L-2007-124, Preparation and Scheduling of Operator Licensing Examinations
| ML072330089 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/09/2007 |
| From: | Johnston G Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2007-124, RIS-07-017 | |
| Download: ML072330089 (2) | |
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 August,9, 2007 F=PL L-2007-124 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Regulatory Issue Summary 2007-17 Preparation And Scheduling of Operator Licensing Examinations On July 12, 2007, NRC issued Regulatory Issue Summary (RIS) 2007-17, Preparation and Scheduling of Operator Licensing Examinations. RIS 2007-17 requested licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).
The NRC stated that this information would help the NRC to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2007-17.
Attached please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.
Please contact us if there are any questions regarding this submittal.
Veryr ly yours, Gordon L. Johnsto Site Vice Preside St. Lucie Plant GLJ/tlt Attachment an FPL Group company A-le-J
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden perre sponset o comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. S end comments regarding burden OPERATOR LICENSING estimate to the Records and FO IA/Privacy Services Branch (T-5 F53), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Informat ion EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
I fa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not con duct or sponso r, and a person is not requir ed t o re spond to, t he information collection.
FACILITY NRC REGION Florida Power and Light St. Lucie Power Plant Units 1 & 2 2
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 08 CY 09 CY 10 CY 11 NUMBER OF REACTOR OPERATORS 1
10 10 10 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 7
3 3
3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3
1 1
1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 7/21/2008 9/28/2009 9/30/2010 9/26/2011 ALTERNATE DATE 8/04/2008 11/30/2009 10/25/2010 10/17/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 536 (8-2005)
PRINTED ON RECYCLED PAPER