MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-201, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis L-22-104, Annual Radiological Environmental Operating Report2022-04-28028 April 2022 Annual Radiological Environmental Operating Report L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-22-105, Annual Radiological Effluent Release Report2022-04-27027 April 2022 Annual Radiological Effluent Release Report L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant2022-03-16016 March 2022 Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) 2024-01-24
[Table view] |
Text
FENOC' Perry Nuclear Power Plant P.O. Box 97 10 Center Road Perry, Ohio 44081 RrstEnergy Nuclear Operating Company David B. Hamilton 440-280-5382 Vice President June 7, 2016 L-16-142 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Perry Nuclear Power Plant
,,, Docket No. 50-440, License No. NPF-58 Commitment to Modify Undervoltage/Degraded Voltage Protection Design As a result of an everit at the Perry Nuclear Power Plant (PNPP) that involved loss of power to Division one shutdown cooling during shutdown, a vulnerability was identified in the original design of the undervoltage/degraded voltage (UV/DV) protection circuitry. Specifically, the issue was revealed on February 11, 2016, when a single fuse on one phase of the division one 4.16 kV safety bus failed, causing the UV/DV protection circuitry to satisfy the coincidence logic and separate that bus from the offsite power source. This event was documented in PNPP Licensee Event Report 2016-003 (ADAMS Accession No. ML16104A024). This event was characterized as an unresolved item (URI) during the Special Inspection conducted at PNPP starting February 29, 2016, and documented in Reactive Inspection Report 05000440/2016008 (ADAMS Accession No. ML16057A039), dated May 25, 2016.
This issue involves the original UV/DV design, as documented in PNPP's original licensing safety evaluation report (NUREG-0887). FirstEnergy Nuclear Operating Company (FENOC) has determined that the design of the UV/DV circuits requires modification to address the issue.
Therefore, FENOC commit!:do installing a modification to the UV/DV protection scheme for the division one, two and three 4.16kV safety buses that will prevent a failed fuse from satisfying the coincident logic and causing a separation of the offsite power source from the safety bus when no UV/DV condition exists.
FENOC has initiated the design modification process and preliminarily identified a solution that is consistent with other industry UV/DV protection designs. As part of the design modification development, FENOC will determine if a license amendment is required to address UV/DV -
________________ Technical Specification setpoints or other-changes to.the current PNPP licensing basis. The - ----------
new design will be finalized and any required license amendment requests will be submitted to the NRC by November 1, 2016.
- To preclude the risks associated with an inadvertent separation of the offsite power source from the safety buses during installation, the modification will require installation during a refueling outage. However, even during a refueling outage, the new design must be installed and tested on a divisional basis to manage shutdown risk. _As such, FENOC commits to have the new design installed and tested by the second refueling outage after NRC approval of any required
. Aool Mfll
Perry Nuclear Power Plant L-16-142 Page2 license amendment request, but no later than startup from refuel outage 1R18 scheduled to begin in March 2021. ",
Based on a review of the applicable design basis documents and recent surveillance history, the current configuration of the UV/DV protection circuitry remains capable of performing its intended safety function, which is to detect a sustained degraded voltage condition or loss of power to its associated 4.16kV s'afety bus, then *separate the offsite source and start the associated emergency diesel generator (EDG). Therefore, FENOC has determined that the UV/DV protection circuitry and the associated 4.16kV safety buses remain operable in accordance with the plant's Technical Specifications. The condition that occurred on February 11, 2016, is bounded by the worst case single failure, which is the loss of an EDG.
It is unlikely that a similar fuse failure would occur based on the evaluation by FENOC and the vendor, which found this issue to be an isolated event. No previous instances of this type of failure have been observed at PNPP, and examination of additional fuses of the same part number from the same manufacturing lot revealed no evidence that the isolated manufacturing error is a recurring event.
Until final installation of the modification, the following compensatory actions will remain in place:
- An operations standing order was issued to address operator response in the event a similar fuse malfunction was to occur.
- Operators have received informational training on the expected response to a fuse malfunction in the UV/DV voltage circuitry.
- Operators will be periodically retrained on the fuse malfunction through licensed operator continuing training. .,
- A work order package with spare fuses is staged to replace a failed fuse in the event a similar malfunction was to occur.
-- Attachment 1 identifies the regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Nicola F. Conicella, Manager - Regulatory Compliance, at 440-280-5415.
/ Sincerely, David B. Hamilton Attachments:
- 1. Regulatory Commitment List cc: Director, Office of Nuclear Reactor Regulation (NRR)
NRC Region Ill Administrator NRC Resident Inspector NRR Project Manager
Attachment 1 Perry Nuclear power Plant L-16-142 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for the Perry Nuclear Power Plant (PNPP), in this document. Any other actions discussed in the"_submittal represent intended or planned actions by FENOC. They are described only as information and are not Regulatory Commitments. Please notify Mr. Nicola F.
Conicella, Manager - Regulatory Compliance, at 440-280-5415, of any questions regarding this document or associated Regulatory Commitments.
Regulatory Commitment Due Date
- 1. FENOC will implement a design modification of the The second refueling outage Undervoltage/Degraded Voltage (UV/DV) protection after NRC approval of any scheme for the Division one, two and three 4.16kV safety required license amendment buses that will prevent a failed fuse from improperly request but no later than satisfying the coincident logic and causing a separation of startup from refuel outage the offsite power source from the safety bus when no 1R18 scheduled to begin in UV/DV condition exists. March 2021.
- 2. Until final installation of the modification compensatory The second refueling outage actions will remain in place. after NRC approval of any required license amendment request but no later than startup from refuel outage 1R18 scheduled to begin in March 2021.