L-90-135, Monthly Operating Repts for Mar 1990 for Turkey Point Units 3 & 4
| ML17348A179 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/31/1990 |
| From: | Harris K, Lovell T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-90-135, NUDOCS 9004200700 | |
| Download: ML17348A179 (15) | |
Text
A,C CELEBRATED D1 BUTION DEMONS TION SYSTEM REGULATO INFORMATION DISTRIBUTION STEM (RIDS)
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251. Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME
'UTHOR AFFILIATION LOVELL,T.W.
Florida Power S Light Co.
HARRIS,K.N.
Florida Power 6 Light,Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251
SUBJECT:
Monthly
'ng repts for Mar 1990 for Turkey Point Units 3
a 4. /900411 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR
/ ENCL /
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ZD CODE/NAME PD2.-2 LA EDISON,G INTERNAL: AEOD/DOA IRM TECH ADV NRR D
Bll G'ILE EXTERNAL: EGGG STUARTgV.A NRC PDR COPIES LTTR ENCL 3
3 1
1 1
2 2
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DLPQ/LPEB10'UDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 D
R h
NCTE IO ALL "RIDS" RECIPIENTS'LEASE HELP US K) REDUCE HASTE!
CXNZACZ 'IHE DOCUMEÃZ CGHHKL DESK RGCN Pl-37 (EXT. 20079)
KO ELIMINATERKR MME PKK DISTRIBUTIQN LISTS FOR DOCUMENZS KKJ DGNiT HEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL 18
~
P.O. Box14000, Juno Beach, FL 33408-0420 APR
)
3 890 L-90-135 10 CFR 50.36 U. 'S. Nuclear Regulatory Commission Attn:
Document.'Control Desk Washington, D.
C'.
20555 Gentlemen:
RE:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4
Technical Specification 6.9.1.c, and the guidance of NUREG 0020, attached
- are, the March 1990 Operating Status and Summary of Operating Experience Reports for Turkey, Point Units 3 and 4.
Very truly yours',
K.
N Harris Vice President
'Turkey Point Plant Nuclear KNH/DRP/TWL/rat attachments cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 5004200700 90033'DR
- DOC+ 05000250)
'i n
PNU an FPL Group company
AVERAGE DAILY UNIT POWER LEVEL DOCRET NO,50 250 UNIT Turke oint 3
DATE,A ril 15 1990 COMPLETED BY T.
W. Lovell TELEPHONE 305 24 6 7 103 MONTH March 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3/ 1/90 3/
2/90'/
3/90 3/ 4/98 3/ 5/90 3/ 6/98 3/ 7/90 3/ 8/90 3/ '9/90 3/18/98 3/li/90 3/12/90 3/13/90 3/10/90 3/15/90
'3/16/90 3/17/90 3/18/98 3/19/90 3/20/90 3/21/90 3/22/90 3/23/90 3/24/90 3/25/90 3/26/98 3/27/90 3/28/98 3/29/90 3/30/90 3/31/90
OPERATING STATUS OPERATING DATA REPORT DOOZT NO 50 - 250 DATE 4/ 6/90 COMPLETED BY To Hi LOVELL TELEPHONE 385/246/7103 lo UNIT'NAME) TURKEY POINT UNIT 3 2o REPORTIHG PERIODt'ARCH'1990 3A LICENSEl) THERMAL POMER (MHT) e 2200 4i NAMEPLATE RATING (GROSS NIE) t 760 5.
DESIGN ELECTRICAL RATING (HET NF)A'93 6 ~ "MAXIMUMOEPEHDABLE 'CAPACITY (GROSS t%i'E) ~
699 7i MAXIMUMDEPENDABLE CAPACITY (NET IIE)t 666 Bi IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS NUMBER 3 THFTQKH 7)
SINCE LAST REPORTR GIVE REASONS(
9i P(IER LEVEL TO.I(ICH RESTRICTEDR IF AHY (HET %.")
19i REASONS FOR RESTRICTIONSR IF ANY'ONTHLY
-YTD-CUMULATIVE llew HOURS IH REPORT PERIODS 12A NUMBER OF HOURS REACTOR HAS CRITICAL 13A REACTOR RESERVE SHUTDNH HOURS 14'OURS CURATOR OH-LINE 15'NIT RESERVE SHUTDOI( HOURS 16A GROSS THERMAL ENERGY GENERATED (HAH) 17'ROSS ELECTRICAL ENERGY GENERATED (MNH) 18'ET ELECTRICAL ENERGY GENERATED (lSH)
- 19. UNIT SERVICE FACTOR 20i UNIT AVAILABILITYFACTOR 21'APACITY FACTOR (USING IK HET) 22 CAPACITY FACTOR (RETRO'OER RET) 23A UNIT 'FORCED 'OUTAGE RATE 24A SHUTDOIlS-SCHEDULED OVER NEXT 6 MONTHS 1
744 0A0 e,e 0A8 e,e 9
0
-1276 0.0 0.0 0A0 OA0 0,0 2160 814A9 8A0 814(3 0.0 1791182 575155 544804 37A7 3717 37A9 36A4 0A0
}51833A6 100005A0 844' 98669' 121'A8 284825985 65636831 62061653 65.0 65il 62A7 59A0
'12AB 25'F SHUT DOMH AT EHD OF REPORT PERIOOF ESTIMATED DATE OF STARTUPl 04/26/98
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March 1990 DOCKET NO.
Turkey Point 83 DATE A ril 15, 1990 COMPLETED By T.
W. Lovel 1 TELEPHONE (305) 246-7103 No.
Date Type Duration (Hours)
Reason2 Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 Component Code~
Cause 8 Corrective Actionto Prevent Recurrence 15 900203 744 N/A RC Fuel XX Unit 3 was shutdown for a scheduled refueling and maintenance outage.
