L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 34

From kanterella
(Redirected from L-23-055)
Jump to navigation Jump to search
Submittal of the Updated Final Safety Analysis Report, Revision 34
ML23144A300
Person / Time
Site: Beaver Valley
Issue date: 05/23/2023
From: Blair B
Energy Harbor Nuclear Corp
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23144A299 List:
References
L-23-055
Download: ML23144A300 (1)


Text

energy Energy Harbor Nuclear Corp.

harbor Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 Barry N. Blair 724-682-5234 Site Vice President, Beaver Valley Nuclear May 23, 2023 L-23-055 10 CFR 50.71 (e) 10 CFR 54.37(b)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001

SUBJECT:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Submittal of the Updated Final Safety Anal ysis Report, Revision 34 In accordance with the requirements of 10 CFR 50.71(e), the Energy Harbor Nuclear (EHN) Corp. is hereby submitting to the Nuclear Regulatory Commission (NRC) the Beaver Valley Power Station, Unit No. 1 (BVPS-1 ), Updated Final Safety Analysis Report (UFSAR), Revision 34. This submittal reflects facility and procedure changes implemented between May 11, 2021 (the end of Refueling Outage 27), and November 19, 2022 (the end of Refueling Outage 28), along with several changes implemented after Refueling Outage 28.

The BVPS-1 UFSAR, Revision 34 incorporates a presentation format change. The format change included adjustments such as the elimination of unnecessary extra pages, correction of spacing, renumbering of pages, and so on. All pages affected by the reformatting were provided with a page indicator of "Rev. 34." Those pages where actual text and table information were changed (non-format related) were indicated with a revision bar.

In accordance with 10 CFR 50.4(b)(6), the BVPS-1 UFSAR Revision 34 is submitted electronically on a total replacement basis.

  • Enclosure A- BVPS - 1 UFSAR, Revision 34, List of Effective Pages
  • Enclosure C - BVPS - 1 UFSAR, Revision 34, with information identified in accordance with NRC Regulatory Issue Summary (RIS) 2015-17 removed.

In addition to the UFSAR the following two enclosures are included in the submittal:

  • Enclosure D - BVPS-1 Licensing Requirements Manual (LRM), Revision 114

Beaver Valley Power Station, Unit No. 1 L-23-055 Page2

  • Enclosure E - Technical Specification (TS) Bases, Revision 47, submitted to satisfy TS 5.5.10.d, which requires submittal of TS Bases changes implemented without prior NRC approval.

For this BVPS-1 UFSAR update, no excessive detail, obsolete information, or redundant information has been removed in accordance with Appendix A to Nuclear Energy Institute (NEI) 98-03, Revision 1, "Guidelines for Updating Final Safety Analysis Reports," as endorsed by Regulatory Guide 1.181, "Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71(e)."

EHN Corp. conducted a review of BVPS-1 plant changes for 10 CFR 54.37(b) applicability. No components were determined to meet the criteria for newly identified components as clarified by Regulatory Information Summary (RIS) 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR 54.34(b) for Holders of Renewed Licenses."

There are l'IO regulatory commitment changes to be submitted in accordance with NEI 99-04, "Guidelines for Managing NRC Commitment Changes," Revision 0, as endorsed by NRC RIS 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff."

This certifies, to the best of our judgment and belief, that Revision 34 of the BVPS-1 UFSAR accurately presents changes made since the previous submittal that are necessary to reflect information and analysis submitted to the Commission or pursuant to Commission requirements.

This submittal contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at (330) 696-7208.

Barry N. Blair

Enclosures:

A. BVPS-1 UFSAR, Revision 34, List of Effective Pages B. BVPS-1 UFSAR, Revision 34, (Non-Public)

C. BVPS-1 UFSAR, Revision 34, (Public)

D. BVPS-1 Licensing Requirement Manual, Revision 114 E. Technical Specification Bases, Revision 47

Beaver Valley Power Station, Unit No. 1 L-23-055 Page 3 cc: (without Enclosures)

NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative