Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-25-006 Page 1 of 2 10 CFR 50.82(a)(9)
April 2, 2025 U.S. Nuclear Regulatory Commission ATTN: Shaun Anderson Chief, Reactor Decommissioning Branch Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility License No. DPR-35 NRC Docket No. 50-293 and 72-1044
Subject:
Request for Preapplication Readiness Assessments of the Draft License Termination Plan Holtec Decommissioning International (HDI) is respectively requesting the U.S. Nuclear Regulatory Commission (NRC) staff to conduct a preapplication readiness assessment of the revised draft License Termination Plant (LTP) for Pilgrim Nuclear Power Station (PNPS). We are confident that providing the NRC staff with an opportunity to assess the readiness of the draft LTP, with changes incorporated from prior feedback and industry lessons learned prior to formally submitting the LTP application, will improve the overall effectiveness and efficiency of the docketed submission by allowing the staff to identify any additional gaps between the current draft LTP content and the technical information required per regulatory requirements and guidance.
We suggest beginning the preapplication readiness assessment in a phased approach beginning in April 2025 leveraging the guidance provided in NRC Office of Nuclear Reactor Regulation (NRR) instruction LIC-116, Preapplication Readiness Assessment and look forward to coordinating with the staff to develop a detailed schedule in support of this effort as soon as practical.
To assist in this effort, HDI utilizes a secure web portal and will post applicable draft LTP materials to facilitate the currently requested NRC staff reviews. This LTP information will be finalized and provided publicly on the PNPS docket as part of the official LTP submittal.
HDI requests NRC feedback on the draft LTP information by August 31, 2025, and that approximately 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> is to be expended as part of this NRC review effort. If additional information is needed in support of this request, please contact Dave Noyes at (508) 830-7826.
This letter provides no regulatory commitments.
Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-25-006 Page 2 of 2 Should you have any questions or require additional information, please contact me at (856) 797-0900, X3587.
Respectfully, William Noval Director Regulatory Affairs Holtec Decommissioning International, LLC cc:
NRC NMSS Project Manager - Pilgrim Nuclear Power Station Digitally signed by William Noval DN: cn=William Noval, o=HDI, ou=Regulatory Affairs, email=w.noval@holtec.com Date: 2025.04.02 09:40:48 -04'00' William Noval