FENOC' Beaver Valley Power Station P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Marty L. Richey 724-682-5234 Site Vice President Fax: 724-643-8069 March 21, 2016 L-16-090 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Notification of Management Change Due to a change in management at the Beaver Valley Power Station, please use the following as the primary recipient of Nuclear Regulatory Commission (NRC) correspondence related to the Beaver Valley Power Station:

Marty L. Richey Site Vice President There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at (330) 315-6810.

Sincerely, Marty L. Richey cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative

FENOC' Beaver Valley Power Station P.O. Box 4 FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Marty L. Richey 724-682-5234 Site Vice President Fax: 724-643-8069 March 21, 2016 L-16-090 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Notification of Management Change Due to a change in management at the Beaver Valley Power Station, please use the following as the primary recipient of Nuclear Regulatory Commission (NRC) correspondence related to the Beaver Valley Power Station:

Marty L. Richey Site Vice President There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -

Fleet Licensing, at (330) 315-6810.