0 F=PL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 February 22, 2010 L-2010-028 10 CFR 26 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Annual Fitness-For-Duty Program Report In accordance with 10 CFR 26.717, letter forwards the attached fitness-for-duty program performance data for the period of January 1 through December 31, 2009.
Please contact us should you have any questions regarding this submittal.
Sincerely, Eric S. Katzman Licensing Manager St. Lucie Plant ESK/tlt Attachment an FPL Group company
4-St. Lucie Plant Docket Nos. 50-335 and 50-389 L-2010-028 Attachment Page 1 of 5 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Florida Power & Light Co.
2009 Company Annual Reporting Period St. Lucie Nuclear Plant R.L. SoskeLy (772)
Contact Name Phonq Cutoffs: Screen/Confirmation (ng/ml) & Alcohol (% BAC)
X 10 CFR 26 Levels identified in Sections 26.103 and 26.163 467-7003 e Number Testing Results Licensee Employees Contractor Personnel Average number with Unescorted Access 1176 1067 Total: 2243 Categories Tested Positive Tested Positive Follow-Up 11 0
50 0
For Cause -
Observed Behavior 2
0 0
0 For Cause -
Post Event 3
0 13 0
Pre-Access 137 0
1119 11 Random 657 1
533 5
Total 810 1
1715 16 During the reporting period of 2009, Florida Power & Light Co./ St. Lucle Nuclear Plant conducted 2525 drug and alcohol tests in accordance with 10 CFR Part 26. Random test rates are as follows:
Reporting Period POOLS 2009 St. Lucle Nuclear Plant 52.9%
Page 1 of 3 Annual Fitness for Duty Report AAFFD149 Rev7 2/10/10
St. Lucie Plant Docket Nos. 50-335 and 50-389 L-2010-028 Attachment Page 2 of 5 BREAKDOWN OF CONFIRMED POSITIVE TESTS C
Amphe-Phency-Refusal Site Location Marijuana Cocaine-Opiates tamines clidine Alcohol to Test Licensee Employees 1
0 0
0 0
0 0
Contractors 1
11,
1 0
1 01 0
13 11 Total 1
12 1
0 1
0
[
0 1
3 1
1 117 Management Actions For the reporting period of 2009, seventeen (17) individuals were denied unescorted access authorization after testing positive for drugs or alcohol. By test type, eleven (11) pre-access tests were positive, and six (6) random tests were positive.
Follow-Up Test One (1) contractor individual's test indicated evidence of alcohol which was a violation of his conditional access agreement. The individual was denied access.
Pre-Access Positive Tests Six (6) Initial contractor individuals tested positive for Marijuana. Two (2)
Reinstatement contractor individuals tested positive for Marijuana. One (1)
Reinstatement contractor individual tested positive for Alcohol. One (1)
Reinstatement contractor individual tested positive for Cocaine. These individuals were denied access. One (1) Initial contractor individual Refused to test after providing a specimen with no temperature. This individual was permanently denied access.
Random Positive Test One (1) Licensee employee tested positive for Marijuana. Three (3) contractor employees tested positive for Marijuana. Two (2) contractor employees tested positive for Alcohol. These individuals were denied access.
Additional Comments
- 1. There was One (1) possible subversion attempt during the 2009 reporting period.
A specimen with no temperature was submitted on a pre-access test. The individual refused to provide an observed specimen. The information Is listed under Pre-Access positive tests above.
- 2. For the 2009 reporting period, all blind specimens submitted to St. Lucie Nuclear Plant's HHS-certified laboratory yielded expected results.
Page 2 of 3 Annual Fitness for Duty Report AAFFD149 Rev7 2/10/10
St. Lucie Plant Docket Nos. 50-335 and 50-389 L-2010-028 Attachment Page 3 of 5 Reportable Events St. Lucle Nuclear Plant had no reportable event as defined in 10 CFR Part 26.719 during this reporting period.
