MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-201, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis L-22-104, Annual Radiological Environmental Operating Report2022-04-28028 April 2022 Annual Radiological Environmental Operating Report L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-22-105, Annual Radiological Effluent Release Report2022-04-27027 April 2022 Annual Radiological Effluent Release Report L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant2022-03-16016 March 2022 Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) 2024-01-24
[Table view] |
Text
FENOC Perry Nuclear Power Plant PO Box 97
^ 10 Center Road FirstEnergy Nuclear Operating Company Perry- Ohl° 44081 Ernest J.Harkness 440-280-5382 Vice President Fax 440-280-8029 November 20, 2015 L-15-332 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Commitment to Maintain Severe Accident Management Guidelines The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes FirstEnergy Nuclear Operating Company (FENOC) commitments related to SAMGs for Perry Nuclear Power Plant. These guidelines would be used by emergency response personnel during conditions in which significant damage to fuel in the reactor vessel or spent fuel pool is occurring or is imminent. SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.
The new SAMG commitments are listed in the Attachment.
It is expected that NRC staff personnel will conduct periodic inspection of our Severe Accident Management Guidelines and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. Inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.
If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager- Fleet Licensing, at 330-315-6810.
Sincerely, Ernest J. Harkness
Perry Nuclear Power Plant, Unit No. 1 L-15-332 Page 2
Attachment:
Regulatory Commitment List cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector Director, Office of Nuclear Reactor Regulation (NRR)
Utility Radiological Safety Board
Attachment L-15-332 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for Perry Nuclear Power Plant (PNPP) in this document. Any other actions discussed in the submittal represent intended or planned actions by FENOC.
They are described only as information and are not Regulatory Commitments. Please notify Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-6810 of any questions regarding this document or associated Regulatory Commitments.
TYPE (Check One) SCHEDULED COMPLETION COMMITMENT ONE CONTINUING DATE TIME COMPLIANCE ACTION
- 1. FENOC will consider the PNPP X October 31, site SAMGs within plant 2016 configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time.
- 2. FENOC will update the PNPP site X June 30, 2017 SAMGs to revision 3 of the BWROG generic severe accident guidelines (published February 2013).
- 3. FENOC will update the PNPP site X Within 2 SAMGs to future revisions of the refueling outages BWROG generic severe accident or 3 years of the technical guidelines, and the publication date SAMGs will be integrated with of the guidelines, other emergency response whichever is guideline sets and symptom- greater based Emergency Operating Procedures, and validated, using the guidance in NE114-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.1 Note 1 - Use of the NEI 14-01 guidance begins with the update to revision 4 of the BWROG generic severe accident guidelines.
FENOC Perry Nuclear Power Plant PO Box 97
^ 10 Center Road FirstEnergy Nuclear Operating Company Perry- Ohl° 44081 Ernest J.Harkness 440-280-5382 Vice President Fax 440-280-8029 November 20, 2015 L-15-332 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Commitment to Maintain Severe Accident Management Guidelines The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes FirstEnergy Nuclear Operating Company (FENOC) commitments related to SAMGs for Perry Nuclear Power Plant. These guidelines would be used by emergency response personnel during conditions in which significant damage to fuel in the reactor vessel or spent fuel pool is occurring or is imminent. SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.
The new SAMG commitments are listed in the Attachment.
It is expected that NRC staff personnel will conduct periodic inspection of our Severe Accident Management Guidelines and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. Inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.
If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager- Fleet Licensing, at 330-315-6810.
Sincerely, Ernest J. Harkness
Perry Nuclear Power Plant, Unit No. 1 L-15-332 Page 2
Attachment:
Regulatory Commitment List cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector Director, Office of Nuclear Reactor Regulation (NRR)
Utility Radiological Safety Board
Attachment L-15-332 Regulatory Commitment List Page 1 of 1 The following list identifies those actions committed to by FirstEnergy Nuclear Operating Company (FENOC) for Perry Nuclear Power Plant (PNPP) in this document. Any other actions discussed in the submittal represent intended or planned actions by FENOC.
They are described only as information and are not Regulatory Commitments. Please notify Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-6810 of any questions regarding this document or associated Regulatory Commitments.
TYPE (Check One) SCHEDULED COMPLETION COMMITMENT ONE CONTINUING DATE TIME COMPLIANCE ACTION
- 1. FENOC will consider the PNPP X October 31, site SAMGs within plant 2016 configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time.
- 2. FENOC will update the PNPP site X June 30, 2017 SAMGs to revision 3 of the BWROG generic severe accident guidelines (published February 2013).
- 3. FENOC will update the PNPP site X Within 2 SAMGs to future revisions of the refueling outages BWROG generic severe accident or 3 years of the technical guidelines, and the publication date SAMGs will be integrated with of the guidelines, other emergency response whichever is guideline sets and symptom- greater based Emergency Operating Procedures, and validated, using the guidance in NE114-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents.1 Note 1 - Use of the NEI 14-01 guidance begins with the update to revision 4 of the BWROG generic severe accident guidelines.