L-12-384, Emergency Response Data System Data Point Library Update

From kanterella
Jump to navigation Jump to search
Emergency Response Data System Data Point Library Update
ML12296A083
Person / Time
Site: Beaver Valley
Issue date: 10/19/2012
From: Harden P
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-12-384
Download: ML12296A083 (4)


Text

FirstEnergy Nuclear Operating Company Paul A. Harden Site Vice President Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 October 19, 2012 L-12-384 10 CFR 50, Appendix E, Section VI ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit No.2 Docket No. 50-412, License No. NPF-73 Emergency Response Data System Data Point Library Update In accordance with 10 CFR 50, Appendix E, Section VI, an update of the Emergency Response Data System (ERDS) Data Point Library (DPL) for Beaver Valley Power Station, Unit No.2 (BV2), is provided. An attachment provides the details regarding the change, and a copy of the updated DPL page is enclosed.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager-Fleet Licensing, at 330-315-6810.

Attachment:

Summary of Changes to Data Point Library

Enclosure:

Beaver Valley Power Station ERDS Data Point Library, Updated Page cc:

NRC Region I Administrator NRC Resident Inspector NRC Project Manager (w/o enclosures)

Director BRP/DEP Site BRP/DEP Representative

Reactor DPL Unit Point BV2 UF1013 Attachment L-12-384 Summary of Changes to Data Point Library Page 1 of 1 Description of Change(s)

Maximum Instr Range: changed from "195" to "250"

Enclosure L-12-384 Beaver Valley Power Station EROS Data Point Library, Updated Page (1 page follows)

BEAVER VALLEY POWER STATION ERDS DATA POINT LIBRARY Dale; 10/6/2012 Reaolor Unil; BV.2 Dala feeder; pCS NRC EROS Parameter; RCS-CHG-MLJ Point 10:

LJJ=1013 Planl Spec Polnl De80.:

TOTAL CHARGING FLOW Generlc/Cond Desc.:

PRIMARY SYSTEM CHG OR MLJ rLOW Anarog/Dlgllar:

A Engr Units/Dig Siales:

GPM Engr Units Conversion; N/A Minimum Inslr Range:

0 Maximum Ins[{ Range:

250 Zero Point RMateI1CA:

NfA Referance Poll'll NOles:

NfA PROC or SENS:

P Number of Sen~W$: 4 How Processed:

ADD Sensor LocatlO(l:

SEE UNIQUE SYSTEM DESCRIPTION FIELD AlarmfTrip Se\\ Points:

N/A NI DlIlt,lclor Power Supply Cul*Off Power Level; NIA NI DalaclOf Power Supply Turn-ON Power Level:

N/A Instrument Failure Mode; LOW T 6mparatI,Jre Compensallon ror DP Transmitters; N

Level Reference Leg; N/A Unique System DesG.;

lotal Charging Flow 1$ computed on lhll Plant Computer by adding the CHG LINE FlW CHS-FT122 (F0126A), and !he three RCP SEAL lNJECTION flows (F0131A, RCP 21A SEAL INJ FLOW CHS*FT130; F0129A, Rep 218 SEAL INJ fLOW CHS*FT127; and F0127A. RCP 21C SEAL INJ FL.OW eHS-FT124).

2-51