L-89-012, Special Rept:Listed Fire Protection Sys Impairments Opened. Causes Include Leaching in Thermolag Insulation,Grout Void & Faulty Latching & Locking Mechanisms on Fire Doors.List of Impairments Open in Excess of Tech Spec Limits Encl

From kanterella
(Redirected from L-89-012)
Jump to navigation Jump to search
Special Rept:Listed Fire Protection Sys Impairments Opened. Causes Include Leaching in Thermolag Insulation,Grout Void & Faulty Latching & Locking Mechanisms on Fire Doors.List of Impairments Open in Excess of Tech Spec Limits Encl
ML17345A631
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/09/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-89-012, L-89-12, NUDOCS 8901180360
Download: ML17345A631 (6)


Text

{{#Wiki_filter:ACCEILRATED DISTR1BUTION DEMONSTRATJON SYSTEM REGULATOR" NFORMATION DISTRIBUTION SyTEM (RIDS) ACCESSION NBR:8901180360 DOC.DATE: 89/01/09 NOTARIZED: NO DOCKET iFACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey 'Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAYFW.F. Florida Power & Light Co. RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept:on 890109,FPS impairments requiring NRC notification. DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ( ENCL / SIZE: TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc. NOTES: RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ACRS'MICHELSON ACRS WYLIE AEOD/DSP/TPAB ARM/DCTS/DAB NRR/DEST/ADE 8H NRR/DEST/CEB,8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB ll NRR/DREP/RPB 10 NUDOCS-ABSTRACT RES/DSIR/EIB RGN2 FILE 01 EXTERNAL: EGSG WILLIAMS,S H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1 '1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 4 4 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD ACRS MOELLER AEOD/DOA AEOD/ROAB/DSP DEDRO NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB,9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 NRR DRIS/SIB 9A 02 RES/DSR/PRAB FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1 1 2 2 1 1 2 2 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1, 1 1 1 1 1 1 MIX 'IO ALL "RIBS" REXZPIBGS'IZASE HELP US TO REGAUGE RESTE i CXÃIACT 13K DOCUMENT CXRZiL DESK F RXN Pl-37 (EXT. 20079) KO ELIMZHATE YOUR NAME PKH DISTRIBUTION LISTS POR DCjC(IMENTS YOU DON'T NEED) TOTAL NUMBER OF COPIES REQUIRED: LTTR 45 ENCL 44

P.O. B .4000, Juno Beach, FL 33408-0420 JANUARY 9 19S9 L-89-012 U. S. Nuclear Regulatory Commission .Attn: Document Control Desk Washington, D. C. 20555 Gentlemen: Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Special Report Breached Fire Barriers and Other Fire Protection S stem Im airments In accordance with Technical Specification 6.9.3.c, the attached Special Report is provided for your information. Should there be any questions on this information, please contact us Very truly yours, W. F. Con y Senior Vi e President Nuclear WFC/RHF/cm Attachment CC'alcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8'POl 180360 89'0109 PDR ADDCK 05000250 8 PNU RHFSRBFB an FPL Group company

SPECIAL REPORT JANUARY 9, 1989 FIRE PROTECTION SYSTEM IMPAIRMENTS REQUIRING NRC NOTIFICATION PURPOSE: 1 Technical, Specification (TS) 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days. TS 3.14 also states that certain other conditions require NRC notification. In accordance with the above requirements, this special report is being generated in order to notify the NRC. This report is being updated on a monthly basis. EVENT'urkey Point has been and is continuing to implement plant modifications. Fire Protection System (FPS) impairments are, at times, incurred during the performance of these modifications and during plant maintenance activities. Occasionally, certain FPS features fail due to random component failure. CAUSE AND CORRECTIVE ACTIONS: Fire Protection Impairments (FPI) 2173 and 2174'ere opened due to leaching in the Thermolag insulation'. FPI 2162 was opened due to a grout void. FPI 2181 was opened due to a faulty latching mechanism in a fire door, and FPI 2184 was opened due to 'a faulty locking mechanism on another fire door. FPI 2185 was opened in support of ICW pump foundation work. FPIs 2172 and 2190 were opened due to work on the reactor head leak detection system. FPI 2204 was opened to repair spalled concrete. FPI 2195 was opened in support of work on a source range detector. FPI 2182 was opened in support of the Component Cooling Water Heat Exchanger Replacement work. FPI 2142 was opened to replace a regulator. The plant continues to implement the compensatory measures as applicable.

SPECIAL REPORT FIRE PROTECTION SYSTEM IMPAIRMENTS OPENED SINCE LAST REPORT WHICH HAVE BEEN OPEN FOR LONGER THAN TECH SPEC LIMITS l FPI ¹ FEATURE TYPE OPENED. CLOSED 2142 2162 2172 2173 DETECTOR ALARM POINT 36 BARRIER 106E BARRIER 026M BARRIER THERMOLAG 3K1630 12/03/88 / / 12/06/88 12/22/88 12/06/88 12/21/88 11/24/88 12/16/88 2174 BARRIER THERMOLAG CONDUIT 3A1325 12/06/88 12/21/88 2181 2182 2184 DOOR 22-1 DETECTOR ALARM POINT 34 DOOR 58-2 12/08/88 12/15/88 12/08/88 / / 12/09/88 12/16/88 2185 2190 2204 BARRIER THERMOLAG B4R077 BARRIER STRUCTUAL STEEL 30.6 1 BARRIER FLAMMASTIC N-32 DETECTOR CABLE(CORE) BARRIER 093S 1 2/0'9/88 12/10/88 12/13/88 12/17/88 / / / -/ / / / /

FIRE PROTECT ION "SYSTEM INPAIRNENTS PREVIOUSLY NOT REPORTED CLOSED FPI ¹ FEATURE TYPE OPENED -CLOSED 1481 1782 2022 BARRIER 033C BARRIER 0)4N

BARRIER, THERHOLAB 4F 1 4 1 Oh/23/88 12/08/88 07/15/88 12/22/88

= 10/13 '88 12/14/88}}