L-90-135, Monthly Operating Repts for Mar 1990 for Turkey Point Units 3 & 4

From kanterella
(Redirected from L-90-135)
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1990 for Turkey Point Units 3 & 4
ML17348A179
Person / Time
Site: Turkey Point  
Issue date: 03/31/1990
From: Harris K, Lovell T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-135, NUDOCS 9004200700
Download: ML17348A179 (15)


Text

A,C CELEBRATED D1 BUTION DEMONS TION SYSTEM REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251. Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME

'UTHOR AFFILIATION LOVELL,T.W.

Florida Power S Light Co.

HARRIS,K.N.

Florida Power 6 Light,Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251

SUBJECT:

Monthly

'ng repts for Mar 1990 for Turkey Point Units 3

a 4. /900411 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR

/ ENCL /

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ZD CODE/NAME PD2.-2 LA EDISON,G INTERNAL: AEOD/DOA IRM TECH ADV NRR D

Bll G'ILE EXTERNAL: EGGG STUARTgV.A NRC PDR COPIES LTTR ENCL 3

3 1

1 1

2 2

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DLPQ/LPEB10'UDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 D

R h

NCTE IO ALL "RIDS" RECIPIENTS'LEASE HELP US K) REDUCE HASTE!

CXNZACZ 'IHE DOCUMEÃZ CGHHKL DESK RGCN Pl-37 (EXT. 20079)

KO ELIMINATERKR MME PKK DISTRIBUTIQN LISTS FOR DOCUMENZS KKJ DGNiT HEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL 18

~

P.O. Box14000, Juno Beach, FL 33408-0420 APR

)

3 890 L-90-135 10 CFR 50.36 U. 'S. Nuclear Regulatory Commission Attn:

Document.'Control Desk Washington, D.

C'.

20555 Gentlemen:

RE:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4

Technical Specification 6.9.1.c, and the guidance of NUREG 0020, attached

are, the March 1990 Operating Status and Summary of Operating Experience Reports for Turkey, Point Units 3 and 4.

Very truly yours',

K.

N Harris Vice President

'Turkey Point Plant Nuclear KNH/DRP/TWL/rat attachments cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 5004200700 90033'DR

  • DOC+ 05000250)

'i n

PNU an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCRET NO,50 250 UNIT Turke oint 3

DATE,A ril 15 1990 COMPLETED BY T.

W. Lovell TELEPHONE 305 24 6 7 103 MONTH March 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3/ 1/90 3/

2/90'/

3/90 3/ 4/98 3/ 5/90 3/ 6/98 3/ 7/90 3/ 8/90 3/ '9/90 3/18/98 3/li/90 3/12/90 3/13/90 3/10/90 3/15/90

'3/16/90 3/17/90 3/18/98 3/19/90 3/20/90 3/21/90 3/22/90 3/23/90 3/24/90 3/25/90 3/26/98 3/27/90 3/28/98 3/29/90 3/30/90 3/31/90

OPERATING STATUS OPERATING DATA REPORT DOOZT NO 50 - 250 DATE 4/ 6/90 COMPLETED BY To Hi LOVELL TELEPHONE 385/246/7103 lo UNIT'NAME) TURKEY POINT UNIT 3 2o REPORTIHG PERIODt'ARCH'1990 3A LICENSEl) THERMAL POMER (MHT) e 2200 4i NAMEPLATE RATING (GROSS NIE) t 760 5.

DESIGN ELECTRICAL RATING (HET NF)A'93 6 ~ "MAXIMUMOEPEHDABLE 'CAPACITY (GROSS t%i'E) ~

699 7i MAXIMUMDEPENDABLE CAPACITY (NET IIE)t 666 Bi IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS NUMBER 3 THFTQKH 7)

SINCE LAST REPORTR GIVE REASONS(

9i P(IER LEVEL TO.I(ICH RESTRICTEDR IF AHY (HET %.")

19i REASONS FOR RESTRICTIONSR IF ANY'ONTHLY

-YTD-CUMULATIVE llew HOURS IH REPORT PERIODS 12A NUMBER OF HOURS REACTOR HAS CRITICAL 13A REACTOR RESERVE SHUTDNH HOURS 14'OURS CURATOR OH-LINE 15'NIT RESERVE SHUTDOI( HOURS 16A GROSS THERMAL ENERGY GENERATED (HAH) 17'ROSS ELECTRICAL ENERGY GENERATED (MNH) 18'ET ELECTRICAL ENERGY GENERATED (lSH)

19. UNIT SERVICE FACTOR 20i UNIT AVAILABILITYFACTOR 21'APACITY FACTOR (USING IK HET) 22 CAPACITY FACTOR (RETRO'OER RET) 23A UNIT 'FORCED 'OUTAGE RATE 24A SHUTDOIlS-SCHEDULED OVER NEXT 6 MONTHS 1

744 0A0 e,e 0A8 e,e 9

0

-1276 0.0 0.0 0A0 OA0 0,0 2160 814A9 8A0 814(3 0.0 1791182 575155 544804 37A7 3717 37A9 36A4 0A0

}51833A6 100005A0 844' 98669' 121'A8 284825985 65636831 62061653 65.0 65il 62A7 59A0

'12AB 25'F SHUT DOMH AT EHD OF REPORT PERIOOF ESTIMATED DATE OF STARTUPl 04/26/98

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH March 1990 DOCKET NO.

Turkey Point 83 DATE A ril 15, 1990 COMPLETED By T.

W. Lovel 1 TELEPHONE (305) 246-7103 No.

Date Type Duration (Hours)

Reason2 Method of Shutting Down Reactor Ucensee Event Report¹ System Code4 Component Code~

Cause 8 Corrective Actionto Prevent Recurrence 15 900203 744 N/A RC Fuel XX Unit 3 was shutdown for a scheduled refueling and maintenance outage.

