Submittal of Response to Non-Cited Violation in NRC Inspection Report 2018-403
ML18149A138
Person / Time
Site: Beaver Valley
Issue date: 05/24/2018
From: Bologna R
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18149A116 List:
References
L-18-150
Download: ML18149A138 (3)


Text

Security Related Information -Withhold Under 10 CFR 2.390 FENOC' RrstEnergy Nuclear Operating Company Richard D. Bologna Site Vice President May 24, 2018 L-18-150 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station P.0.Box4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 Response to Non-Cited Violation in NRC Inspection Report 2018-403 for the Beaver Valley Power Station This letter provides the FirstEnergy Nuclear Operating Company's (FENOC) response to the Non-Cited Violation (NCV) 05000334, 05000412/ 2018403-02 documented in NRC Inspection Report 2018-403, dated April 27, 2018, with errata dated May 9, 2018.

This inspection, conducted from January 28, through March 16, 2018, reviewed implementation of FENOC's Cyber Security Plan and security controls. Respectfully FENOC contests the NCV 05000334, 05000412/ 2018403-02 identified in Inspection Report 2018-403. A detailed assessment is presented in the attachment.

The inspection identified a Green finding and associated NCV of Beaver Valley Power Station (BVPS) facility operating license (FOL) condition 2.0 (BVPS Unit 1) and 2.E (BVPS Unit 2), and the approved cyber security plan (CSP) when FENOC failed to mitigate vulnerabilities and implement cyber security controls.

FENOC contests this violation. As demonstrated in the attachment, FENOC did correctly implement the NEI 13-10, Revision 6 methodology, did correctly assess and identify the referenced components at BVPS Unit 1 and Unit 2 as indirect, and did correctly evaluate and implement the appropriate cyber controls. Therefore, this violation is being contested.

The Attachment to this letter contains Security Related Information and should be withheld from public disclosure. When separated from the Attachment this cover letter may be uncontrolled.

Attachment Contains Security Related Information -Withhold Under 10 CFR 2.390 -

When Separated from Attachment Handle This Document as Decontrolled

Security Related Information - Withhold Under 10 CFR 2.390 Beaver Valley Power Station, Unit Nos. 1 and 2 L-18-150.

Page2 There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Brian Kremer, Manager, Regulatory Compliance at 724-682-4284.

Sincerely,

  • Richard D. Bologna Site Vice President Attachment cc:

Mr. D. C. Lew, Acting NRC Region I Administrator Mr. J. A. Krafty, NRC Senior Resident Inspector Director, Office of Enforcement Attachment Contains Security Related Information - Withhold Under 10 CFR 2.390 -

When Separated from Attachment Handle This Document as Decontrolled

Attachment L-18-150

. Beaver Valley Power Station Response to Non-Cited Violation in NRC Inspection Report 2018-403