July 13, 2016
. '..... ;,:;:Ji.-:.
. 1;'*.*
~--
~ l".l.
..~. i :
l!J: 'S'f Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: *: St. 'Lu*eie Units 1 and 2
.** ~ /'.Docket Nos: 50-335 and 50-389
- "
- NRC Regulatory Issue Summary 2016-09 L-2016-140 10 CFR 50.4 Preparation And Scheduling of Operator Licensing Examinations On June 16, 2016, NRC issued Regulatory Issue Summary (RIS) 2016-09, Preparation and Scheduling of Operator Licensing Examinations. RIS 2016-09 requests licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).
The-NRC statedJhatfth1$'.}information would h'elp the NRC"to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2016-09..
Enclosed please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.
Please contacf'Erik' Fe'ightner aV772-467-.7350 if th.ere are questions regarding* this submittal: *,, *
- 1
': ~-*"'*
r-,,-=.:c:.:
1.'
Very truly yoLirs,
.:-. ~. :. '
\\.*. *,
. ;.* *-~ -~... :
risto;~ ~~- '." ', '*
~:.... \\....' : '.:*
. ; i -~ i.:'.'.-~
Site Vice President**
'_Jc' '". 1 SC Lucie* Pl'arif : ! !',.*
CRC/tlt
.. \\.,
cc/enc: Eugene F. Guthrie, DRS, OB, Rll
.J Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) tP"' ****,,,..
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
~.-:1
>o OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.
Send rt
~
comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch [T-5
~
~
c EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by &-mail to
~
lnfocoDects.Resource@ruc.gov, and to the Desk Officer, Ollice of Information and Regulatory Affairs,
~<f..,
~($'~
NEOS.10202, (3150-0131), Office of Management and Budge~ Washington, DC 20501 If a means
- 11t*ir"'
used to impose an information collection does not display a currently vafid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRCREGION St. Lucie Plant II A. *PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021
\\.~
NUMBER OF REACTOR 5
6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 18 10 NUMBER OF SENIOR REACTOR 3
3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 04/08/2019 08/17/2020 ALTERNATE DATE 04/22/2019 08/31/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 23 16 CANDIDATES NRC FORM 536 (05-2016)