L-16-252, Responses to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from L-16-252)
Jump to navigation Jump to search
Responses to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations
ML16239A143
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/19/2016
From: Hamilton D
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Region 3 Administrator
References
L-16-252
Download: ML16239A143 (4)


Text

FENOC' Perry Nuclear Power Plant P.O. Box 97 1O Center Road Perry. Ohio 44081 RrstEnergy Nuclear Operating Company David B. Hamilton 440-280-5382 Vice President August 19, 2016 L-16-252 ATTN: Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, ILL 60532-4352

\

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations This letter provides the Perry Nuclear Power Plant response to NRC Regulatory Issue Summary (RIS) 2016-09, Preparation and Scheduling of Operator_ Licensing Examinations. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide information for scheduling and preparation of operator licensing examinations.

The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for calendar years 2018 through 2021.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Richard Strohl, Manager, Perry Training Section at (440) 280-5335.  :

Sincerely, David B. Hamilton Vice President Enclosure A Operator Licensing Examination Data, NRC Form 536

cc: Ms. Janet Kweiser, Operator Licensing Section, NRC Region Ill Mr. Raymond Keith Walton, Operator Licensing Section, NRC Region Ill NRC Project Manager NRC Resident Inspector NRC Document Control Desk

Enclosure A L-16-252 Operator Licensing Examination Data, NRC Form 536

(

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~(J.;J>P.lt~"'"'"'

information collection is used to plan budgets and resources for operator examinations. Send ti... ~

~

0 OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 lo c F53), U.S. Nuclear Regulatory Commission, Washington, DC2055~001, or by e-mail to

\ 4'~ EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~I) >rO NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means

....*** used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Perry Nuclear Power Plc;lnt Docket No. 50-440, License No. NPF-58 3 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED EXAMINATIONS

8. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 4 4 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 8 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 PROPOSED DATES PRIMARY DATE: 2/11/2019 \ 2/15/2021 ALTERNATE DATE 2/18/2019 2/8/2021
c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION {GFE) SCHEDULE PROPOSED NUMBER MARCH CY

-2017 SEPTEMBER MARCH CY 2018

--- SEPTEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (05-2016)