L-88-251, Special Rept:Fire Protection Sys (FPS) Impairments Incurred During Performance of Plant Mod & FPS Features Fail Due to Component Failure.Caused by Number of Performed Mods & FPS Equipment Malfunction.Compensatory Measures Implemented

From kanterella
(Redirected from L-88-251)
Jump to navigation Jump to search
Special Rept:Fire Protection Sys (FPS) Impairments Incurred During Performance of Plant Mod & FPS Features Fail Due to Component Failure.Caused by Number of Performed Mods & FPS Equipment Malfunction.Compensatory Measures Implemented
ML17345A235
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/06/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-251, NUDOCS 8806140251
Download: ML17345A235 (5)


Text

ACCELERATED DIRIBUTION DEMONSTJTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS )

ACCESSION NBR:8806140251 DOC.DATE: 88/06/06 NOTARIZED: NO DOCKET,g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special rept:breached fire barriers

& other fire protection sys impairments.

DISTRIBUTION CODE:

IE22D COPIES RECEIVED:LTR I ENCL g SIZE:

TITLE: 50.73 Licensee Event Report (LER), InciGent Rpt, etc.

NOTES RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ACRS MICHELSON AEOD/DOA AEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB '9H NRRTDEST~B 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 NRR JURIS SIB 9A eke 02 RES/DE/EIB RGN2 FILE 01 EXTERNAL: EG&G WILLIAMS,S H ST LOBBY WARD NRC PDR NSIC MAYS,G COPIES LTTR ENCL 1

1 1

1 1

1 1

2 2

1 1

1 0

1 1

1 1

1' 1

1 1

1 1

1 1

1 1

1 1

1 1

4 4

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD2-2 PD ACRS MOELLER AEOD/DSP/NAS AEOD/DSP/TPAB DEDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7

NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RES TELFORD,J RES/DRPS DEPY FORD BLDG HOY,A LPDR NSIC HARRIS,J COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 D

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 45 ENCL 44

P.

OX 14000, JUNO 8EACH, 1 L 33408.0420 6

1988 L-88-251 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Special Report Breached Fire Barriers and Other Fire Protection S stem Im airments In accordance with Technical Specification 6.9.3 the attached Special Report is provided for your information.

Should there be any questions on this information, please contact us.

Very truly yours, W. F.

Co way Sr. Vice President-Nuclear WFC/PP/gp

=

Attachment.

cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant SDF/009.BFB 8806140251.

880606 PDR ADOCK 05000250 S

DCD an FPL Group company

PECIAL REPORT JUNE 6, 1988 PIRE PROTECTION SYSTEM IMPAIRMENTS REQUIRING NRC NOTIFICATION

~Par ose:

Technical Specification (TS) 3 ~ 14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days.

TS 3.14 also states that certain other conditions require NRC notification.

In accordance with the above requirements, this special report is being generated in order to notify the NRC.

This report is being updated on a 30 day basis.

Event:

Turkey Point has been and is continuing to implement plant modifications.

Fire Protection System (FPS) impairments are, at times, incurred during the performance of these modifications.

Occasionally, certain FPS features fail due to random component failure.

Cause and Corrective Actions:

The primary cause of the impairments is the number of modifications being performed.

Many of these modifications require the impairment of certain FPS features for their completions The secondary cause for the impairments is FPS equipment malfunction.

Because Turkey Point incurs a variable number of impairments, the plant is reporting the impairments in a monthly report, rather than on a case-by-case basis.

The impairments reported this month may be either open or closed at the present time, however they were open in excess of the Technical Specification permitted time limit.

This report includes impairments not reported previously which were:

1) opened prior to June and 2) stayed open for longer than the time permitted by the Technical Specifications, and 3) are either still open or were closed prior to June.

The closed impairments have been reported at the time opened, unless noted otherwise.

The plant continues to implement the compensatory measures as applicable.

FIRE PROTECTION SYSTEM IMPAIRMENTS OPENED SINCE 04-31-88 REPORT WHICH HAVE BEEN OPEN FOR LONGER THAN TECH SPEC LIMITS Page No.

1 06/n2/88 FPIO DESCRIPTION OPEN CLOSED 152 1 1573 1583 1620 1633 1634 1635 1636 1637 1638 1639 1641 1668 167 1 1675 BARR IER-MH42 1 BARRIER 033F PENETRAT ION 106E-E006 DOOR D-104-1 PENETRATION 097E-E031 PENETRATION 097E-E031 BARRIER 098E PENETRATION 097F-E014 PENETRATION 097F-E011 PENETRATION 097E-E028 PENETRATION 097S-H001 DAMPER 48-A PENETRATION 104E2-E002 FIRE DOOR 58-1 PENET-CND. SEAL 3 B07 05/18/88 05/18/88 05/18/88 05/03/88 04/25/88 04/25/88 04/25/88 04/25/88 04/25/88 04/25/88 04/26/88 04/27/88 05/10/88 05/15/88 05/23/88

/ /

i i

/ !

05/17 /88 05/09/88 05/09/88 05/09/88 05/13/88 05/13/88 05/09/88 05/05/88

/ /

/ /

/ /

/ /

Page 'No.

06/l)2/88 FIRE PROTECTION SYSTEM IMPAIRMENTS PREVInUSLY NOT REPORTED CLOSED FPI¹ DESCRIPTION OPEN CLOSED 13 11 1322 1328 133 1 1345 1376 1386 1389 1394 1396 1435 15 15 1528 1529 1530 153 1 1532 1533 1534 1536 1544 1545 1738 1739 1741 1747 PENETRAT.CONDUIT 3F401 PENETRATION-030F-M001 PENETRATION 040F-M001 PENETRATION 014N-M020 PENETRATION 036F-Mons DOOR 27-1 PENETRATION 012W-MOO5 PENETRATION 014N-M025 PENETRATION 016W-M003

" BARRIER 11S PENETRATION 097 S-E 0 02 PENETRATION 068W-E001 PENETRATION 067S-E006 PENETRATION 068 M-Eon 1 PENETRAT ION 098 F-E055 PENETRATION 106E-E005

~NETRATION 067 E-E008 PENETRATION 106S-E002 P EN ET RATION 106 N-E 0 09 BARRIER 098W PENETRAT ION 040 F-Hn0 1 PENETRATION 028N-E018 PENETRATION 108AS-E003 BARRIER 18-58-07 TSI PENET.-PER CRN-C-1892 PENETRATION 098F-E053 02/06/88 02/29/88 02/29/88 02/29/88 02/29/88 0 1/18/88 01/20/88 0 1/20/88 0 1/20/88 0 1/20/88 02/23/88 03/30/88 04/07/88 04/07/88 04/07/88 04/07/88 04/07/88 04/07/88 04/07/88 04/07/88 04/12/88 04/12/88 03/22/88 03/22/88 04/05/88 04/14/88 n5/n2/88 05/09/88 05/02/88 05/02/88 05/09/88 05/13/88 05/02/88 05/06/88 05/02/88 05/02/88 05/13/88 05/13/88 05/13/88 05/13/88 05/11/88 05/11/88 05/11/88 05/11/88 05/11/88 05/09/88 05/02/88 05/06/88 05/02/88 05/n4/ss 05/04/88 05/09/88