In-Service Inspection Program Owners Activity Report (OAR-1)
ML23193A658
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/11/2023
From: Strand D
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
EPID L-2023-076, L-2023-076
Download: ML23193A658 (1)


Text

July 11, 2023 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program Owner's Activity Report (OAR-1)

L-2023-076 10 CFR 50.36 10 CFR 50.55a Enclosed is the St. Lucie Unit 2, SL2-27 outage, Owner's Activity Report, Form OAR-1.

Form OAR-1 implements Code Case N-532-5. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-27 refueling outage ended on March 18, 2023.

Should you have any questions regarding this submittal, please contact Kenneth Mack at ( 561 )-904-3635.

Sincerely, Dianne Strand General Manager, Regulatory Affairs Florida Power & Light Company

Attachment:

SL2-27 Refueling Outage OAR-1 Owner's Activity Report Cc:

NRC Region II Administrator NRC Site Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

Page 1 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISI-PSL-SL2-27-2023 Plant:

St. Lucie Nuclear Power Plant Unit 2 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-27 Current Inspection Interval: ISi-Fourth Interval, !WE-Third Interval Current Inspection Period: ISi - Second Outage Third Period, IWE - Second Outage Second Period Edition and Addenda of Section XI applicable to the inspection plan: ISi Fourth Interval and IWE Third Interval

- 2007 Edition through 2008 Addenda Date and Revision of inspection plan:

ISi - Fourth Interval February 3, 2023 Rev. 4 IWE-July 15, 2018, Rev. 0 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan:

Same Code Cases Used: N-513-4 N-532-5 N-652-2 N-722-1 N-729-6 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluat;ons support;nJ ~~n o~~:-27 conform to the requ;rements of Sect;on XI.

Signed __________

'TCJ

)" _________ Date 7/6/23 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

---~k;"'---'-'-.~-~------=---Commissions 15648AI IN R Inspector's Signature (National Board Number and Endorsements)

Date 06Jul2023

Page 2 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None

Page 3 of 3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Date Repair/

Class Description Description of Work Completed Replacement Plan Number None None None None None