|
---|
Category:Letter type:L
MONTHYEARL-2024-200, License Amendment Request L-2024-200, Updated Spent Fuel Pool Criticality Analysis in Support of Transition to 24 Month Fuel Cycles2024-12-19019 December 2024 License Amendment Request L-2024-200, Updated Spent Fuel Pool Criticality Analysis in Support of Transition to 24 Month Fuel Cycles L-2024-185, License Amendment Request L-2024-185, Licensing Basis Changes in Support of Transition to 24-Month Fuel Cycles2024-11-26026 November 2024 License Amendment Request L-2024-185, Licensing Basis Changes in Support of Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-167, Correction to St. Lucie L-2024-132, 2024 Population Update Analysis2024-10-22022 October 2024 Correction to St. Lucie L-2024-132, 2024 Population Update Analysis L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-169, Correction to the 2022 Annual Radioactive Effluent Release Report2023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, 2024-09-09
[Table view] Category:License-Operator
MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19158A2932019-06-0707 June 2019 SL-2019-301 Exam Final Items (ADAMS 2B) 2-Year Delayed Release ML19158A3142019-06-0707 June 2019 STL-2019-301 Exam Administrative Items (ADAMS 2C) 2-Year Delayed Release ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1692013-08-0808 August 2013 Initial Exam 2012-301 Final Simulator Scenarios ML13225A1662013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative Documents ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs 2022-04-20
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22332A0562022-11-21021 November 2022 301 License Exam Corporate Notification Letter L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment L-2021-146, Change Requested to Schedule of Operator Licensing Examination2021-07-19019 July 2021 Change Requested to Schedule of Operator Licensing Examination ML21137A3652021-05-13013 May 2021 Plan, Unit 1 and 2, Operator Licensing Retake Written Examination Approval 05000335/2021301 and 05000389/2021301 ML21083A1332021-03-19019 March 2021 Notification of Licensed Operator Intake Initial Examination 05000335/2021301 and 05000389/2021301 ML21034A5192021-02-0303 February 2021 1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key ML21034A5312021-02-0303 February 2021 1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21193A0872020-12-16016 December 2020 File 2A3 Exam Administrative Items ML21193A1052020-12-16016 December 2020 File 2A2 Exam Final Items ML21193A0522020-12-16016 December 2020 File 2B Normal Release Exam Administrative Items ML20351A2022020-12-15015 December 2020 301 Written Exam Approval Letter ML20339A6782020-12-0404 December 2020 Operator Licensing Operating Test Approval 05000335/2020301 and 05000389/2020301 ML20115E3532020-04-24024 April 2020 Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111 L-2020-038, Preparation and Scheduling of Operator Licensing Examinations2020-03-0606 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19158A2932019-06-0707 June 2019 SL-2019-301 Exam Final Items (ADAMS 2B) 2-Year Delayed Release ML19158A3312019-06-0707 June 2019 SL-2019-301 Exam Administrative Items (ADAMS 2D) ML19100A2442019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for St. Lucie Nuclear Power Plant ML19099A2902019-04-0909 April 2019 2019 Schedule Confirmation for St. Lucie ML18039A9282018-02-0808 February 2018 301 Exam Report Items RO as Given - Delay Release 2 Yrs ML18039A9332018-02-0808 February 2018 301 Exam Report Items SRO as Given - Delay Release 2 Yrs IR 05000335/20173012017-06-0909 June 2017 Notification of Licensed Operator Initial Examination 05000335/2017301 and 05000389/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 L-2016-033, Preparation and Scheduling of Operator Licensing Examinations - Update2016-02-22022 February 2016 Preparation and Scheduling of Operator Licensing Examinations - Update ML15201A5382015-07-16016 July 2015 301 Draft Simulator Scenarios ML15201A5642015-07-16016 July 2015 301 Other Documents for Retention ML15201A5612015-07-16016 July 2015 301 Final Administrative JPMs ML15201A5602015-07-16016 July 2015 301 Final Simulator and in Plant JPMs ML15201A5582015-07-16016 July 2015 301 Final Simulator Scenarios ML15201A5572015-07-16016 July 2015 301 Final Administrative Documents ML15201A5532015-07-16016 July 2015 301 Draft Administrative JPMs ML15201A5452015-07-16016 July 2015 301 Draft Simulator and in Plant JPMs ML15201A5372015-07-16016 July 2015 301 Draft SRO Written Exam ML15201A4962015-07-13013 July 2015 301 Draft RO Written Exam ML15201A4942015-07-13013 July 2015 301 Draft Administrative Documents ML15142A4012015-05-21021 May 2015 Initial Exam 2009302 Draft Admin Documents ML15142A4002015-05-21021 May 2015 Initial Exam 2009302 Final Admin Documents ML15097A2642015-04-0707 April 2015 301 Final RO Written Exam ML15097A2672015-04-0707 April 2015 301 Final SRO Written Exam ML15097A2692015-04-0707 April 2015 301 Post Exam Comments ML14318A9192014-11-12012 November 2014 Notification of Licensed Operator Initial Examination 05000335/2015301 and 05000389/2015301 ML13225A1712013-08-0808 August 2013 Initial Exam 2012-301 Final Sim/In-plant JPMs ML13225A1722013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative JPMs ML13225A1322013-08-0808 August 2013 Initial Exam 2012-301 Draft SRO Written Exam ML13225A1692013-08-0808 August 2013 Initial Exam 2012-301 Final Simulator Scenarios ML13225A1662013-08-0808 August 2013 Initial Exam 2012-301 Final Administrative Documents ML13225A1402013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative JPMs ML13225A1382013-08-0808 August 2013 Initial Exam 2012-301 Draft Sim/In-plant JPMs ML13225A1352013-08-0808 August 2013 Initial Exam 2012-301 Draft Simulator Scenarios ML13225A1282013-08-0808 August 2013 Initial Exam 2012-301 Draft Administrative Documents 2022-04-20
[Table view] |
Text
0February 22, 2016 FPLo L-201 6-033 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 NRC Regulatory Issue Summary 2015-05 Preparation And Scheduling of Operator Licensinq Examinations - Update Florida Power & Light Company submitted letter L-2015-159 dated May 26, 2015, responding to NRC issued Regulatory Issue Summary (RIS) 2015-05, Preparation and Scheduling of Operator Licensing Examinations dated April 20, 2015.
