L-92-268, Forwards Rev 3 to Turkey Point Units 3 & 4 Physical Security Plan Suppl,Per 10CFR50.54(p).Plan Reflects Temporary Relocation of Section of Protected Area Barrier to Facilitate Hurricane Recovery Efforts.Plan Rev Withheld
| ML19341E919 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/21/1992 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-92-268, NUDOCS 9209290238 | |
| Download: ML19341E919 (1) | |
Text
-
- h'!
A P.0 Ben 029100, Miaml FL 331::2-9103
-l SEP. 21199?
,= pat.
l 10 CFR 50.54 j
t t
U.
S.
Nuclear Regulatory Commission Attn:
Document Control Desk l
Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4 j
~~
Docket Nos. 50-250 and 50-251 Physical Security Plan Revision 3 Supplement Submittal Under 10 CFR 50.54 (p_L i
As discussed during the September 8, 1992, conference call nith Mr. A.
Tillman, Mr.
D. McGuire and Mr. R.
Skelton, Florida Power
& Light Co. (FPL). is implementing the temporary relocation of n section of the Protected Area barrier to facilitate the hurricane recovery efforts.
Attached is the Turkey Point Units 3 and 4 Physical Security Plan Supplement which details the temporary Protected Area reconfiguration.
Pursuant to 10 CFR 50.54 (p),
- l' copies PTNPSP-3 through PTNPSP-6 of the Supplement are enclosed.
By copy of this letter, we are forwarding copies PTNPSP-1 and 2 l
of the Supplement to the Nuclear Regulatory Commission, Region i
II.
l Very truly yours,
}f jl ' [.c4msk bb i
T. F.
Plunkett Vice President i
Turkey Point Nuclear TFP/OIH/oh 1
Enclosure
[
cc:
Stewart D.
Ebneter, Regional Administrator, Region II, USNRC (2 copies)
R C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant (w/o enclosure)
I i
9209290238 920921 PDR ADOCK 05000250..3 f
PDR La W =TL Gr. u;' t &rrpan
-m
, ~ -
P O Box 029100 M.anu.FL 33107 9100 SEP 211 app
,= pa t_
S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Physical Security Plan Revision 3 Supplement Submitta] Under 10 CFR 50.54 (p)
As discussed during the September 8, 1992, conference call with Mr A.
Tillman, Mr.
D.
McGuire and Mr.
R.
Skelton, Florida Power
& Light Co.
(FPL) is implementing the temporary relocation of a section of the Protected Area barrier to facilitate the hurricane recovery efforts.
Attached is the Turkey Point Units 3 and 4 Physical Security Plan Supplement which details the t empcrary Protected Area reconfiguration.
Pursuant to 10 CFR 50.54 (p),
copies PTNPSP-3 through PTNPSP-6 of the Supplement are enclosed.
By copy of this letter, we are forwarding copies PTNPSP-1 and 2 of the Supplement to the Nuclear Regulatory Commission, Region II.
Very truly ycurs, ff L C4~
T.
F.
Plunkett Vice President Turkey Point Nuclear TFP/OIH/oh Enclosure cc:
Stewart D.
Ebneter, Regional Administrator, Region II, USNRC (2 copies)
R.
C.
Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant (w/o enclosure) 9209290238 920921 l
PDR ADOCK 05000250-F ppg "
fb
. m mm<--s
// 6F
,