L-2016-033, Preparation and Scheduling of Operator Licensing Examinations - Update

From kanterella
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations - Update
ML16055A116
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/22/2016
From: Costanzo C
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2016-033, RIS-15-005
Download: ML16055A116 (2)


Text

0February 22, 2016 FPLo L-201 6-033 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 NRC Regulatory Issue Summary 2015-05 Preparation And Scheduling of Operator Licensinq Examinations - Update Florida Power & Light Company submitted letter L-2015-159 dated May 26, 2015, responding to NRC issued Regulatory Issue Summary (RIS) 2015-05, Preparation and Scheduling of Operator Licensing Examinations dated April 20, 2015.

Recent discussion between St. Lucie Plant Training Department and NRC Region II has prompted correspondence to forward an update to St. Lucie Plant's NRC Form 536 request submitted last May.

Enclosed please find the updated NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.

Please contact us if there are any questions regarding this submittal.

Very truly yours, Cristopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt Enclosure cc/enc: Eugene F. Guthrie, DRS, OB, RII Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

NiRC FORMk 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3160-0131 EXPIRES: 1013'112017 (01-2015)

Estimated burden per response to comply with this voluntary Inforrmationr collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Thin information cotlection Is used to plan budgets and resources for operator

(* *examinations.

Send comments regarding burden estimate to the FOIA, Privacy, and Information 0 ERO LCESIGCollections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC EXAMINATION DATA 2o555-ooo1, or by itetmet e-mail to Infocollects.Resourrce@nrc.gov, and to the Desk Officer,

=*.-*.*Offe o ]nfrmaioeandReguatoy Afais, NOB-020, (150-131, Ofic ofManagement and Budget, Washington, DC 20503.

It a means used to impuse an information collection does not display a currentiy valid 0MB control number, the NRC may not conduct or sponsor, and a parson is not required to respond to. the information collacton.

FACILITY NRC REGION St. Lucie Plant I

A, PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 ESTIMATED NUMBEROF LICENSEE-PREPARED11 EXAMINATIONS ESTIMATED NUMBER OF NRC--PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 NUMBER OF REACTOR 8

0

  • OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 10 18 NUMBER OF SENIOR REACTOR30 OPERATORS - UPGRADE30 NUMBER OF SENIOR REACTOR00 OPERATORS - LUMITED00 PROPOSED DATES PRIMARY DATE "11/27/2017 11/04/2019 ALTERNATE DATE 12/04/12017 12/02/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NRC FORM 535 (01-2016)

0February 22, 2016 FPLo L-201 6-033 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 NRC Regulatory Issue Summary 2015-05 Preparation And Scheduling of Operator Licensinq Examinations - Update Florida Power & Light Company submitted letter L-2015-159 dated May 26, 2015, responding to NRC issued Regulatory Issue Summary (RIS) 2015-05, Preparation and Scheduling of Operator Licensing Examinations dated April 20, 2015.

Recent discussion between St. Lucie Plant Training Department and NRC Region II has prompted correspondence to forward an update to St. Lucie Plant's NRC Form 536 request submitted last May.

Enclosed please find the updated NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.

Please contact us if there are any questions regarding this submittal.

Very truly yours, Cristopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt Enclosure cc/enc: Eugene F. Guthrie, DRS, OB, RII Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

NiRC FORMk 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3160-0131 EXPIRES: 1013'112017 (01-2015)

Estimated burden per response to comply with this voluntary Inforrmationr collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

Thin information cotlection Is used to plan budgets and resources for operator

(* *examinations.

Send comments regarding burden estimate to the FOIA, Privacy, and Information 0 ERO LCESIGCollections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC EXAMINATION DATA 2o555-ooo1, or by itetmet e-mail to Infocollects.Resourrce@nrc.gov, and to the Desk Officer,

=*.-*.*Offe o ]nfrmaioeandReguatoy Afais, NOB-020, (150-131, Ofic ofManagement and Budget, Washington, DC 20503.

It a means used to impuse an information collection does not display a currentiy valid 0MB control number, the NRC may not conduct or sponsor, and a parson is not required to respond to. the information collacton.

FACILITY NRC REGION St. Lucie Plant I

A, PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 ESTIMATED NUMBEROF LICENSEE-PREPARED11 EXAMINATIONS ESTIMATED NUMBER OF NRC--PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 NUMBER OF REACTOR 8

0

  • OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 10 18 NUMBER OF SENIOR REACTOR30 OPERATORS - UPGRADE30 NUMBER OF SENIOR REACTOR00 OPERATORS - LUMITED00 PROPOSED DATES PRIMARY DATE "11/27/2017 11/04/2019 ALTERNATE DATE 12/04/12017 12/02/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NRC FORM 535 (01-2016)