F Forced S Scheduled 2
Reason A - Equipment Failure(Explain)
B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &LIcense Examination F - Administrative G - Operational Error (Explain)
H - Other(Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)
ExhibitG-instructions forPreparation ofData EntryScheets Licensee Event Report(LER) Fde (NUREG4161)
Exhibit1-Same Source
I'I
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO ~ 50-250 UNIT Turke Point 3
DATE A ril 15 1990 COMPLETED BY T.
W. Lovell TELEPHONE 305 246-7103 REPORT MONTH March 1990 Unit 3
was shutdown for a
scheduled refueling and maintenance outage.
AVERAGE DAZLY 'UNZT POWER LEVEL DOCKET NO ~ 50-251, UNZT Turke Point 4
DATE! A ril 15 1990 COMPLETED BY'. W..Lovel'1 TELEPHONE'05 246-7105 MONTH March 1990 DAY AVERAGE DAZLY POWER (MWe-'Net) 3/ 1/90 3/ 2/98 3/ 3/90 3/ 4/90 3/ 5/90 3/ 6/98 3/
7/98'/
8/90 3/ 9/90 3/10/90 3/ii/90 3/12/90 3/13/90 3/14/90, 3/15/90, 3/16/90 3/17/90 3/18/90
.3/19/90 3/20/90 3/21'/90 3/22/90 3/23/90 3/24/98 3/25/90 3/26/90 3/27/90 3/28/90 3/29/90 3/30/98 3/31'/90 703 701 698 698 698 699 695 695 699 780 700 696 694 692 691 637 647 691 690 690 697 698 695 690 688 687 683 688 685 686
4>
0 I
I 4
OPERATING DATA'REPORT OPERATING STATUS DOCKET HO 58 251 DATE 4/ 6/98 CGliP~ BY T>> )l>> LGVELL TPM~HGNE 305/246/7183 1>> UNIT HAMEt TM~Y POIHT UNIT 4 2>>
REPGRTIHG PERIODS MARCH 1998 3>> LICENSED THERMAL PNER (MHT)>>
2209 4>>
HAMEPLATE RATING (GROSS MHE)!
760 5>>
DESIGN ELECTRICAL RATING (HET SK):
693 6>>
MAXI,"UMDEPENDABLE CAPACITY (GROSS MME)t 699 7>>
MAXD>>>>M DEPENDABLE'CAPACITY (HET I(E) ~
566 8>> IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS-h(lMBER 3 THROUGH 7)
SINCE LAST REPORT>>
GIVE REASONS'>>,
POWER'LEVP TO HHICH RESTRICTED< IF AHY (HET MME) 10>>
REASONS fOR RESTRICTIONS'F Alt
'MONTHLY
-YTD-CUMULATIVE 11>>
HOURS IH REPORT PERIOOt 12>>
NUMBER GF HOURS REACTOR NS CRITICAL" 13>>
REACTOR RESERVE SHUTDOI( HOURS 14'>>
HOURS GENERATOR OH-LINE
'.5>> UNIT RESERVE SHUTDOWN HOURS
.6>>
GROSS THERMAL ENERGY GENERATED '(SH)
>>7>>
GROSS ELECTRICAL,ENERGY GEHERATED ()IH)
'.8>>
HET ELECTRICAL ENERGY GENERATED (lSH)
- 9>> UNIT SERVICE FACTOR Ze>>
UNIT AVAILABILITYFACTOR 21>>
CAPACITY FACTOR (USING MOC NET) 22>>
CAPACITY FACTOR'USING DER HET) 23>> UNIT FORCED. OUTAGE RATE 24>>
SHUTDGMNS'CHHNLED OVER'NEXT 6 1)HTHS>>
744 744>>8 0>>0 744>>0 e.e 1634311 537675 513582 lee,e 180>>8 183>>6 99>>6 e.e 2160 1942>>4 e.e 1930>>5 8>>8
- 4220818, 1383630 1317700 89>>4 89>>4 91>>6 ss,e e,e 145565,0 96326>>1 166>>6 92803>>3
- 32. 1-195445162 62377461 58988868 63.8 63>>8 62>>1 58>>5 li>>8-25>> IF SHUT DGWH. AT EI OF REPORT PERIOD<
ESTIMATED DATE OF STARTUPl
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH
- March, 1990 DOCKET NO.
50-251 UNiT NA'ME Turkey Poi nt 84 A ril 15, 1990 COMPLETED By T.
W. Lovel 1 TELEPHONE (305) 246-7103 Date Type'uration (Hours)
Reason~
Method of Shutting Down Reactor Licensee Event Report¹ System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence Unit 4 operated at essentially full power and had no shutdowns or significant power reductions.
F Forced S Scheduled
'2 Reason A - Equipment Failure (Explain)
B - Maintenance orTest C - Refuelng D - Regulatory Restriction E - Operator Training 8 Ucense Examination F - Administrative G - Operational Error(Explain)
H - Other (Explain)
Method 1 - Manual 2-Manual Scram 3 - Automatic Scram 4-Continued 5 - Load Reduction 9 - Other(Explain)
Exhibit G-Instrucbons forPreparation ofData EntryScheets Ucensee Event Report(LER) Rle (NUREG4161)
Exhibit1-Same Source
I!
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO ~ 50-251 UNIT Turke Point 4
DATE A ril 15 1990 COMPLETED BY T.
W. Lovell TELEPHONE 305 246-7103 REPORT MONTH March 1990 Unit 4 operated at essentially full power and had no shutdowns or significant power reductions.
4'th