L-80-135, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/79-35,50-251/79-35,50-335/79-33 & 50-389/79-22. Corrective Actions:Qa Procedures Will Be Revised W/Full Compliance Achieved by 800731

From kanterella
(Redirected from L-80-135)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-250/79-35,50-251/79-35,50-335/79-33 & 50-389/79-22. Corrective Actions:Qa Procedures Will Be Revised W/Full Compliance Achieved by 800731
ML17339B076
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 05/01/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17339B075 List:
References
L-80-135, NUDOCS 8006040021
Download: ML17339B076 (2)


Text

e,i.

P.O. BOX 529100 MIAMI,F L 33152 I J 1

I Hr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Harietta Street, Suite 3100 Atlanta, Georgia 30303

'ear Hr. O'Reilly:.

Re:

RII:VLB 50-250/79-35 50-251/79-35 50-335/79-33 50-389/79-22 FLORIDAPOWER & LIGHT COMPANY

, Hay 1, 1980 L-80-135 This letter supplements Florida Power 5 Light Company's letter of Harch 21, 1980 (L-80-100) in response to the subject inspection report.

As stated in our previous

response, procedures will be revised by June 30, 1980.

Our further review of this matter indicates that additional time will be needed to train people in the implementation of these procedures.

Thus full compliance will be achieved by July 31, 1980 instead of June 30, 1980 as stated in our previous letter.

By October 31, 1980, all reports submitted to the NRC pursuant to 10 CFR 50.55(e) and Facility Technical Specifications (LER s) between August 10, 1977 and July 31, 1980 will be reviewed against the criteria specified in 10 CFR 21 paragraphs 21.3(d) and 21.3(k),

and those meeting the criteria of 10 CFR 21 paragraphs 21.3(d) and 21.3(k) will be reported in accordance with 10 CFR 21 paragraphs 21.21(a)

(2) and 21.21(b).

As discussed with members of your staff, Florida Power 8 Light Company does not agree that 10 CFR 21 requires evaluations of reports made to the NRC pursuant to 10 CFR 50.55(e) and Facility Technical Specifications (LER s).

Although we do not agree with your interpretation of this regulation, evaluations will be implemented as stated above to be in compliance with your understanding of the requirements of the regulation.

Very truly yours, Robert E. Uhng Vice President Advanced Systems 8 Technology REU/GDW/ah cc:

Harold F. Reis, Esquire-Robert Lowenstein, Esquire D'arrell G. Eisenhut 8006040 0~k