L-2014-062, Annual Fitness-For-Duty Program Report - Revision

From kanterella
(Redirected from L-2014-062)
Jump to navigation Jump to search
Annual Fitness-For-Duty Program Report - Revision
ML14070A362
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/26/2014
From: Katzman E
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2014-062
Download: ML14070A362 (4)


Text

a February 26, 2014 L-2014-062 10 CFR 26 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Annual Fitness-For-Duty Program Report - Revision In accordance with 10 CFR 26.717, letter forwards a revision to the fitness-for-duty program performance data for the period of January 1 through December 31, 2013.

NRC Annual Report Form version 1.5.1 is revised; however, there is no change to the data submitted.

Enclosed is the following revised attachment: Fitness For Duty Program Performance Data (via EIE General Submission Portal ID #553). 10 CFR Part 26, Subpart I - Annual Fatigue Results remains as previously sent via FPL letter L-2014-051, dated February 17, 2014.

Please contact us should you have any questions regarding this submittal.

Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/tIt Attachment Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2014-062 Attachment Fitness For Duty Program Performance Data - Revised Form (2 pages)

Ap FFD Prograrn F,.

S. N -11, C' A n Please explain the change(s) to the form Z Submission Update New form supplied by NRC Hak:

1) AN fields required except those mar*ed 'optional.
2) Use Adobe Reader 8 or later for this form to work properly.
3) Hold your mouse over a form field to view additional Information.

Select Facility st. Lucie [50-335; 50-389]

Tests Conducted In the Calendar Year Period of Report 2013i Total Number of Tests Conducted Total Number of Positive, Adulterated, Reason For Testing Licensee Employees ContractorsNendors Substituted, and Refusal to Test Results Random

[593

~

4681

~

LIIiIII For Cause

[1 1 1 I0i II1Z Post-Event 2II1

,J

°1 Followup 4°_

4I0 64]

2I Total (Calculated) 7770]

2,0391 I13 FFD Program Random Testing Population and Rate Average number of Average number of Total size of the random testing pool Annual random testing percentage licensee employees contractors/vendors throughout the period (Calculated) achieved for the testing pool 1

1,0 F

909 i

,01 F 28 Laboratory Testing Does your program use a Licensee Testing Facility?

N o

(Yes / No)

Identify your HHS-Certified Laboratory(ies)

IQuest Diagnostics, Inc Identify your Blind Performance Test Sample supplier(s)

Elsohly Laboratories Substances Tested Did your program only test for NRC-required substances m

Does your program conduct LOD testing Yes AND at the NRC-specified minimum cutoff levels? (Yes / No) Yes permitted in 26.163(a)(2)? (Yes / No)

[I Special Analyses Testing Results Total Number of "Dilute" Total Number of "Dilute" Specimens Specimen Test Results (Special Analyses Testing Conducted)

(Optional)

Use Only NRC Cutoff Initial Confirmatory LOD Testing?

Comment Substance Levels? (Yes I No)

Cutoff Cutoff (Yes I No)

(Optional)

Alcohol IYes 1 Not Applicable Cocaine Fes Ee Marijuana j1Y jjjsj EiiijjIJ_________________________

Amphetamines Yes IesE Z Opiates iesIIi~

_______es I 1 _____________________

PC Yes~

ieLZ Annual Report Form (version 1.5.1 - February 12, 2014)

- Page 1 of 2 Annual Report Form (version 1.5.1

- February 12, 2014)

-Page 1 of2-

Substances Tested - continued Summary of Management Actions - 26.717(b)(8)

Summarize actions implemented to improve FFD program performance. As applicable, reference in the topic description audit reports, 30-day reports, and/or corrective action reports. If reporting information on more than three topics, select "Others" for Topic 3 to report any additional topics.

Topic 1 Description Topic 1 Program and System Management There was one (1) subversion attempt during the 2013 reporting period.

St. Lucie Nuclear Plant had one (1) reportable event as defined in 10CFR Part 26.719 during this reporting period. On April 3, 2013, at 14:13 (EST) a 24-hour reportable FFD event report (#48882) was made in accordance with 10 CFR 26.719(b)(2)(ii).

Topic 2 Description Topic 2 Blind Performance Test Samples For the 2013 reporting period, all blind specimens submitted to St. Lucie Nuclear Plant's HHS certified laboratory yielded expected results.

0 Add an additional Topic Topic 3 Random Testing Topic 3 Description Two (2) random specimens were lost in transit by the laboratory courier. The specimens were not recovered. The two (2) individuals were retested with negative results.

Person(s) Responsible for Information Provided Person 1 (required):

Robert 1Boskey Access/FFD Supervisor IRobert.L.Boskey@fpl.com First Name Person 2 (optional):

Last Name P'osition I tle Company Email Address I'

1 I David Bonthron IAAFFD Program Manager I david~bonthron@fpl.com First Name Last Name Position Title Company Email Address Final Step (Required) - NRC will consider this form authentic in accordance with 26.11 only when the "Validate & Lock" button has been selected and all errors (i.e., those highlighted in red) have been corrected. The "Validate & Lock" button will change to "Locked" after the data validation process has been successfully completed and the form is ready for submission.

Form Locked On: Feb 24, 2014 at 8:04:25 AM ]

t Annual Report Form (version 1.5.1 - February 12, 2Ol4)ISt. Lucie [50-335; 50-389]

J Period of Report:12013 I

- Page 2 of 2 -

Annual Report Form (version 1.5.1 - February 12, 2014) ISt. Lucie [50-335; 50-389]

Period of Report:[!O ý3

- Page 2 of 2 -