March 2003 Monthly Operating Report for St. Lucie Units 1 & 2
ML031070119
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/14/2003
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-090
Download: ML031070119 (8)


Text

S -

Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 0

FPL April 14, 2003 L-2003-090 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the March 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units I and 2.

Report also contains a corrected page from the Unit 1 Operating Data Report for February 2003. There was a calculation error on line 6 - Net Electrical Energy (MWH).

Please contact us should there be any questions regarding this information.

Vice PFsidert St. Lucie Plant WJ/spt Attachments "A

an FPL Group company

,I

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: April 1,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: March 2003 1.Design Electrical Rating (Mwe-Net) 830

2. Maximum Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMIJLATIVE
3. Number of Hours Reactor Critical_ 744 2160 186944
4. Number of Hours Generator On Line__ 744 2160 185110.3
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) - 638824 1858480 151454614

CORRECTED PAGE DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: March 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: February 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical_ 672 1416 186200
4. Number of Hours Generator On Line_ _ 672 1416 184366.3
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 578938 1219656 150815790

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: April 1, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: March 2003 Unit I operated at essentially full power through the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: April 1, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: March 2003 Number Date Typel Duration Reason2 Method of Cause &Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence

=Unit 1 operated at essentially full power for the entire month of March.

I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 -Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: April 1, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: March 2003

1. Design Electrical Rating (Mwe-Net)e 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical_ 744 2160 150918.6
4. Number of Hours Generator On Line_ _ 744 2160 149160.3
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 629103 1836775 122992409

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: April 1,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: March 2003 Unit 2 operated at essentially full power through the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: April 1, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: March 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of March.

I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) I - Manual 8 - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 -Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

Text

S -

Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 0

FPL April 14, 2003 L-2003-090 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the March 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units I and 2.

Report also contains a corrected page from the Unit 1 Operating Data Report for February 2003. There was a calculation error on line 6 - Net Electrical Energy (MWH).

Please contact us should there be any questions regarding this information.

Vice PFsidert St. Lucie Plant WJ/spt Attachments "A

an FPL Group company

,I

DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: April 1,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: March 2003 1.Design Electrical Rating (Mwe-Net) 830

2. Maximum Dependable Capacity (Mwe-Net)_ 839 MONTH -YTD- CUMIJLATIVE
3. Number of Hours Reactor Critical_ 744 2160 186944
4. Number of Hours Generator On Line__ 744 2160 185110.3
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) - 638824 1858480 151454614

CORRECTED PAGE DOCKET NO.: 50-335 UNIT NAME: St. Lucie Unit 1 DATE: March 3,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: February 2003

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical_ 672 1416 186200
4. Number of Hours Generator On Line_ _ 672 1416 184366.3
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 578938 1219656 150815790

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: April 1, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: March 2003 Unit I operated at essentially full power through the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Unit I DATE: April 1, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: March 2003 Number Date Typel Duration Reason2 Method of Cause &Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence

=Unit 1 operated at essentially full power for the entire month of March.

I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 -Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)

DOCKET NO.: 50-389 UNIT NAME: St. Lucie Unit 2 DATE: April 1, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORTING PERIOD: March 2003

1. Design Electrical Rating (Mwe-Net)e 830
2. Maximum Dependable Capacity (Mwe-Net). 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical_ 744 2160 150918.6
4. Number of Hours Generator On Line_ _ 744 2160 149160.3
5. Unit Reserve Shutdown Hours_ __ 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 629103 1836775 122992409

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: April 1,2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: March 2003 Unit 2 operated at essentially full power through the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie Unit 2 DATE: April 1, 2003 COMPLETED BY: J. A. Rogers TELEPHONE: (772) 467-7296 REPORT MONTH: March 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours) Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of March.

I 2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) I - Manual 8 - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 -Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H - Other (Explain)