L-2016-140, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations
ML16230A001
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/13/2016
From: Costanzo C
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2016-140
Download: ML16230A001 (2)


Text

July 13, 2016

. '..... ;,:;:Ji.-:.

. 1;'*.*

~--

~ l".l.

..~. i :

l!J: 'S'f Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: *: St. 'Lu*eie Units 1 and 2

.** ~ /'.Docket Nos: 50-335 and 50-389

  • "
  • NRC Regulatory Issue Summary 2016-09 L-2016-140 10 CFR 50.4 Preparation And Scheduling of Operator Licensing Examinations On June 16, 2016, NRC issued Regulatory Issue Summary (RIS) 2016-09, Preparation and Scheduling of Operator Licensing Examinations. RIS 2016-09 requests licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).

The-NRC statedJhatfth1$'.}information would h'elp the NRC"to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2016-09..

Enclosed please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.

Please contacf'Erik' Fe'ightner aV772-467-.7350 if th.ere are questions regarding* this submittal: *,, *

  • 1

': ~-*"'*

r-,,-=.:c:.:

1.'

Very truly yoLirs,

.:-. ~. :. '

\\.*. *,

. ;.* *-~ -~... :


risto;~ ~~- '." ', '*

~:.... \\....' : '.:*

. ; i -~ i.:'.'.-~

Site Vice President**

'_Jc' '". 1 SC Lucie* Pl'arif : ! !',.*

CRC/tlt

.. \\.,

cc/enc: Eugene F. Guthrie, DRS, OB, Rll

.J Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) tP"' ****,,,..

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~.-:1

>o OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations.

Send rt

~

comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch [T-5

~

~

c EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by &-mail to

~

lnfocoDects.Resource@ruc.gov, and to the Desk Officer, Ollice of Information and Regulatory Affairs,

~<f..,

~($'~

NEOS.10202, (3150-0131), Office of Management and Budge~ Washington, DC 20501 If a means

  • 11t*ir"'

used to impose an information collection does not display a currently vafid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRCREGION St. Lucie Plant II A. *PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021

\\.~

NUMBER OF REACTOR 5

6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 18 10 NUMBER OF SENIOR REACTOR 3

3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 04/08/2019 08/17/2020 ALTERNATE DATE 04/22/2019 08/31/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 23 16 CANDIDATES NRC FORM 536 (05-2016)