L-2003-216, Semi-Annual Fitness-for-Duty Program Performance Data
| ML032521385 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/20/2003 |
| From: | Jefferson W Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2003-216 | |
| Download: ML032521385 (3) | |
Text
0 FPL Florida Power & Ught Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 August 20, 2003 L-2003-21 6 10 CFR 26.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Semi-Annual Fitness-For-Duty Program Performance Data In accordance with 10 CFR 26.71(d), this letter forwards the attached fitness-for-duty program performance data for the six-month period ending June 30, 2003.
Please contact us should you have any questions regarding this submittal.
Very ruly you Sarre~rson r.
Vice President St. Lucie Plant WJ/tit Attachment T.
an FPL Group company
Ad
-~~~~~~~~~~~~~
L-2003-21 6 Attachment Page 1 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Florida Power & Liaht (FPL)
Company St. Lucie Nuclear Plant Location June 2003 Six (6) Month Ending (772467-7008 / (561) 694-3355 Phone (Include Area Code)
Julie Mueller - PSL I David Bonthron - JB Contact Name Cutoffs: ScreenlConfinnation ng/ml)
Appendix A to 10 CFR 26 Marijuana 50
/
10 Cocaine 300 1
150 Opiates 300
/
300 Amphetamines Phencyclidine Alcohol (%BAC) 1000 1 500 I
25 1
25
.04%
I LONG-TERM SHORT-TERM TESTING LICENSEE CONTRACTOR CONTRACTOR RESULTS EMPLOYEES PERSONNEL PERSONNEL Average Number with Unescorted Access TOTAL:
1497 946 184 367 CATEGORIES III TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access TOTAL:
513 30 0
0 0
483 5
Post ForCause Accident 0
0 4
0 0
0 TOTAL:
6 Observed Behavior 2
1 0
0 0
0 Random 253 0
49 0
97 0
TOTAL:
399 Follow-up 14 0
0 0
7 0
TOTAL:
21 TOTAL 939 299 153 0
587
-5
L-2003-21 6 Attachment Page 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report Ending:
June 2003 CATEGORY:
Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol to Teal Licensee Employees I
Long-Term Contractors 3
0 0
0 0
0 0
Short-Term Contractors 1
0 0
0 0
01 Total PSL Total 5
- 0 0
0 0
1 1
7 I...
Three (3) of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50ng/ml) but did not exceed the DHHS/NRC cutoff level (1 00ng/ml). All of the remaining positive drug test results listed above exceeded the DHHSINRC cutoff levels.
One (1) licensee employee tested positive for both marijuana and alcohol.
FFD Performance Data RevIew/Comments:
- 1. Were any programmatic weaknesses identified:
None
- 2. What management actions have been taken or Initiated? If any, explain:
- 3. Notate any specimens that were adulterated and substance detected:
None
- 4.
2003 Percent of Random Population Tested:
26.62%