L-92-268, Forwards Rev 3 to Turkey Point Units 3 & 4 Physical Security Plan Suppl,Per 10CFR50.54(p).Plan Reflects Temporary Relocation of Section of Protected Area Barrier to Facilitate Hurricane Recovery Efforts.Plan Rev Withheld

From kanterella
(Redirected from L-92-268)
Jump to navigation Jump to search
Forwards Rev 3 to Turkey Point Units 3 & 4 Physical Security Plan Suppl,Per 10CFR50.54(p).Plan Reflects Temporary Relocation of Section of Protected Area Barrier to Facilitate Hurricane Recovery Efforts.Plan Rev Withheld
ML19341E919
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/21/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-268, NUDOCS 9209290238
Download: ML19341E919 (1)


Text

-

h'!

A P.0 Ben 029100, Miaml FL 331::2-9103

-l SEP. 21199?

,= pat.

L-92-268.

l 10 CFR 50.54 j

t t

U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk l

Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 j

~~

Docket Nos. 50-250 and 50-251 Physical Security Plan Revision 3 Supplement Submittal Under 10 CFR 50.54 (p_L i

As discussed during the September 8, 1992, conference call nith Mr. A.

Tillman, Mr.

D. McGuire and Mr. R.

Skelton, Florida Power

& Light Co. (FPL). is implementing the temporary relocation of n section of the Protected Area barrier to facilitate the hurricane recovery efforts.

Attached is the Turkey Point Units 3 and 4 Physical Security Plan Supplement which details the temporary Protected Area reconfiguration.

Pursuant to 10 CFR 50.54 (p),

l' copies PTNPSP-3 through PTNPSP-6 of the Supplement are enclosed.

By copy of this letter, we are forwarding copies PTNPSP-1 and 2 l

of the Supplement to the Nuclear Regulatory Commission, Region i

II.

l Very truly yours,

}f jl ' [.c4msk bb i

T. F.

Plunkett Vice President i

Turkey Point Nuclear TFP/OIH/oh 1

Enclosure

[

cc:

Stewart D.

Ebneter, Regional Administrator, Region II, USNRC (2 copies)

R C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant (w/o enclosure)

I i

9209290238 920921 PDR ADOCK 05000250..3 f

PDR La W =TL Gr. u;' t &rrpan

-m

, ~ -

P O Box 029100 M.anu.FL 33107 9100 SEP 211 app

,= pa t_

L-92-268 10 CFR 50.54 U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Physical Security Plan Revision 3 Supplement Submitta] Under 10 CFR 50.54 (p)

As discussed during the September 8, 1992, conference call with Mr A.

Tillman, Mr.

D.

McGuire and Mr.

R.

Skelton, Florida Power

& Light Co.

(FPL) is implementing the temporary relocation of a section of the Protected Area barrier to facilitate the hurricane recovery efforts.

Attached is the Turkey Point Units 3 and 4 Physical Security Plan Supplement which details the t empcrary Protected Area reconfiguration.

Pursuant to 10 CFR 50.54 (p),

copies PTNPSP-3 through PTNPSP-6 of the Supplement are enclosed.

By copy of this letter, we are forwarding copies PTNPSP-1 and 2 of the Supplement to the Nuclear Regulatory Commission, Region II.

Very truly ycurs, ff L C4~

T.

F.

Plunkett Vice President Turkey Point Nuclear TFP/OIH/oh Enclosure cc:

Stewart D.

Ebneter, Regional Administrator, Region II, USNRC (2 copies)

R.

C.

Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant (w/o enclosure) 9209290238 920921 l

PDR ADOCK 05000250-F ppg "

fb

. m mm<--s

// 6F

,