L-2003-230, Radiological Emergency Plan - Revision 43 Emergency Plan Implementing Procedure

From kanterella
Jump to navigation Jump to search
Radiological Emergency Plan - Revision 43 Emergency Plan Implementing Procedure
ML032790332
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/02/2003
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EPIP-08, Rev 6, L-2003-230
Download: ML032790332 (1)


Text

FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 October 2, 2003 L-2003-230 10 CFR 50.54(q) 10 CFR 50 Appendix E U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Radiological Emergency Plan - Revision 43 Emeraencv Plan Implementing Procedure In accordance with 10 CFR 50.54(q) and 10 CFR 50 Appendix E, enclosed is one copy of the St. Lucie Plant Radiological Emergency Plan Revision 43 and Emergency Plan Implementing Procedure, EPIP-08, Off-Site Notifications And Protective Action Recommendations," Revision 6.

The plan, as revised, continues to meet the standards of 10 CFR 50.47(b) and the requirements of 10 CFR 50, Appendix E. Revision 6 to EPIP-OB was a change to revise the State Notification form by deleting the supplemental data sheet and revising the instructions. This revision also improves guidance relative to changing protective action recommendations (PARs). provides a summary of the changes to the plan and the documentation of Florida Power and Light Company's (FPL) conclusion that the revision does not represent a decrease in the effectiveness of the plan. Enclosure 2 is Revision 43 of the St. Lucie Plant Radiological Emergency Plan. Enclosure 3 is a copy of EPIP-OB, Revision 6.

Please contact us if there are any questions regarding these documents.

Willa J fe n, Jr.

Vice Presi ent St. Lucie Plant n

i e WJ/tlt Enclosures an FPL Group company