F Forced S Scheduled 2

Reason A - Equipment Failure(Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &LIcense Examination F - Administrative G - Operational Error (Explain)

H - Other(Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)

ExhibitG-instructions forPreparation ofData EntryScheets Licensee Event Report(LER) Fde (NUREG4161)

Exhibit1-Same Source

I'I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ 50-250 UNIT Turke Point 3

DATE A ril 15 1990 COMPLETED BY T.

W. Lovell TELEPHONE 305 246-7103 REPORT MONTH March 1990 Unit 3

was shutdown for a

scheduled refueling and maintenance outage.

AVERAGE DAZLY 'UNZT POWER LEVEL DOCKET NO ~ 50-251, UNZT Turke Point 4

DATE! A ril 15 1990 COMPLETED BY'. W..Lovel'1 TELEPHONE'05 246-7105 MONTH March 1990 DAY AVERAGE DAZLY POWER (MWe-'Net) 3/ 1/90 3/ 2/98 3/ 3/90 3/ 4/90 3/ 5/90 3/ 6/98 3/

7/98'/

8/90 3/ 9/90 3/10/90 3/ii/90 3/12/90 3/13/90 3/14/90, 3/15/90, 3/16/90 3/17/90 3/18/90

.3/19/90 3/20/90 3/21'/90 3/22/90 3/23/90 3/24/98 3/25/90 3/26/90 3/27/90 3/28/90 3/29/90 3/30/98 3/31'/90 703 701 698 698 698 699 695 695 699 780 700 696 694 692 691 637 647 691 690 690 697 698 695 690 688 687 683 688 685 686

4>

0 I

I 4

OPERATING DATA'REPORT OPERATING STATUS DOCKET HO 58 251 DATE 4/ 6/98 CGliP~ BY T>> )l>> LGVELL TPM~HGNE 305/246/7183 1>> UNIT HAMEt TM~Y POIHT UNIT 4 2>>

REPGRTIHG PERIODS MARCH 1998 3>> LICENSED THERMAL PNER (MHT)>>

2209 4>>

HAMEPLATE RATING (GROSS MHE)!

760 5>>

DESIGN ELECTRICAL RATING (HET SK):

693 6>>

MAXI,"UMDEPENDABLE CAPACITY (GROSS MME)t 699 7>>

MAXD>>>>M DEPENDABLE'CAPACITY (HET I(E) ~

566 8>> IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS-h(lMBER 3 THROUGH 7)

SINCE LAST REPORT>>

GIVE REASONS'>>,

POWER'LEVP TO HHICH RESTRICTED< IF AHY (HET MME) 10>>

REASONS fOR RESTRICTIONS'F Alt

'MONTHLY

-YTD-CUMULATIVE 11>>

HOURS IH REPORT PERIOOt 12>>

NUMBER GF HOURS REACTOR NS CRITICAL" 13>>

REACTOR RESERVE SHUTDOI( HOURS 14'>>

HOURS GENERATOR OH-LINE

'.5>> UNIT RESERVE SHUTDOWN HOURS

.6>>

GROSS THERMAL ENERGY GENERATED '(SH)

>>7>>

GROSS ELECTRICAL,ENERGY GEHERATED ()IH)

'.8>>

HET ELECTRICAL ENERGY GENERATED (lSH)

9>> UNIT SERVICE FACTOR Ze>>

UNIT AVAILABILITYFACTOR 21>>

CAPACITY FACTOR (USING MOC NET) 22>>

CAPACITY FACTOR'USING DER HET) 23>> UNIT FORCED. OUTAGE RATE 24>>

SHUTDGMNS'CHHNLED OVER'NEXT 6 1)HTHS>>

744 744>>8 0>>0 744>>0 e.e 1634311 537675 513582 lee,e 180>>8 183>>6 99>>6 e.e 2160 1942>>4 e.e 1930>>5 8>>8

4220818, 1383630 1317700 89>>4 89>>4 91>>6 ss,e e,e 145565,0 96326>>1 166>>6 92803>>3
32. 1-195445162 62377461 58988868 63.8 63>>8 62>>1 58>>5 li>>8-25>> IF SHUT DGWH. AT EI OF REPORT PERIOD<

ESTIMATED DATE OF STARTUPl

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH

March, 1990 DOCKET NO.

50-251 UNiT NA'ME Turkey Poi nt 84 A ril 15, 1990 COMPLETED By T.

W. Lovel 1 TELEPHONE (305) 246-7103 Date Type'uration (Hours)

Reason~

Method of Shutting Down Reactor Licensee Event Report¹ System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence Unit 4 operated at essentially full power and had no shutdowns or significant power reductions.

F Forced S Scheduled

'2 Reason A - Equipment Failure (Explain)

B - Maintenance orTest C - Refuelng D - Regulatory Restriction E - Operator Training 8 Ucense Examination F - Administrative G - Operational Error(Explain)

H - Other (Explain)

Method 1 - Manual 2-Manual Scram 3 - Automatic Scram 4-Continued 5 - Load Reduction 9 - Other(Explain)

Exhibit G-Instrucbons forPreparation ofData EntryScheets Ucensee Event Report(LER) Rle (NUREG4161)

Exhibit1-Same Source

I!

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~ 50-251 UNIT Turke Point 4

DATE A ril 15 1990 COMPLETED BY T.

W. Lovell TELEPHONE 305 246-7103 REPORT MONTH March 1990 Unit 4 operated at essentially full power and had no shutdowns or significant power reductions.

4'th