L-2012-384, Initial Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

From kanterella
(Redirected from L-2012-384)
Jump to navigation Jump to search

Initial Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML12300A420
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/25/2012
From: Jensen J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, L-2012-384
Download: ML12300A420 (2)


Text

October 25, 2012 L-2012-384 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Florida Power & Light (FPL)'s Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

References:

1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (ML12054A682)
2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 30, 2012 (ML12221A339)

On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission")

issued an order (Reference 1) to FPL. Reference 1 was immediately effective and directs FPL to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 30, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms FPL has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in associated spent fuel storage pools as described in Attachment 2 of Reference 1.

Major activities completed during this reporting period:

  • Resources are being identified and project plans initiated, including development of milestones, to assure compliance with Reference 1.

Planned activities for the next six months:

Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

St. Lucie Units 1 and 2 L-2012-384 Docket Nos. 50-335 and 50-389 Page 2 0 Development and submittal of the overall integrated plan.

Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal:

  • None at this time.

Project milestones schedule through completion of installation and testing:

" A project milestones schedule will be provided with the overall integrated plan.

" Implementation of the order will be completed for St. Lucie Unit 1 prior to startup from Refueling Outage (RFO) SL1-26 Spring 2015.

  • Implementation of the order will be completed for St. Lucie Unit 2 prior to startup from Refueling Outage (RFO) SL2-22 Fall 2015.

This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Eric S. Katzman, Licensing Manager at (772) 467-7748.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on October -Y-,2012.

Respectfully submitted, Joseph Jensen Site Vice President St. Lucie Plant cc: Eric J. Leeds, Director, Office of Nuclear Reactor Regulation Victor McCree, NRC Regional Administrator Tim Hoeg, NRC Resident Inspector Trace Orf, NRC Licensing Project Manager Ms. Lisa M. Regner, NRR/JLD/PMB, NRC Mr. Blake A. Purnell, NRR/JLD/PMB, NRC Mr. Steven R. Jones, NRR/DSS/SBPB, NRC