AUG 2 6 2004 FPL L-2004-194 10 CFR 26.71 U.S Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555 Re: Turkey.,Point!Units.3 and 4 Docket Nos. 50-250 and 50-251 Semiannual Fitness for Duty Performance Report Attached is the Semiannual Fitness for Duty Performance Report for the period from January 1, 2004, through June 30, 2004, for Turkey Point Units 3 and 4, as required by 10 CFR 26.71 (d).

The Turkey Point Fitness for Duty Program uses a random testing rate of at least 50%.

Attachment A contains the program performance data. Also attached is a list of events

-reported-and a summary-of management-actions-taken.

Should there be any questions or comments regarding this information, please contact us. .- ,

Very truly yours, Terry0.J es --- , -

Site Vice President *.

Turkey Point Nuclear Plant,;

OIH Attachment

,. ,;, l , .X i hi**

Jo\l-*p*** ,

an FPL Group company

L-2004-1 94 Attachment A Page 1 of 2 FITNESS FOR DUTY PROGRAM , J .TO

!PESON PERFORMANCE 10 DATA PERSONNEL;SUBJE'CT TO IO CFR 26 Florida Power & Light (FPL) 30 June 2004 Company Six (6) Month Ending Turkey Point Plant Location Jim Denton (305) 246-7171 Contact Name Phone (include Area Code)

Cutoffs: Screen/Confirmation (nglml) Appendix A to 10 CFR 26 Marijuana 50/10 Amphetamines 1000/500 l Cocaine 300/150 Phencyclidine 25/25 l Opiates 300/300 Alcohol (%BAC) .04% l LICENSEE LONG-TERM SHORT-TERM TESTING LICENSEE TEMPORARY CONTRACTOR CONTRACTOR RESULTS EMPLOYEES EMPLOYEES PERSONNEL PERSONNEL Average Number with Unescorted Access 815 10 - 158-- 255 TOTAL: 1238 CATEGORIES TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access 79 0 14 1 0 0 427 6 TOTAL: 520 0 0 0 0 0 0 3 0 Post For Accident Cause Observed 0 0 0 0 0 0 3 1 Behavior 192 0 1 0 42 0 72 0 Random TOTAL: 317 18 0 0 0 1 0 0 0 Follow-up TOTAL: 19 Other 289 0 15 1 43 0 505 7 TOTAL

L-2004-194 Attachment A Page 2 of 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report Ending:. 30 June 2004 CATEGORY: Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol tRoTest Licensee Employees 0 0 0 0 0 0 0 Licensee Temporary Employees 1 0 0 0 0 0 0 Long-Term Contractors I 0 o 0 1 0 0 Short-Term Contractors 5 0 0 0 0 2 0 Total PTN TOTAL 6 010 0 0 2 01l 8

  • (3) of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50ng/ml) but did not exceed the DHHS/NRC cutoff level (100ng/mI). All of the remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels. One 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reportable event was reported in March 2004. A contract supervisor was positive for marijuana.

FFD Performance Data Review/Comments:

1. Were any programmatic weaknesses identified: NOP JE
2. What management actions have been taken or initiated? If any, explain:. NONE
3. Notate any specimens that were adulterated and substance detected:_ NONE
4. 2004 Percent of Random Population Tested: 25.61%