L-2002-099, April 2002 Monthly Operating Report for Turkey Point Units 3 & 4
| ML021360010 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/13/2002 |
| From: | Mcelwain J Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2002-099 | |
| Download: ML021360010 (3) | |
Text
WI 2M~
FPL L-2002-099 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - April 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the April 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours,
ýJohn a.mcE~
Vice President Turkey Point Plant SM Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company
DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 5/7/2002 COMPLETED BY: Stavroula Mihalakea TELEPHONE: (305) 246-6454 Reporting Period April, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 719 2879 188658.8 No. of hours generator was on line (service hours) 719 2879 186327.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 502638 2051889 121195536 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operatincg Experience Unit 3 operated at essentially 100% for the month until April 27, 2002, when power was reduced to 40% for Turbine Valve Testing and TPCW Heat Exchanger Cleaning. Power was subsequently returned to 100% on April 28, 2002 and remained essentially 100% for the rest of the month.
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 5/7/2002 COMPLETED BY: Stavroula Mihalakea TELEPHONE: (305) 246-6454 Reporting Period April, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net)_ 693 I
I Year-o-aaie
- B m I Montfl I %,umulauve No. of hours reactor was critical 568.2 2512.2 185481.7 No. of hours generator was on line (service hours) 559.5 2503.5 181078.6 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 373959 1747126 118852137 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 was manually tripped as part of the unit shutdown procedure for the refueling outage on March 23, 2002. Unit 4 refueling outage lasted until April 7 1h, 2002. Power was returned to 100% on April 9, 2002 and remained essentially at 100% for the rest of the month.
Text
WI 2M~
FPL L-2002-099 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - April 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the April 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours,
ýJohn a.mcE~
Vice President Turkey Point Plant SM Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company
DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 5/7/2002 COMPLETED BY: Stavroula Mihalakea TELEPHONE: (305) 246-6454 Reporting Period April, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 719 2879 188658.8 No. of hours generator was on line (service hours) 719 2879 186327.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 502638 2051889 121195536 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operatincg Experience Unit 3 operated at essentially 100% for the month until April 27, 2002, when power was reduced to 40% for Turbine Valve Testing and TPCW Heat Exchanger Cleaning. Power was subsequently returned to 100% on April 28, 2002 and remained essentially 100% for the rest of the month.
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 5/7/2002 COMPLETED BY: Stavroula Mihalakea TELEPHONE: (305) 246-6454 Reporting Period April, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net)_ 693 I
I Year-o-aaie
- B m I Montfl I %,umulauve No. of hours reactor was critical 568.2 2512.2 185481.7 No. of hours generator was on line (service hours) 559.5 2503.5 181078.6 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 373959 1747126 118852137 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)
E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience Unit 4 was manually tripped as part of the unit shutdown procedure for the refueling outage on March 23, 2002. Unit 4 refueling outage lasted until April 7 1h, 2002. Power was returned to 100% on April 9, 2002 and remained essentially at 100% for the rest of the month.