L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)

From kanterella
(Redirected from L-21-287)
Jump to navigation Jump to search
Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)
ML21361A233
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/20/2021
From: Penfield R
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21361A235 List:
References
L-21-287
Download: ML21361A233 (4)


Text

1111B energy

~ harbor Perry Nuclear Power Plant IO Center Road P.O. Box 97 Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear

December 20, 2021 L-21-287 10 CFR 50.71(e) 10 CFR 50.54(a)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Supplemental Information for Updated Safety Analysis Report, Revision 22

By letter dated October 28, 2021, Energy Harbor Nuclear Corp. submitted to the Nuclear Regulatory Commission (NRC) the Perry Nuclear Power Plant (PNPP) Updated Safety Analysis Report (USAR), Revision 22 in CD-ROM format. In accordance with NRC guidance for electronic submissions, a listing of the document components that made up each CD-ROM was also provided.

In the October 28, 2021, submittal, the CD-ROM referred to as CD-ROM 2 contained a copy of the submitted documents with information identified in accordance with NRC

  • Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," removed.

On December 13, 2021, the NRG staff identified that CD-ROM 2 contained information that had been removed in accordance with RIS 2015-17 in Revision 21 of the USAR.

Energy Harbor Nuclear Corp. has determined that this was done in error. Therefore, a corrected list of document components on CD-ROM is attached (Attachment 2) and a corrected CD-ROM 2 is enclosed (Enclosure B). These supersede and replaces in their entirety those provided in the October 28, 2021, submittal.

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager, Fleet Licensing, at (330) 696-7208.

Perry Nuclear Power Plant L-21-287 Page2

List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)

Enclosure B:

Perry Nuclear Power Plant USAR with Information Identified Per RIS 2015-17 Removed, and Technical Specification Bases (on CD-ROM 2)

cc: NRC Project Manager NRC Region Ill Administrator (without Enclosure)

NRC Resident Inspector (without Enclosure)

Attachment 2 L-21-018

List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)

Page 1 of 2

File Name Size 001 LIST _EFF Rev 22.pdf 121 KB 002 Chapter 00.pdf 1,008 KB 003 Chapter 01.pdf 14,156 KB 004 Chapter 02.0 to 02.4.pdf 14,225 KB 005 Chapter 02.5 to 02E.pdf 38,219 KB 006 Chapter 03.pdf 15,665 KB 007 Chapter 04.pdf 13,526 KB 008 Chapter 05.pdf 13,848 KB 009 Chapter 06.pdf 14,278 KB 010 Chapter 07.pdf 13,909 KB 011 Chapter 08.pdf 13,660 KB 012 Chapter 09.pdf 15,450 KB 013 Chapter 10.pdf 13,523 KB 014 Chapter 11.pdf 13,800 KB 015 Chapter 12.pdf 13,773 KB 016 Chapter 13.pdf 13,386 KB 017 Chapter 14.pdf 13,763 KB 018 Chapter 15.pdf 14,723 KB 019 Chapter 16.pdf 57 KB 020 Chapter 17.pdf 72 KB 021 FIG_LIST Rev 22.pdf 211 KB 022 Figures Section 01.pdf 5,433 KB 023 Figures Section 02 (2.1-1 to 2.5-46).pdf 28,300 KB 024 Figures Section 02 (2.5-47 to 2.5-49).pdf 20,215 KB 025 Figures Section 02 (2.5-50 to 2.5-215).pdf 26,171 KB 026 Figures Section 02D-1 to 02D-2.pdf 19,648 KB 027 Figures Section 02D-3 to 02E-1.pdf 32,280 KB L-21-018 Page 2 of 2

File Name Size 028 Figures Section 03.pdf 27,846 KB 029 Figures Section 04.pdf 1,560 KB 030 Figures Section 05.pdf 4,989 KB 031 Figures Section 06.pdf 7,540 KB 032 Figures Section 07.pdf 10,280 KB 033 Figures Section 08.pdf 2,746 KB 034 Figures Section 09 (9.1-1 to 9.4-29). pdf 18,370 KB 035 Figures Section 09 (9.5-1 to 9.5-26).pdf 4,324 KB 036 Figures Section 09 (9A-1 to 9A-34).pdf 616 KB 037 Figures Section 1 0.pdf 16,875 KB 038 Figures Section 11.pdf 2,660 KB 039 Figures Section 12.pdf 1,968 KB 040 Figures Section 13.pdf 145 KB 041 Figures Section 14.pdf 241 KB 042 Figures Section 15.pdf 5,587 KB 043 PNPP TS Bases Rev 13.pdf 955 KB