
~. a rescinded...-
}
=
RESOLVED, that signing author ~ity on, behalf of.the Company with respect to contracts, agreements, tanking arranggments, dee~ds, bonds, certificater," guarantees, indemnitics, undertakings ~'nd instrumentrahd documents of'un~y nature, whether or nbt in the ordinary course. of busihess and# whether with.. private parties or s
governmental agencies or instrumentalitics thereof, be, and;tho.:same hereby is, vested e
in.cach cnc of Gerhard.J;hulmc.yerTKlaus-E. Agthe, Bent,t S. Sohlen, Timothy H i
Powcts, William 'J.'Connolly.atrd-Richard M.< Burt, and may be.dclegated in writing by. any'-one of these individuals to any one 'or ',morc'.officefs or embloyces of the
- Compa n y.
..- o.
f.$
,'n &*.
/$
A i
Kla us E. A.j.tre i
V s
ry
~
~~
ffCngI 9,/Sonien
. ~..
i Dated: March 29,1990 O
'i
)f f/NifMctnJT U 12llo)93 Ce&uk O
1 MEMORANDUM 0F DESIGNATION...
~
LIMITED CONTRACT SIGNING AUTHORITY.
- l NUCLEAR POWER BUSINESSES Pursuant to the authority granted by a' resolution of the. Board of..
f Directors of Combustion Engineering, Inc. (the " Company").on November l
16, 1988, we hereby authorize the employees'.of the Company holding.the-following positions to execute on behalf of the Company _ any contract, i
agreement, proposal, bid or other instrument _ relating-to the sale of ~
materials, services or equipment in the ordinary course of businessLof l
the Nuclear Power Businesses of the. Company,Lastmay be authorized:
l l
pursuant to the policies of the Company and on such terms:and conditions' j
as may be established or approved by the-Legal Department of the; Company, and not involving an amount in. excess of that set forth after-1 the respective position:
i
\\
l (1)
. President. Nuclear Power Busiriesses I
f 540,000,000 O
(2)
. v4ce ares 4 dent. "eclear Svstems
. Vice President. Nuclear Services
. Vice President. Nuclear Fuel
-l 1
. Controller. Nuclear Power Businesses l
l
$5,000,000'
.k
& ~.
^
i l
O i
/
. i y
0 /CAWA Charles E. Barnett Georgi S. Kimmel l
I Date:
f/3/C S I
i -