L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)
| ML21361A233 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/20/2021 |
| From: | Penfield R Energy Harbor Nuclear Corp |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21361A235 | List:
|
| References | |
| L-21-287 | |
| Download: ML21361A233 (4) | |
Text
1111B energy
~
harbor Rod L. Penfield Site Vice President, Perry Nuclear December 20, 2021 L-21-287 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Perry Nuclear Power Plant IO Center Road P.O. Box 97 Perry, Ohio 44081 440-280-5382 10 CFR 50.71(e) 10 CFR 50.54(a)
Supplemental Information for Updated Safety Analysis Report, Revision 22 By letter dated October 28, 2021, Energy Harbor Nuclear Corp. submitted to the Nuclear Regulatory Commission (NRC) the Perry Nuclear Power Plant (PNPP) Updated Safety Analysis Report (USAR), Revision 22 in CD-ROM format. In accordance with NRC guidance for electronic submissions, a listing of the document components that made up each CD-ROM was also provided.
In the October 28, 2021, submittal, the CD-ROM referred to as CD-ROM 2 contained a copy of the submitted documents with information identified in accordance with NRC
- Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," removed.
On December 13, 2021, the NRG staff identified that CD-ROM 2 contained information that had been removed in accordance with RIS 2015-17 in Revision 21 of the USAR.
Energy Harbor Nuclear Corp. has determined that this was done in error. Therefore, a corrected list of document components on CD-ROM is attached (Attachment 2) and a corrected CD-ROM 2 is enclosed (Enclosure B). These supersede and replaces in their entirety those provided in the October 28, 2021, submittal.
There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager, Fleet Licensing, at (330) 696-7208.
Perry Nuclear Power Plant L-21-287 Page2 :
List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)
Enclosure B:
Perry Nuclear Power Plant USAR with Information Identified Per RIS 2015-17 Removed, and Technical Specification Bases (on CD-ROM 2) cc:
NRC Project Manager NRC Region Ill Administrator (without Enclosure)
NRC Resident Inspector (without Enclosure)
L-21-018 List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)
File Name 001 LIST _EFF Rev 22.pdf 002 Chapter 00.pdf 003 Chapter 01.pdf 004 Chapter 02.0 to 02.4.pdf 005 Chapter 02.5 to 02E.pdf 006 Chapter 03.pdf 007 Chapter 04.pdf 008 Chapter 05.pdf 009 Chapter 06.pdf 010 Chapter 07.pdf 011 Chapter 08.pdf 012 Chapter 09.pdf 013 Chapter 10.pdf 014 Chapter 11.pdf 015 Chapter 12.pdf 016 Chapter 13.pdf 017 Chapter 14.pdf 018 Chapter 15.pdf 019 Chapter 16.pdf 020 Chapter 17.pdf 021 FIG_LIST Rev 22.pdf 022 Figures Section 01.pdf Page 1 of 2 023 Figures Section 02 (2.1-1 to 2.5-46).pdf 024 Figures Section 02 (2.5-47 to 2.5-49).pdf 025 Figures Section 02 (2.5-50 to 2.5-215).pdf 026 Figures Section 02D-1 to 02D-2.pdf 027 Figures Section 02D-3 to 02E-1.pdf Size 121 KB 1,008 KB 14,156 KB 14,225 KB 38,219 KB 15,665 KB 13,526 KB 13,848 KB 14,278 KB 13,909 KB 13,660 KB 15,450 KB 13,523 KB 13,800 KB 13,773 KB 13,386 KB 13,763 KB 14,723 KB 57 KB 72 KB 211 KB 5,433 KB 28,300 KB 20,215 KB 26,171 KB 19,648 KB 32,280 KB L-21-018 Page 2 of 2 File Name 028 Figures Section 03.pdf 029 Figures Section 04.pdf 030 Figures Section 05.pdf 031 Figures Section 06.pdf 032 Figures Section 07.pdf 033 Figures Section 08.pdf 034 Figures Section 09 (9.1-1 to 9.4-29). pdf 035 Figures Section 09 (9.5-1 to 9.5-26).pdf 036 Figures Section 09 (9A-1 to 9A-34).pdf 037 Figures Section 1 0.pdf 038 Figures Section 11.pdf 039 Figures Section 12.pdf 040 Figures Section 13.pdf 041 Figures Section 14.pdf 042 Figures Section 15.pdf 043 PNPP TS Bases Rev 13.pdf Size 27,846 KB 1,560 KB 4,989 KB 7,540 KB 10,280 KB 2,746 KB 18,370 KB 4,324 KB 616 KB 16,875 KB 2,660 KB 1,968 KB 145 KB 241 KB 5,587 KB 955 KB