L-91-293, Forwards Rev 11 to Guard Training & Qualification Plan.Rev Withheld
| ML20079K775 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/25/1991 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-91-293, NUDOCS 9111010006 | |
| Download: ML20079K775 (1) | |
Text
4 4
P O Bon 0?9100. Miamt il 33102 9100 s'
e s:PL OCT 2 51991 L-91-293 10 CFR 50.54 1
U. s,t;uclear Regulatory Ccr. mission Attn:
Document Control Desk Washington, D. C.
20555 Gentleren:
Re:
Turkey Point Units 3 and 4 Docket !;o s. 50-250 and 50-251 Guard Trainina and Oualification Plan Ticrida Power and Light Cortpsny (FPL) has revised the control nur.ber assignment for *he Turkey Point Training and Qualification Pli.n.
Copies PT!;TCP-R11-3 *.nriugh PTliTQP-R11-6 of the plan are encleted.
Each document is a cmplett updated copy of the Turkey Pcint Training and Cualificat.or Plan (Revision 11).
Pleare den roy the copies which sre currently in your possession.
Sho :Id t her c be any questions, pleare ca!' us.
Very truly yours, f
I.
W T.
F. slunkett Vice President Turke',' P int Plant !;uclear I
TFF/OI;./ch l
l Encloruzes l
l cc:
Sen'cr Resident Inspector, U S !;RC, Turkey Point Plard (wi'.hout enclosures) i
$t 7,1
),0 q
L u~t t 111010006911M[Q.
4 FDR ADOCF 050C" rU
' N " *Fa"'
F