Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 August 13, 2009 I=PL L-2009-191 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Regulatory Issue Summary 2009-11 Preparation And Scheduling of Operator Licensing Examinations On July 16, 2009, NRC issued Regulatory Issue Summary (RIS) 2009-11, Preparation and Scheduling of Operator Licensing Examinations. RIS 2009-11 requested licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).
The NRC stated that this information would help the NRC to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2009-11.
Enclosed please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.
Please contact us if there are any questions regarding this submittal.
rV truly your o don Jo ston S it-t ce President St. Lucie Plant GLJ/tlt Enclosure cc/enc: Malcolm T. Widmann, DRS, OB, RII an FPL Group company
NRC FORM 536 10-2008)
U.S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget. Washington. DC 20503.
If a means used to impose an information collection does not display a currently valid DMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
i FACILITY Florida Power & Light Company, St. Lucie Units I & 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011 CY 2012 Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2 012 CY 20 13 NUMBER OF REACTOR 0
18 4
15 OPERATORS NUMBER OF SENIOR REACTOR 0
4 11 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
2 2
4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
PROPOSED DATES PRIMARY DATE 01/31/2011 04/23/2012 03/18/2013 ALTERNATE DATE 02/14/2011 04/30/2012 04/01/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 20 CANDIDATES NRC FORM] 536 (10-2005)