L-92-183, Forwards Rev 12 to Guard Training & Qualifications Plan.Rev Withheld

From kanterella
Jump to navigation Jump to search
Forwards Rev 12 to Guard Training & Qualifications Plan.Rev Withheld
ML20101G683
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/22/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-183, NUDOCS 9206260237
Download: ML20101G683 (1)


Text

,

l I

P.0 Bri 029100 Mianii. FL, 33102-9100

{

Ul.lf.i$)1 0 2J 100?

I l

12%L

}

F:F3L-L-92-18?

j 10 CFR 50.54 U.

S.

I clear Regulatory Commission Attn:

, o c u.T.e n t Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Guard Trainino arid Oualifications Plan - Revision 12 Florida Power and Light Company (FPL) has issued Revision 12 to the Turkey Point Guard Training and Qualifications Plan and has determined that the revision does not decrease the safeguards effectiveness of the plan.

Pursuant to 10 CFR 50.54 (p), a description of the revision and copies PTNTOP-R12-3 through PTNTQP-R12-6 of the plan are enclosed. :

Summary of the changes and a marked up copy of the revised pages.

I :

Directions for incorporating this revision into I

the plan, and copies of the replacement pages.

By copy of this letter, we are forwarding copies of PTNTOP-R12-1 and 2 to the Nuclear Regulatory Commission, Region II.

Very truly yours, 4}SII nJ: 1?~

N l

T.

F.

Plunkett Vice President Turkey Point Nuclear j

TFP/OIH/oh l

j Enclosures cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC (2 copies)

Senior Resident Inspector, USNRC, Turkey Point Plant (without enclosures)

'h 9206260237 920622 l gj PDR ADOCK 05000250

>p lv F

PDR

/

ar. FPt Group company

_ _ _ _ _ _ _ _ _ _ - - _ _ _ _ - - _ - - - _ _ _