Page 3 of 3 Annual Fitness for Duty Report AAFFD149 Rev7 2/10/10
St. Lucie Plant Facility Name Report Period 10 CFR Part 26, Subpart I - Annual Fatigue Results Docket Nos. 50-335 and 50-389 St. Lucde V 12009 L-2010-028 Attachment Page 4 of 5 Summary of Waiver Issuance - 26.203(e)(1)(i-ii)
Number of Waivers Issued (Note: At least one of the cells in this table should have a non-negative value)
Operating or on-site Performing health physics Performing duties of a fire Performing maintenance or Performing security of chemistry duties as brigadeonsite direction of duties as described Operating Outage CombIed Work Hour Controls of systems as described in festribduties(as brigad member4as maintenance, as described 26.4(a)(1) described 26.(a)(2) described in 26.4(a)(3) in 26.4(a)(4) 26.4(a)(5)
Total Total
-Total Operating Outage Operating Outage Operating
.Outage Operating Outage Operating
- Outage, Exceed 16.work hrs in any 24 hr period 0
N/A 0
N/A 0
N/A 0
N/A 0
N/A 0
N/A 0
Daily Work Exceed 26 work hrs in any
- . =
Hours 48 hr period 0
N/A 0
N/A 0
N/A 0
N/A 0
N/A 0
N/A 0
26.205(d)(1)
Exceeded 72 work hrs in any 7 day period.
0 N/A.
0 N/A 0
N/A 0
N/A 0
N/A 0
N/A Less than 10 hr break b/t successive work periods (for 8 hr Rest Breaks break accommodating scheduled 26.205(d)(2) transition b/t shifts) 0 N/A 0
N/A 0
N/A 0
N/A 0
N/A 0
N/A Less than 34 hr break in any9 day period 0
N/A 0
N/A 0
N/A 0
N/A 0
N/A*
0 N/A 0
Avg of less than 1 day off per week for 8-hour shifts while operating-0 0
0 0
0 0
0 Avg of less than 2 days off per week Minimum for.1.0hour shifts while operating 0
0 0
0 0
0 0
Days Off Per Avg of less than 2.5 days off per Shift Cycle week for 12-hour shiftswhile 26.205(d)(3) operating 0
0 0
0 Avgof, less than 2 days,off per week for 12-hour miaintenance shifts 0
0 Avg of less than. 3 days off per week for:12-hour security shifts 0
0 Less than 3 days off per successive Minimum 15-day' period N/A N/AN/
Days Off for Outage Less
..... than 1 dayoff per 7-day period Activities for maintenance personnel
/---
26.205(d)(4) f and an.205(d)(5)
Less than 4 days off per successive 26.205(d)(5 15-day period for security personnel N/A N/A
.J..
TOTAL 0
N/A.
0
.N/A 0
N/A 0
N/A 0
N/A 0
N/A,
- NOTE: For individuals performing fire brigade duties and other duties, please count them only under the fire brigade column. Do not double count these individuals.
10 CFR Part 26, Subpart I - Annual Fatigue Results St. Lucie Plant Docket Nos. 50-335 and 50-389 L-2010-028 Attachment Page 5 of 5 Facility Name St. Lucie L
Report Period 12oI t-Distribution of Waiver for Individuals in Each Cateqory - 26.203(e)(1 )(iii)
Number of Employees Issued Waivers Operating or on-Performing Performing Performing site directing of health physics duties of a fire maintenance or Performing Number of Waivers the operations or chemistry brigade member onsite directing security duties of systems, as duties as as described in of maintenance as described in described in described in as described in 26.4(a)(5) 26.4(a)(1) 26.4(a)(2) 26.4(a)(3)
- 26.4(a)(4) 1 N/A N/A N/A N/A N/A 2*
N/A N/A N/A N/A N/A 3
N/A N/A N/A N/A N/A
- 4.
N/A N/A N/A N/A NiA 5
N/A N/A N/A N/A N/A 6
N/A N/A N/A N/A N/A 7
N/A N/A
-N/A N/A N/A 8
N/A N/A N/A N/A N/A 9
N/A N/A N/A N/A.
N/A 10 N/A N/A N/A N/A N/A 11-20 N/A N/A N/A N/A N/A
,More than 20 N/A N/A N/A N/A N/A Total Number of 0
Employees Issued Waivers 0
0 0
0 Most WaiversN1 Provided to a Single Individual N/A N/A N/A N/A N/A Note: For iodioduais performing the fire brigade dutemes. pfease ucout them owty cnder fire brigade column, Do not double -ount these indmiduals.
Summary of Corrective Actions - 26.203(e)(2)
Analysis of Waiver Assessment Data:
N/A Analysis of Fatigue Assessment Data:
N/A
==
Conclusions:==
N/A Summary of Status of Corrective Actions:
N/A