Recent discussion between St. Lucie Plant Training Department and NRC Region II has prompted correspondence to forward an update to St. Lucie Plant's NRC Form 536 request submitted last May.
Enclosed please find the updated NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.
Please contact us if there are any questions regarding this submittal.
Very truly yours, Cristopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt Enclosure cc/enc: Eugene F. Guthrie, DRS, OB, RII Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
NiRC FORMk 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3160-0131 EXPIRES: 1013'112017 (01-2015)
Estimated burden per response to comply with this voluntary Inforrmationr collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Thin information cotlection Is used to plan budgets and resources for operator
(* *examinations.
Send comments regarding burden estimate to the FOIA, Privacy, and Information 0 ERO LCESIGCollections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC EXAMINATION DATA 2o555-ooo1, or by itetmet e-mail to Infocollects.Resourrce@nrc.gov, and to the Desk Officer,
=*.-*.*Offe o ]nfrmaioeandReguatoy Afais, NOB-020, (150-131, Ofic ofManagement and Budget, Washington, DC 20503.
It a means used to impuse an information collection does not display a currentiy valid 0MB control number, the NRC may not conduct or sponsor, and a parson is not required to respond to. the information collacton.
FACILITY NRC REGION St. Lucie Plant I
A, PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 ESTIMATED NUMBEROF LICENSEE-PREPARED11 EXAMINATIONS ESTIMATED NUMBER OF NRC--PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 NUMBER OF REACTOR 8
0
- OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 10 18 NUMBER OF SENIOR REACTOR30 OPERATORS - UPGRADE30 NUMBER OF SENIOR REACTOR00 OPERATORS - LUMITED00 PROPOSED DATES PRIMARY DATE "11/27/2017 11/04/2019 ALTERNATE DATE 12/04/12017 12/02/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 535 (01-2016)
0February 22, 2016 FPLo L-201 6-033 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 NRC Regulatory Issue Summary 2015-05 Preparation And Scheduling of Operator Licensinq Examinations - Update Florida Power & Light Company submitted letter L-2015-159 dated May 26, 2015, responding to NRC issued Regulatory Issue Summary (RIS) 2015-05, Preparation and Scheduling of Operator Licensing Examinations dated April 20, 2015.
Recent discussion between St. Lucie Plant Training Department and NRC Region II has prompted correspondence to forward an update to St. Lucie Plant's NRC Form 536 request submitted last May.
Enclosed please find the updated NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.
Please contact us if there are any questions regarding this submittal.
Very truly yours, Cristopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt Enclosure cc/enc: Eugene F. Guthrie, DRS, OB, RII Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
NiRC FORMk 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3160-0131 EXPIRES: 1013'112017 (01-2015)
Estimated burden per response to comply with this voluntary Inforrmationr collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Thin information cotlection Is used to plan budgets and resources for operator
(* *examinations.
Send comments regarding burden estimate to the FOIA, Privacy, and Information 0 ERO LCESIGCollections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC EXAMINATION DATA 2o555-ooo1, or by itetmet e-mail to Infocollects.Resourrce@nrc.gov, and to the Desk Officer,
=*.-*.*Offe o ]nfrmaioeandReguatoy Afais, NOB-020, (150-131, Ofic ofManagement and Budget, Washington, DC 20503.
It a means used to impuse an information collection does not display a currentiy valid 0MB control number, the NRC may not conduct or sponsor, and a parson is not required to respond to. the information collacton.
FACILITY NRC REGION St. Lucie Plant I
A, PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 ESTIMATED NUMBEROF LICENSEE-PREPARED11 EXAMINATIONS ESTIMATED NUMBER OF NRC--PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 NUMBER OF REACTOR 8
0
- OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 10 18 NUMBER OF SENIOR REACTOR30 OPERATORS - UPGRADE30 NUMBER OF SENIOR REACTOR00 OPERATORS - LUMITED00 PROPOSED DATES PRIMARY DATE "11/27/2017 11/04/2019 ALTERNATE DATE 12/04/12017 12/02/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 535 (01-2016)